BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//CERN//INDICO//EN
BEGIN:VEVENT
SUMMARY:Test
DTSTART;VALUE=DATE-TIME:20010611T220000Z
DTEND;VALUE=DATE-TIME:20010611T220000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01462@cern.ch
DESCRIPTION:test\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a014
 62
LOCATION:CERN
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01462
END:VEVENT
BEGIN:VEVENT
SUMMARY:Civil Engineering at Point 8 & LHCb Experiment
DTSTART;VALUE=DATE-TIME:20010611T123000Z
DTEND;VALUE=DATE-TIME:20010611T123000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01686@cern.ch
DESCRIPTION:The meeting will be dedicated to the CE works around the Point
  8.\nStatus reports from both parties ST/CE Group & LHCb Expt Area Team wi
 ll be presented.\nThe following points will be reviewed :\n1 - Surface Are
 a (temporary storage for LHCb) in front of the SG8 building\n2 - Preparati
 on of the UX85 area for the reinforcement of the headwall\n3 - Fixed parts
  of 6he radiation shielding wall for LHCb\n4 - Small CE works at teh entra
 nce of the LHC tunnel RB84 side.\n\nhttp://indico.cern.ch/conferenceDispla
 y.py?confId=a01686
LOCATION:CERN 2889-R-001
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01686
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area Team
DTSTART;VALUE=DATE-TIME:20010618T123000Z
DTEND;VALUE=DATE-TIME:20010618T123000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01588@cern.ch
DESCRIPTION:The dismantling of DELPHI is considered to be completed by Fri
 day 25 May 2001. From 1st June 2001 the LHCb Expt Area Team takes over the
  responsability of the expt area UX85. The re-organisation of the team wit
 h people coming from DELPHI is proposed. \n\nMEETING ON 18 JUNE 2001 AT 14
 :30 IN BDG 530 R-030\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=
 a01588
LOCATION:CERN 530-R-030
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01588
END:VEVENT
BEGIN:VEVENT
SUMMARY:Review of the LHCb Cooling Power Requirements
DTSTART;VALUE=DATE-TIME:20010813T123000Z
DTEND;VALUE=DATE-TIME:20010813T133000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01579@cern.ch
DESCRIPTION:CDD Drawings of the modifications to the pumping station in th
 e UW85 area have been launched on 23 July for approval with deadline 7 Aug
 ust 2001. The drawings have been rejected by D.Lacarrère on 6 August . Co
 oling Power assigned  to LHCb is too low. One iteration more with CERN exp
 erts (ST/CV) is necessary in order to upgrade the pumping station.\n\nMEET
 ING ON 13 AUGUST AT 14:30 IN BDG 530 R-030\n\nhttp://indico.cern.ch/confer
 enceDisplay.py?confId=a01579
LOCATION:CERN 530-R-030
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01579
END:VEVENT
BEGIN:VEVENT
SUMMARY:Machine Cryogenics in UX85 Area :  New Layout & Routing of the QRL
DTSTART;VALUE=DATE-TIME:20010816T130000Z
DTEND;VALUE=DATE-TIME:20010816T134500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01584@cern.ch
DESCRIPTION:The new layout of the installation of the cryogenics for LHC m
 achine will be presented. The new routing of the QRL both sides of the LHC
 b spectrometer will also be precised.\nFurther details\, please refer to t
 he following drawings using CONSULT tool :\nQ0012633PL = New Layout of Cry
 ogenics in the UX85 Area\nQ0012631PL = New routing of the QRL RB84 Side (i
 n front of the IP8)\nQ0012623PL = New routing of the QRL RB86 Side (just b
 ehind the last muon absorber)\n\nMEETING ON 17 AUGUST 2001 AT 15:00 IN BDG
  376 1-016\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a01584
LOCATION:CERN 376-1-016
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01584
END:VEVENT
BEGIN:VEVENT
SUMMARY:Status of UX85 Area  (end of August 2001)
DTSTART;VALUE=DATE-TIME:20010827T123000Z
DTEND;VALUE=DATE-TIME:20010827T123000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01580@cern.ch
DESCRIPTION:Since 1st June 2001\, the LHCb Expt Area Team took over the re
 sponsibility for the UX85 area at Point 8. The first major works were dedi
 cated to the preparation of UX85 for the civil engineering (CE) (reinforce
 ment of the end-wall + fixed parts of the radiation shield). The worksite 
 will start on 28 September 2001 (ST/CE). The UX85 area from the TX tunnel 
 to the PZ shaft is becoming empty (general services interrupted\, metallic
  structures ready to be removed). The status of  UX85 area will be reporte
 d. The ST/CE will become responsible for this area from 28 September 2001 
 until 14 June 2002.  \n\nMEETING ON 27 AUGUST 2001 AT 14:30 IN BDG 2889 R-
 001 POINT 8\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a01580
LOCATION:CERN 2889-R-001
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01580
END:VEVENT
BEGIN:VEVENT
SUMMARY:Transportation & Handling via the PX shaft during CE phase
DTSTART;VALUE=DATE-TIME:20010829T123000Z
DTEND;VALUE=DATE-TIME:20010829T123000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01687@cern.ch
DESCRIPTION:We are approaching the first important milestone for the Point
  8\nwhich is the starting of the CE in the underground areas (28 September
  2001). \nWe (LHCb Expt Area) are ready to leave the UX85 area empty (from
  the TX \ntunnel up to the PZ shaft) to the ST/CE Group by 21 September 20
 01\, as scheduled.\nHowever\, the transportation\, handling and temporary 
 storage of the recovered \nmetallic structures (first work to be achieved 
 by the CE contractor) require\nclarification from both parties ST/CE Group
  & LHCb Expt Area.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a0
 1687
LOCATION:CERN 2889-R-001
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01687
END:VEVENT
BEGIN:VEVENT
SUMMARY:Review of the Air Ventilation System in the UX85 Area
DTSTART;VALUE=DATE-TIME:20010927T080000Z
DTEND;VALUE=DATE-TIME:20010927T093000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01685@cern.ch
DESCRIPTION:The baseline of the Air ventilation System in the UX85 area wi
 ll be revisited\, in particular the system in the detector area. \nA few s
 implifications seem to be possible.  Substantial savings are  expected.\n\
 nhttp://indico.cern.ch/conferenceDisplay.py?confId=a01685
LOCATION:CERN 530-R-044
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01685
END:VEVENT
BEGIN:VEVENT
SUMMARY:Review of the Radiation Shield in the UX85 Area
DTSTART;VALUE=DATE-TIME:20011008T123000Z
DTEND;VALUE=DATE-TIME:20011008T123000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01581@cern.ch
DESCRIPTION:The Radiation Shield in the UX85 area consists of four parts (
 roughly 3000 t) : a) fixed parts both sides of the cavern\, b) central par
 t with eight pre-stressed concrete beams (just below the crane) \, c) the 
 top part with appropriate segmented concrete blocks and d) a large front d
 oor. The review of the engineering design is planned for 8 October 2001. T
 he passage of all the services and the cabling detectors/counting rooms wi
 ll be revisited also. The radiation protection will be checked once again 
 with TIS/RP\, when the sizing of the holes and chicanes will be finalised.
 The construction of the fixed pillars (cast concrete) is now planned for F
 ebruary 2002. The central part (beams) will be  pre-fabricated over 2003. 
 Recovered standard blocks will be re- used for erecting the rest of the sh
 ield. The installation of the central & top parts is scheduled for the end
  of 2004. The front door will be placed ust at the last minute (end of Dec
 ember 2005).\n\nMEETING ON 08 OCTOBER 2001 AT 14:30 IN BDG 2889 R-009 POIN
 T 8.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a01581
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01581
END:VEVENT
BEGIN:VEVENT
SUMMARY:Cryoplant in UX85 Area - Preparation of Approval of drawings in CD
 D
DTSTART;VALUE=DATE-TIME:20011022T123000Z
DTEND;VALUE=DATE-TIME:20011022T123000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01770@cern.ch
DESCRIPTION:We are received a set of drawings about the new layout of cryo
 plant & routing of QRL both sides of the LHCb detector.\nThe drawings must
  be commented and approved in CDD before 31 October 2001. This meeting is 
 dedicated  to analyse in detail the drawings. The objective is to prepare 
 a formulation of our possible comments by end of October.\n\nhttp://indico
 .cern.ch/conferenceDisplay.py?confId=a01770
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01770
END:VEVENT
BEGIN:VEVENT
SUMMARY:Review of LHCb Electrical Power Requirements in the UX85 Area
DTSTART;VALUE=DATE-TIME:20011029T133000Z
DTEND;VALUE=DATE-TIME:20011029T133000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01771@cern.ch
DESCRIPTION:This LHCb Expt Area Meeting will be dedicated to the following
  items :\nAgenda :\n1 - Review of LHCb Electrical Power Requirements in UX
 85 Area\n2 - Review of vertical cabling across the PM85 shaft\n3 - Approva
 l of drawings in CDD (deadline 31 Oct.)\n4 - AOB\n\nhttp://indico.cern.ch/
 conferenceDisplay.py?confId=a01771
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01771
END:VEVENT
BEGIN:VEVENT
SUMMARY:Refurbishment of barrack 2889 at Point 8
DTSTART;VALUE=DATE-TIME:20011105T133000Z
DTEND;VALUE=DATE-TIME:20011105T133000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01826@cern.ch
DESCRIPTION:The refurbishment of the barrack 2889 (ex-DELPHI) at Point 8 i
 s planned to be achieved progressively over several months (roughly Novemb
 er 2001 until June 2002). The first part of the renewation programme is th
 e following :  Meeting room (R-009) + 2 offices (R-001 & R--002).\nAchieve
 ment of this first part is planned for the end of 2001.\n\nhttp://indico.c
 ern.ch/conferenceDisplay.py?confId=a01826
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01826
END:VEVENT
BEGIN:VEVENT
SUMMARY:Handling & Transportation Team for LHCb at Point 8 - Status
DTSTART;VALUE=DATE-TIME:20011119T133000Z
DTEND;VALUE=DATE-TIME:20011119T133000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01828@cern.ch
DESCRIPTION:Since 1st June 2001\, the DBS Team devoted to the handling and
  transportation work for LHCb at Point 8 is composed only of three crane-d
 rivers\n(Team Leader + 2 ). The experiment CAST located in the surface bui
 lding SR8 has required support for installation from October 2001. \nLHCb 
 Expt Area Team has accepted to share the DBS Team in order to keep just on
 e DBS team at Point 8 for EP works. \nThe cost (5400  SFR/ man-month) will
  be shared between the 2 experiments according to the previous agreement..
 \n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a01828
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01828
END:VEVENT
BEGIN:VEVENT
SUMMARY:Update of Engineering Drawings - Status
DTSTART;VALUE=DATE-TIME:20011126T133000Z
DTEND;VALUE=DATE-TIME:20011126T133000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01846@cern.ch
DESCRIPTION:AGENDA :\n1 - Update of Engineering Drawings - Status\n2 - Mec
 hanical Supports for LHCb sub-detectors - Status\n3 - AOB (re-arrangement 
 in SG8\,...)\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a01846
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01846
END:VEVENT
BEGIN:VEVENT
SUMMARY:EDMS - Engineering Data Management System
DTSTART;VALUE=DATE-TIME:20011205T080000Z
DTEND;VALUE=DATE-TIME:20011205T080000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01891@cern.ch
DESCRIPTION:EDMS - Engineering Management System with Web Interface is now
  a well\nestablished computing tool at CERN with appropriate features for 
 managing all the\ntypes of engineering documents\, drawings\, manufacturin
 g and testing folders\, and\nmaintenance purposes. The use of EDMS provide
 s the possibility to create a well\norganised technical documentation and 
 gives a good traceability of all the\ncomponents and processes. Data well 
 recorded and identified with a rapid access\nwill be essential and useful 
 items in near future for an efficient operation and\nmaintenance of the sy
 stems.\nSince 2000\, an EDMS pilot project for LHCb has been launched by t
 he LHCb \nExpt Area Team. The use of EDMS has initially been focused on th
 e infrastructure\nissues\, for managing engineering documents and drawings
 . However\, the EDMS tree\nstructure and the work-space for all the LHCb s
 ub-detectors are already active\nand accessible via Web interface\, Now\, 
 it is time to move on the phase of production\nand implementation of the L
 HCb engineering documents and drawings in EDMS.\n\nPROVISIONAL AGENDA (see
  below)\nROOM to be confirmed\n\nhttp://indico.cern.ch/conferenceDisplay.p
 y?confId=a01891
LOCATION:CERN 30-7-012
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01891
END:VEVENT
BEGIN:VEVENT
SUMMARY:Experimental Area Issues
DTSTART;VALUE=DATE-TIME:20011210T133000Z
DTEND;VALUE=DATE-TIME:20011210T133000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a01892@cern.ch
DESCRIPTION:AGENDA :\n\n1  -  CE Work in UX85 - Planning changes (?)\n2  -
   PSIWG Meeting 11 December - Preparation\n3  -  Comments on EDMS document
  no 327759 *\n4  -  X-mas Lab. Shutdown - Safety Instructions\n5  -  AOB (
 DBS Team\, Workload\, Gas bdg SG8\,....)\n\n*  " Installer les services g
 énéraux pour le LHC dans le secteur 7-8 "\;\n      draft 2 \; deadline =
  20 December 2001\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a01
 892
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a01892
END:VEVENT
BEGIN:VEVENT
SUMMARY:Progress on CE in UX85\, Radiadion Shield & Mechanical Support for
  Magnet
DTSTART;VALUE=DATE-TIME:20020130T133000Z
DTEND;VALUE=DATE-TIME:20020130T151500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02189@cern.ch
DESCRIPTION:AGENDA :\n\n1 - Progress on CE in the UX85 area & dust problem
 s from octant 7-8 (?)\n2 - Progress on modularity of Radaition Shield (J.I
 maschewski)\n3 - Progress on mechanical support for LHCb dipole (J.Renaud)
 \n4 - AOB (update of drawings\, EDMS\, temporary storage\, re-organisation
  SG8\,.....) \n\nMeeting in barrack 2889 (ex-DELPHI) at Point 8\n\nhttp://
 indico.cern.ch/conferenceDisplay.py?confId=a02189
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02189
END:VEVENT
BEGIN:VEVENT
SUMMARY:Infrastructure - UX85 Expt Area Issues
DTSTART;VALUE=DATE-TIME:20020213T133000Z
DTEND;VALUE=DATE-TIME:20020213T133000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02271@cern.ch
DESCRIPTION:AGENDA :\n\n1 - Revised planning for cutting ex-LEP shield con
 crete blocks (RB84 Area)\n2 - Cleaning of the UX85 Area after the CE work 
 \n3 - Metallic structures (ex-DELPHI) to be re-installed (PZ Area)\n4 - SF
  cooling towers & pumping stations at Point 8 (EDMS ST/CV Document no 3350
 22)\n5 - General Services across the radiation shield\n6 - AOB (DELPHI bar
 rel\, update of drawings\,....)\n\nNotice : Meeting will be held in the ex
 -DELPHI barrack 2889 at Point 8\n\nhttp://indico.cern.ch/conferenceDisplay
 .py?confId=a02271
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02271
END:VEVENT
BEGIN:VEVENT
SUMMARY:EDMS/CDD Forum & Tutorial
DTSTART;VALUE=DATE-TIME:20020220T080000Z
DTEND;VALUE=DATE-TIME:20020220T110000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02285@cern.ch
DESCRIPTION:An EDMS/CDD forum and tutorial is planned for Wednesday 20 Feb
 . from 9:00 until 12:00. Those have questions or practical problems relate
 d to the use of EDMS/CDD are invited to participate to this forum and shor
 t tutorial.\n\nPLACE : LHC AMPHI. IN BDG 30\n\nhttp://indico.cern.ch/confe
 renceDisplay.py?confId=a02285
LOCATION:CERN 30-7-018
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02285
END:VEVENT
BEGIN:VEVENT
SUMMARY:Integration - Review of the Mechanical Support for the LHCb Magnet
DTSTART;VALUE=DATE-TIME:20020313T133000Z
DTEND;VALUE=DATE-TIME:20020313T163000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02286@cern.ch
DESCRIPTION:The engineering design of the mechanical support dedicated to 
 the LHCb magnet\,\nperformed by J.André\, is now  almost completed. In or
 der to start the modifications to\nthe ex-DELPHI waggons (supports of end-
 caps)\, we propose to make the detailed review\nof this topic on Wednesady
  13 March 2002.\n\nAGENDA (see below)\nMeeting Room 2889 R-009 (POINT 8)\n
 \nhttp://indico.cern.ch/conferenceDisplay.py?confId=a02286
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02286
END:VEVENT
BEGIN:VEVENT
SUMMARY:Infrastructure - Brief Status Report on CE in the UX85 Cavern
DTSTART;VALUE=DATE-TIME:20020320T133000Z
DTEND;VALUE=DATE-TIME:20020320T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02606@cern.ch
DESCRIPTION:A brief status report on the progress of the CE works in the U
 X85 cavern is presented. This document will be sent to the LHCb Management
  for the preparation the RRB Meeting scheduled for 23 April 2002.\n\nMeeti
 ng Room 2889 R-009 (POINT 8)\n\nhttp://indico.cern.ch/conferenceDisplay.py
 ?confId=a02606
LOCATION:CERN 2289-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02606
END:VEVENT
BEGIN:VEVENT
SUMMARY:Infrastructure - Current tasks (review)
DTSTART;VALUE=DATE-TIME:20020410T123000Z
DTEND;VALUE=DATE-TIME:20020410T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02547@cern.ch
DESCRIPTION:Review of the current tasks for the LHCb Expt Area Team :\n- A
 ccess to LHC underground areas (safety course) - LHCb milestones missing\n
 - Cleaning of UX85 Area (preparation)\n- Cutting of the concrete RB84 regi
 on (preparation)\n- Ventilation ducts and cryogenics in the UX85 area (?)\
 n- Mechanical support for the LHCb magnet (status & tasks)\n- DELPHI Barre
 l in the UX85 area (preparation)\n\nMeeting Room 2889 R-009 (POINT 8)\n\nh
 ttp://indico.cern.ch/conferenceDisplay.py?confId=a02547
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02547
END:VEVENT
BEGIN:VEVENT
SUMMARY:Infrastructure - Cleaning of the UX85 Cavern
DTSTART;VALUE=DATE-TIME:20020417T123000Z
DTEND;VALUE=DATE-TIME:20020417T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02549@cern.ch
DESCRIPTION:The completion of the CE Head-wall reinforcement in the UX85 c
 avern is scheduled for the end of May 2002. Various tasks in the UX85 area
  must be performed in a very short time (4 weeks) in order to start the cu
 tting of concrete in the RB84 region by July 2002. The cleaning of the cav
 ern is the most heavy task which merits to be well managed with our ST col
 leagues.\n\nAGENDA :\n\n1 - Cleaning of UX85 cavern (cranes first starting
  on May)\n2 - Displacement of DELPHI barrel + counting rooms D (2 weeks)\n
 3 - Dismantling & removing of the last concrete blocks RB84 side (2 weeks)
 \n4 - Update of planning for May-September 2002\n5 - Discussion & task par
 tition\n\nMeeting Room 2889 R-009 (POINT 8)\n\nhttp://indico.cern.ch/confe
 renceDisplay.py?confId=a02549
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02549
END:VEVENT
BEGIN:VEVENT
SUMMARY:Survey - Hydrostatic System for the inner triplets at Point 8
DTSTART;VALUE=DATE-TIME:20020429T123000Z
DTEND;VALUE=DATE-TIME:20020429T134000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02550@cern.ch
DESCRIPTION:A hydrostatic system is required for the alignment of the inne
 r triplets. The survey Group (EST/SU) proposes us a first presentation of 
 the conceptual design of the hydrostatic system planned. The adaptation to
  the IP8 area will be investigated. \n\nMeeting Room 2889 R-009 (POINT 8)\
 n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a02550
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02550
END:VEVENT
BEGIN:VEVENT
SUMMARY:Infrastructure - Cleaning  Phase 1 at Point 8 (follow-up)
DTSTART;VALUE=DATE-TIME:20020508T123000Z
DTEND;VALUE=DATE-TIME:20020508T131000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02675@cern.ch
DESCRIPTION:At the LHCb Expt Area meeting held on the 17th April 2002\, we
  have jointly decided to prepare the cleaning (phase 1) of the underground
  areas at Point 8. The main objective is to have the cranes (1x40t & 2x40t
 ) in working order in the UX85 cavern by 3rd June 2002. We are now ready t
 o start the cleaning from 13 May until 31 May 2002 as scheduled. This meet
 ing is dedicated to review the last details. All the partners (ST Groups &
  SL/ML) involved in works in this region are invited to express their comm
 ents and agreement.\n\nAGENDA (see below)\n\nMeeting Room 2889 R-009 (POIN
 T 8)\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a02675
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02675
END:VEVENT
BEGIN:VEVENT
SUMMARY:Metallic Structures PZ Area
DTSTART;VALUE=DATE-TIME:20020522T130000Z
DTEND;VALUE=DATE-TIME:20020522T133000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02895@cern.ch
DESCRIPTION:The completion of the Civil Engineering (CE) on the head-wall 
 is scheduled for Friday 14 June 2002. The concrete structure will be finis
 hed. However\, the associated metallic structures (stairs\, "garde-corps &
  trémie" ) will be not installed as foreseen. The re-construction (as bui
 lt for DELPHI) requires a new plan to be defined with our ST colleagues (S
 T/CE & ST/DI) a.s.a.p.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confI
 d=a02895
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02895
END:VEVENT
BEGIN:VEVENT
SUMMARY:Review of the Current Tasks in UX85 Area
DTSTART;VALUE=DATE-TIME:20020612T123000Z
DTEND;VALUE=DATE-TIME:20020612T130000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02896@cern.ch
DESCRIPTION:The civil engineering work on the head-wall (PZ Area) will be 
 completed * by 14 June 2002. The LHCb Expt Area Team has just 2 weeks (unt
 il 28 June 2002) for moving equipment from the end of the UX85 towards to 
 the PZ shaft. The main goal is to clear the RB84 area as required\, in ord
 er to proceed to cutting the concrete blocks over the period 1 July - 23 A
 ugust 2002 (official LHC Planning).\n\n* Completion of the concrete struct
 ures only\, associated metallic structures (as built for DELPHI) will be r
 e-built with the ST/CE support using another contract (ST/DI) under the LH
 Cb Expt Area supervision.\n\nAGENDA (see below)\n\nMeeting Room 2889 R-009
  (POINT 8)\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a02896
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02896
END:VEVENT
BEGIN:VEVENT
SUMMARY:Radiation Shield in the UX85 Area - Additional Calculations
DTSTART;VALUE=DATE-TIME:20020617T123000Z
DTEND;VALUE=DATE-TIME:20020617T131500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02897@cern.ch
DESCRIPTION:We have improved the engineering design of the radiation shiel
 d in the UX85 area. The passages with chicanes for general services and ca
 bling are now two slits of 4000 x 350 mm2 both sides of the large front do
 or. At the last ad-hoc meeting (present : S.R\, G.S\, J.I\, R.L & D.L) hel
 d on February 2002\, we have jointly decided to plan additional calculatio
 ns over June-July 2002.\n\nAGENDA (see below)\n\nMeeting Room Bdg 530 R-03
 0 (Meyrin site)\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a0289
 7
LOCATION:CERN 530-R-030
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02897
END:VEVENT
BEGIN:VEVENT
SUMMARY:Mechanical Supports for Muon Detection System & Magnet
DTSTART;VALUE=DATE-TIME:20020619T130000Z
DTEND;VALUE=DATE-TIME:20020619T135000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a02898@cern.ch
DESCRIPTION:The first part of meeting will be dedicated to the presentatio
 n of the structural analysis performed by TIS/TE. Then\, progress on displ
 acement of the LHCb equipment in the UX85 area will be reported.\n\nAGENDA
  (see below)\n\nMeeting Room 2889 R-009 (POINT 8)\n\nhttp://indico.cern.ch
 /conferenceDisplay.py?confId=a02898
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a02898
END:VEVENT
BEGIN:VEVENT
SUMMARY:Cutting of the ex-DELPHI Shield RB84 Area - Status
DTSTART;VALUE=DATE-TIME:20020730T220000Z
DTEND;VALUE=DATE-TIME:20020730T220000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021152@cern.ch
DESCRIPTION:The cutting of the ex-DELPHI shield (roughly 30 m3 of heavy co
 ncrete to be removed)in the RB84 area is progressing well as expected. The
  end of this intervention (FORBETON) is scheduled for the end of August 20
 02.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a021152
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021152
END:VEVENT
BEGIN:VEVENT
SUMMARY:Modifications to the ex-DELPHI gas pipes in the PM85 Area
DTSTART;VALUE=DATE-TIME:20020807T070000Z
DTEND;VALUE=DATE-TIME:20020807T075500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021151@cern.ch
DESCRIPTION:The installation of the LHC transfer cryo-line in the PM85 sha
 ft requires to modify the vertical routes of a part (9 gas pipes) of the e
 xisting (ex-DELPHI) gas network. The work is carried out by the LEA-GDS Se
 ction with the technical support of the MTS/Tuyauterie Inovydable/74960 ME
 YTHET. The work is scheduled for the first week of July 2002 over 2 weeks.
  The first part of the work has been performed on 4-5 July. However\, the 
 work has been interrupted for two reasons (no access to this area and PPSP
 S* presented by MTS uncomplete).\n\nREMARK : Updated PPSPS* presented by M
 TS & Joint Inspection - Top of the PM85 shaft (POINT 8) - Building SD 2855
 .\n\n* PPSPS : " Plan Particulier de Sécurité & de Protection de la Sant
 é "\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a021151
LOCATION:CERN 2855-R-001
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021151
END:VEVENT
BEGIN:VEVENT
SUMMARY:Infrastructure - Current Status of the UX85 cavern
DTSTART;VALUE=DATE-TIME:20020828T123000Z
DTEND;VALUE=DATE-TIME:20020828T130000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021362@cern.ch
DESCRIPTION:At the end of August 2002\, an important milestone is reached 
 at Point 8 which is the end of small CE works. Now\, the installation of t
 he temporary platform so-called "quai" will start on the beginning of Sept
 ember 2002. LHCb Expt Area team must leaves the place between RB84 and RB8
 6 free access for starting the installation of the general services in the
  octant 8 to 7. The current status of the infrastructure issues will be re
 ported. The planning is respected (1 week delay).\n\nhttp://indico.cern.ch
 /conferenceDisplay.py?confId=a021362
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021362
END:VEVENT
BEGIN:VEVENT
SUMMARY:Survey - Position Network Marks in the UX85 Area
DTSTART;VALUE=DATE-TIME:20020904T123000Z
DTEND;VALUE=DATE-TIME:20020904T130000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021367@cern.ch
DESCRIPTION:A network of position marks is needed for the installation of 
 the LHCb detectors in the UX85 cavern. We (LHCb Expt Area) have prepared a
 n engineering note in order to specify our first requirements.\n\nhttp://i
 ndico.cern.ch/conferenceDisplay.py?confId=a021367
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021367
END:VEVENT
BEGIN:VEVENT
SUMMARY:Infrastructure - Power Supply in the UX85 Cavern
DTSTART;VALUE=DATE-TIME:20020911T123000Z
DTEND;VALUE=DATE-TIME:20020911T133000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021363@cern.ch
DESCRIPTION:This meeting is devoted to review the electrical power supply 
 issues in the UX85 cavern. The electrical cabinets and switchboards (ex-DE
 LPHI) named  EBD 1/85 and EXD 1/85\, located in the US85 area will be re-u
 sed (LHCb baseline up to now). The topics of this review are the LHCb powe
 r requirements\, the location of the existing EBD & EXD electrical cabinet
 s\, electrical plug boxes on the walls\, cabling and other general service
 s such as power supply of cranes\, pumps\, lighting\, emergengy lighting.\
 n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a021363
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021363
END:VEVENT
BEGIN:VEVENT
SUMMARY:Progress on Current Tasks at Point 8
DTSTART;VALUE=DATE-TIME:20020918T130000Z
DTEND;VALUE=DATE-TIME:20020918T133000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021397@cern.ch
DESCRIPTION:This meeting is devoted to review progress on the current task
 s at Point 8. \n\nMeeting Room 2889 R-009 (POINT 8)\n\nhttp://indico.cern.
 ch/conferenceDisplay.py?confId=a021397
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021397
END:VEVENT
BEGIN:VEVENT
SUMMARY:Re-installation of stair-cases  in the PZ Area
DTSTART;VALUE=DATE-TIME:20020925T130000Z
DTEND;VALUE=DATE-TIME:20020925T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021401@cern.ch
DESCRIPTION:We shall report on progress on the re-installation of the stai
 r-cases in the PZ Area. In addition\, the status of the new metallic struc
 tures and barriers which have been ordered in Spring 2002 will be also rev
 iewed. The schedule will be re-examined. The goal is to end the installati
 on of the metallic structures in the PZ area by the end of October 2002\, 
 in order to avoid any interference with the displacement of the DELPHI Bar
 rel in its final position which is scheduled for November 2002.\n\n\nMeeti
 ng Room 2889 R-009 (POINT 8)\n\nhttp://indico.cern.ch/conferenceDisplay.py
 ?confId=a021401
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021401
END:VEVENT
BEGIN:VEVENT
SUMMARY:Fire Detection  -  Access Control at Point 8
DTSTART;VALUE=DATE-TIME:20021002T130000Z
DTEND;VALUE=DATE-TIME:20021002T144500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021400@cern.ch
DESCRIPTION:The Group ST/MA will make a proposal for the new fire detectio
 n system in the LHCb surface buildings (SX8\, SG8\, SZ8) at Point 8. The s
 econd item on agenda will be a brief status report on Access Control for P
 oint 8.\n\nMeeting Room 2889 R-009 (POINT 8)\n\nhttp://indico.cern.ch/conf
 erenceDisplay.py?confId=a021400
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021400
END:VEVENT
BEGIN:VEVENT
SUMMARY:Radiation Shield in the UX85 Area  -  Modular parts - Chicanes
DTSTART;VALUE=DATE-TIME:20021009T130000Z
DTEND;VALUE=DATE-TIME:20021009T144000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021422@cern.ch
DESCRIPTION:The meeting is dedicated to review the engineering design of t
 he modular parts of the main radiation shield needed in the UX85 cavern (t
 he central & upper parts and the front-door). The segmentation and the ins
 tallation procedures will be reviewed. The chicanes devoted to the Personn
 el access\, services and detector cabling will be also described.\n\nMeeti
 ng Room 2889 R-009 (POINT 8)\n\nhttp://indico.cern.ch/conferenceDisplay.py
 ?confId=a021422
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021422
END:VEVENT
BEGIN:VEVENT
SUMMARY:Gantry  for muon chambers & Existing Platform in RB86 Area
DTSTART;VALUE=DATE-TIME:20021023T130000Z
DTEND;VALUE=DATE-TIME:20021023T141500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021642@cern.ch
DESCRIPTION:The first part of the meeting will be devoted to the progress 
 on the structural analysis of the gantry for the muon chambers. Final mech
 anical calculations performed by TIS will be presented. The possible re-us
 e of the existing platform in the RB86 area\, muon side\, will be also re-
 examined.\n\nMeeting Room 2889 R-009 (POINT 8)\n\nhttp://indico.cern.ch/co
 nferenceDisplay.py?confId=a021642
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021642
END:VEVENT
BEGIN:VEVENT
SUMMARY:Metallic Structures in the PZ Area - Status
DTSTART;VALUE=DATE-TIME:20021106T140000Z
DTEND;VALUE=DATE-TIME:20021106T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021796@cern.ch
DESCRIPTION:The meeting will be dedicated to report on progress on the ins
 tallation of the metallic structures in the PZ Area. The objective is to f
 inish that installation by mid-November 2002\, in order to move the DELPHI
  Barrel by end of November or first week of December as scheduled. \n\nMee
 ting Room 2889 R-009 (POINT 8) as usual.\n\nhttp://indico.cern.ch/conferen
 ceDisplay.py?confId=a021796
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021796
END:VEVENT
BEGIN:VEVENT
SUMMARY:Ventilation System in the UX85 Cavern - Review of the Modification
 s
DTSTART;VALUE=DATE-TIME:20021113T140000Z
DTEND;VALUE=DATE-TIME:20021113T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021664@cern.ch
DESCRIPTION:A review of the modifications to the existing air ventilation 
 system in the UX85 cavern will be presented in order to fix the parameters
  by the end of 2002.\n\nMeeting Room 2889 R-009 (POINT 8) as usual.\n\nhtt
 p://indico.cern.ch/conferenceDisplay.py?confId=a021664
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021664
END:VEVENT
BEGIN:VEVENT
SUMMARY:Re-installation of General Services in the UX85  -  Status
DTSTART;VALUE=DATE-TIME:20021120T140000Z
DTEND;VALUE=DATE-TIME:20021120T170000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021868@cern.ch
DESCRIPTION:Meeting dedicated to review the re-installation of general ser
 vices in the UX85 cavern.\n\nMeeting Room 2889 R-009 (POINT 8 ) as usual.\
 n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a021868
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021868
END:VEVENT
BEGIN:VEVENT
SUMMARY:Displacement of DELPHI Barrel - Status
DTSTART;VALUE=DATE-TIME:20021127T140000Z
DTEND;VALUE=DATE-TIME:20021127T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021869@cern.ch
DESCRIPTION:Meeting dedicated to report on progress on the preparation of 
 the displacement of the DELPHI barrel. Displacement sheduled now for Decem
 ber 10.\n\nMeeting Room 2889 R-009 (POINT 8).\n\nhttp://indico.cern.ch/con
 ferenceDisplay.py?confId=a021869
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021869
END:VEVENT
BEGIN:VEVENT
SUMMARY:Services for the LHCb Magnet - Progress Report
DTSTART;VALUE=DATE-TIME:20021204T140000Z
DTEND;VALUE=DATE-TIME:20021204T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a021998@cern.ch
DESCRIPTION:Meeting dedicated essentially to the progress on the preparati
 on of the services for the LHCb Magnet. In addition\, the installation of 
 the quadrupole Q1 of the inner triplet located behind the LHCb muon detect
 ion system will be discussed with our EST colleagues in charge of this ins
 tallation.\n\nMeeting Room 2889 R-009 (POINT 8) as usual.\n\nhttp://indico
 .cern.ch/conferenceDisplay.py?confId=a021998
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a021998
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Experimental Area - Status Report
DTSTART;VALUE=DATE-TIME:20021218T140000Z
DTEND;VALUE=DATE-TIME:20021218T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a022000@cern.ch
DESCRIPTION:Status Report on 2002 LHCb Experimental Area Activities\n\nMee
 ting Room bdg 2889 R-009 at Point 8 as usual.\n\nhttp://indico.cern.ch/con
 ferenceDisplay.py?confId=a022000
LOCATION:CERN
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a022000
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Magnet - Starting of the Installation
DTSTART;VALUE=DATE-TIME:20030108T140000Z
DTEND;VALUE=DATE-TIME:20030108T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a022148@cern.ch
DESCRIPTION:Meeting dedicated to review the tasks & planning for the insta
 llation of the LHCb magnet. The first yoke elements (6 sheets) have been d
 elivered on December 2002 (from 12/12/02) at Point 8. The delivery of the 
 two coils and the rest of the yoke elements are expected for January 2003.
  Before to start the assembly of the magnet itself the main work is the in
 stallation of the mechanical support in the underground area which is plan
 ned for Jan. - Feb. 2003.\n\nMeeting Room Bdg 2889 R-009 (POINT 8) as usua
 l.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a022148
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a022148
END:VEVENT
BEGIN:VEVENT
SUMMARY:Re-installation of the General Services in the UX85 Area  - Status
DTSTART;VALUE=DATE-TIME:20030115T140000Z
DTEND;VALUE=DATE-TIME:20030115T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a022149@cern.ch
DESCRIPTION:Review of the current tasks and Status of the re-installation 
 of the general services in the PZ Area.\n\nMeeting Room bdg 2889 R-009 (PO
 INT 8) as usual.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a022
 149
LOCATION:CERN
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a022149
END:VEVENT
BEGIN:VEVENT
SUMMARY:Integration of all the services UX85/US85 Areas - Review
DTSTART;VALUE=DATE-TIME:20030122T140000Z
DTEND;VALUE=DATE-TIME:20030122T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a022150@cern.ch
DESCRIPTION:A review of the integration of all the services required by LH
 C crogenics & LHCb Expt Area in the end of the UX85 cavern (UX85/US85) wil
 l be presented.\n\nMeeting Room bdg 2889 R-009 (POINT 8) as usual.\n\nhttp
 ://indico.cern.ch/conferenceDisplay.py?confId=a022150
LOCATION:CERN
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a022150
END:VEVENT
BEGIN:VEVENT
SUMMARY:Radiation Shield -  Manufacturing of the Pre-stressed concrete Bea
 ms
DTSTART;VALUE=DATE-TIME:20030129T140000Z
DTEND;VALUE=DATE-TIME:20030129T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a022151@cern.ch
DESCRIPTION:Review of the tendering documents for the manufacturing of fiv
 e pre-stessed concrete beams required for the upper part of the LHCb radia
 dion shield.\n\nMeeting Room bdg 2889 R-009 (POINT 8) as usual.\n\nhttp://
 indico.cern.ch/conferenceDisplay.py?confId=a022151
LOCATION:CERN
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a022151
END:VEVENT
BEGIN:VEVENT
SUMMARY:General Services in the UX85 cavern - Progress
DTSTART;VALUE=DATE-TIME:20030205T140000Z
DTEND;VALUE=DATE-TIME:20030205T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a03278@cern.ch
DESCRIPTION:Progress report on re-installation of general services in the 
 UX85 cavern +\nSafety Issues in the UX85 cavern (lack of individual protec
 tion)\, corrective actions in order to improve the current situation.\n\nM
 eeting Room 2889 R-009 (Point 8) as usual.\n\nhttp://indico.cern.ch/confer
 enceDisplay.py?confId=a03278
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a03278
END:VEVENT
BEGIN:VEVENT
SUMMARY:UX85 Cavern -  Area dedicated to LHC Cryo-Plant
DTSTART;VALUE=DATE-TIME:20030212T140000Z
DTEND;VALUE=DATE-TIME:20030212T151500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a03363@cern.ch
DESCRIPTION:Preparation of the area dedicated to the LHC Machine cryo-plan
 t in the end of the UX85 cavern (adjacent to the US85 area). LHCb Expt Are
 a commitments & responsibilities (reminder).\n\nMeeting Room 2889 R-009 (P
 oint 8)\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a03363
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a03363
END:VEVENT
BEGIN:VEVENT
SUMMARY:Electrical Power in the UX85 cavern - Progress
DTSTART;VALUE=DATE-TIME:20030219T140000Z
DTEND;VALUE=DATE-TIME:20030219T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a03453@cern.ch
DESCRIPTION:The beginning of the re-installation of electrical power in th
 e UX85 cavern is scheduled for the end of February 2003.\n\n\nMeeting Room
  2889 R-009 (POINT 8) as usual.\n\nhttp://indico.cern.ch/conferenceDisplay
 .py?confId=a03453
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a03453
END:VEVENT
BEGIN:VEVENT
SUMMARY:Experimental Area Issues
DTSTART;VALUE=DATE-TIME:20030305T140000Z
DTEND;VALUE=DATE-TIME:20030305T153000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a03519@cern.ch
DESCRIPTION:2 major items : \n1 - Discussion about access to muon station 
 5 \n2 - Overview of cooling requirements for the sub-detectors\n+ progress
  on other current tasks in the UX85 cavern (metallic structures\, re-insta
 llation of services\, integration of services).\n\nMeeting Room 2889 R-009
  (Point 8) as usual.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=
 a03519
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a03519
END:VEVENT
BEGIN:VEVENT
SUMMARY:General Services in the UX85 - Progress
DTSTART;VALUE=DATE-TIME:20030312T140000Z
DTEND;VALUE=DATE-TIME:20030312T153000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a03575@cern.ch
DESCRIPTION:Current main tasks are the re-installation of the general serv
 ices in the UX85. Progress & Review of tasks for the forthcoming weeks wil
 l be presented.\n\nMeeting Room bdg 2889 R-009 (POINT8) as usual.\n\nhttp:
 //indico.cern.ch/conferenceDisplay.py?confId=a03575
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a03575
END:VEVENT
BEGIN:VEVENT
SUMMARY:Metallic structures in the UX85 Area - Status
DTSTART;VALUE=DATE-TIME:20030319T140000Z
DTEND;VALUE=DATE-TIME:20030319T153000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a03660@cern.ch
DESCRIPTION:Progress on the installation of the metallic structures will b
 e reported.\n\n\nMeeting Room 2889 R-009 at Point 8 as usual.\n\nhttp://in
 dico.cern.ch/conferenceDisplay.py?confId=a03660
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a03660
END:VEVENT
BEGIN:VEVENT
SUMMARY:Work Packages with ST Groups - Status
DTSTART;VALUE=DATE-TIME:20030325T140000Z
DTEND;VALUE=DATE-TIME:20030325T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a03705@cern.ch
DESCRIPTION:Review of the work packages with the ST Groups (CE\, CV\, EL\,
  MA) - Progress -\nDeadline for specification (reminder) is 31st March 200
 3.\n\nMeeting Room 2889 R-009 at POINT 8 as usual.\n\nhttp://indico.cern.c
 h/conferenceDisplay.py?confId=a03705
LOCATION:CERN 2289-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a03705
END:VEVENT
BEGIN:VEVENT
SUMMARY:Experimental Area Issues
DTSTART;VALUE=DATE-TIME:20030409T130000Z
DTEND;VALUE=DATE-TIME:20030409T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a03850@cern.ch
DESCRIPTION:New iteration about electrical drawings (3D model) & integrati
 on in the UX85 cavern + other current electrical works required in the UX8
 5 cavern.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a03850
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a03850
END:VEVENT
BEGIN:VEVENT
SUMMARY:Handling at Point 8  -  Review of Activities
DTSTART;VALUE=DATE-TIME:20030414T123000Z
DTEND;VALUE=DATE-TIME:20030414T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a03932@cern.ch
DESCRIPTION:Handling activities are increasing at Point 8. The use of cran
 es until the end of 2003 requires a thight coordination in order to avoid 
 possible clashes.\n\nMeeting Room 530-R030 (Meyrin site)\n\nhttp://indico.
 cern.ch/conferenceDisplay.py?confId=a03932
LOCATION:CERN 530-R-030
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a03932
END:VEVENT
BEGIN:VEVENT
SUMMARY:RICH 2 support structure
DTSTART;VALUE=DATE-TIME:20030429T120000Z
DTEND;VALUE=DATE-TIME:20030429T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a031119@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=a031119
LOCATION:CERN 2-1-34
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a031119
END:VEVENT
BEGIN:VEVENT
SUMMARY:Current Tasks in the UX85 cavern - Review
DTSTART;VALUE=DATE-TIME:20030430T130000Z
DTEND;VALUE=DATE-TIME:20030430T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a03954@cern.ch
DESCRIPTION:The current tasks in the UX85 Cavern will be reviewed - Status
  & Actions in the forthcoming weeks.\n\n\nMeeting Room 2889 R-009 (POINT 8
 ) as usual.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a03954
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a03954
END:VEVENT
BEGIN:VEVENT
SUMMARY:Experimantal Area  Issues
DTSTART;VALUE=DATE-TIME:20030507T130000Z
DTEND;VALUE=DATE-TIME:20030507T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a031187@cern.ch
DESCRIPTION:The metallic structures for the gas control racks located behi
 nd the pillars in the protected area : installation is planned from 19 May
  2003 until 6 June 2003. The counting rooms (3 levels) will be placed in i
 ts final position by mid-June 2003 as scheduled.\n\nhttp://indico.cern.ch/
 conferenceDisplay.py?confId=a031187
LOCATION:CERN 2889-R-030
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a031187
END:VEVENT
BEGIN:VEVENT
SUMMARY:Services in the UX85 Cavern - Integration
DTSTART;VALUE=DATE-TIME:20030514T130000Z
DTEND;VALUE=DATE-TIME:20030514T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a031268@cern.ch
DESCRIPTION:Integration of general services in the UX85 cavern will be rev
 iewed.\nRe-installation of the electrical services are scheduled\nfor June
 -July 2003. Piping-work planned for September 2003.\n\nMeeting Room 2889 R
 -009 (POINT 8) as usual\n\nhttp://indico.cern.ch/conferenceDisplay.py?conf
 Id=a031268
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a031268
END:VEVENT
BEGIN:VEVENT
SUMMARY:Services in UX85 - Integration - 2nd Iteration
DTSTART;VALUE=DATE-TIME:20030528T120000Z
DTEND;VALUE=DATE-TIME:20030528T130000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a031456@cern.ch
DESCRIPTION:The CAD EUCLID models of the services in the UX85 cavern perfo
 rmed by the ST Groups (ST/CV & ST/EL) and by M.Lloreda (EST/IC) have been 
 improved. Integration of services from the US85 area to the LHC beam is fi
 nished. Additional work is required for completing the integration from th
 e LHC beam up to the protected area. M.Lloreda will give an overview showi
 ng 3D views.\n\nMeeting Room bdg 376-1-016 (Meyrin Site) \n\nPLEASE NOTE U
 NUSUAL TIME & PLACE\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a
 031456
LOCATION:CERN 376-1-016
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a031456
END:VEVENT
BEGIN:VEVENT
SUMMARY:Current Tasks at Point 8 - Status
DTSTART;VALUE=DATE-TIME:20030611T130000Z
DTEND;VALUE=DATE-TIME:20030611T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a031608@cern.ch
DESCRIPTION:The current tasks at Point 8 will be reviewed.\n\nMeeting Room
  bdg 2889 R-009 (Point 8) as usual.\n\nhttp://indico.cern.ch/conferenceDis
 play.py?confId=a031608
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a031608
END:VEVENT
BEGIN:VEVENT
SUMMARY:Experimental Area Issues
DTSTART;VALUE=DATE-TIME:20030626T130000Z
DTEND;VALUE=DATE-TIME:20030626T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a031912@cern.ch
DESCRIPTION:The main topic will be the installation of the QURCb in the US
 85 across the UX85. Impact on the LHCb activities in the UX85 area will be
  reviewed.\n\nMeeting Room 2889 R-009 (Point 8) \n\n*** PLEASE NOTICE UNUS
 UAL DAY (Thursday instead of Wednesday) ***\n\nhttp://indico.cern.ch/confe
 renceDisplay.py?confId=a031912
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a031912
END:VEVENT
BEGIN:VEVENT
SUMMARY:Current Tasks in the UX85 cavern - Follow-up
DTSTART;VALUE=DATE-TIME:20030702T130000Z
DTEND;VALUE=DATE-TIME:20030702T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a031937@cern.ch
DESCRIPTION:Current tasks will be reviewed + List of actions over July-Aug
 ust 2003.\n\n\nMeeting Room 2889 R-009 (Point 8) as usual.\n\nhttp://indic
 o.cern.ch/conferenceDisplay.py?confId=a031937
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a031937
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area Issues - Progress
DTSTART;VALUE=DATE-TIME:20030723T130000Z
DTEND;VALUE=DATE-TIME:20030723T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a031966@cern.ch
DESCRIPTION:Progress on installation of electrical services (PZ Area) will
  be reported.\n\nMEETING ROOM BDG 2889 R-009 (Point 8) as usual.\n\n\n****
    NO MEETING - POSTPONED TO 30 JULY 2003   ****\n\nhttp://indico.cern.ch/
 conferenceDisplay.py?confId=a031966
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a031966
END:VEVENT
BEGIN:VEVENT
SUMMARY:Current tasks in the UX85 - Review
DTSTART;VALUE=DATE-TIME:20030730T130000Z
DTEND;VALUE=DATE-TIME:20030730T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a032284@cern.ch
DESCRIPTION:The re-installation and modifications of the general services 
 from the US85 area to the PZ zone are progressing. The cabling in the PM85
  started in July as roughly scheduled (+ 2-3 weeks). However\, the routes 
 of the cables behind the muon detection system (RB86 area) are not fully d
 efined (inteference with the  envelope of the new mechanical support for t
 he muon chambers). A solution will be proposed in order to avoid the inter
 ferences and fix the position of the trays asap (last iteration).\n\n\nMEE
 TING ROOM BDG 2889 R-009 (Point 8) as usual.\n\nhttp://indico.cern.ch/conf
 erenceDisplay.py?confId=a032284
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a032284
END:VEVENT
BEGIN:VEVENT
SUMMARY:Experimental Area Issues - Follow-up Part 1 (Cancelled)
DTSTART;VALUE=DATE-TIME:20030813T130000Z
DTEND;VALUE=DATE-TIME:20030813T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a032306@cern.ch
DESCRIPTION:C A N C E L L E D\nMeeting postponed to Wed. 20 August\n\nhttp
 ://indico.cern.ch/conferenceDisplay.py?confId=a032306
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a032306
END:VEVENT
BEGIN:VEVENT
SUMMARY:Experimental Area  Issues - Follow-up Part 1
DTSTART;VALUE=DATE-TIME:20030820T130000Z
DTEND;VALUE=DATE-TIME:20030820T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a032307@cern.ch
DESCRIPTION:Meeting essentially dedicated to the re-installation of the ge
 neral electrical services (lighting\, power supply\, AU\,...).\n\nMeeting 
 Point : UX85 cavern RB86 area.\n\nhttp://indico.cern.ch/conferenceDisplay.
 py?confId=a032307
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a032307
END:VEVENT
BEGIN:VEVENT
SUMMARY:Expt Area Issues - Follow-up : Part 2
DTSTART;VALUE=DATE-TIME:20030828T123000Z
DTEND;VALUE=DATE-TIME:20030828T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a035134@cern.ch
DESCRIPTION:For the moment the major item for LHCb infrastructure is the r
 e-installation of the electrical services in the UX85 area (delay = + 4 - 
 6 weeks). Now this activity is re-scheduled for Sep. - Oct. 2003. \n\n\nME
 ETING ROOM 2889 R-009 (POINT 8)\n\n***  PLEASE NOTE UNUSUAL DAY - THURSDAY
  INSTEAD OF WEDNESDAY  ***\n\nhttp://indico.cern.ch/conferenceDisplay.py?c
 onfId=a035134
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a035134
END:VEVENT
BEGIN:VEVENT
SUMMARY:Main Radiation Shield - Status
DTSTART;VALUE=DATE-TIME:20030910T123000Z
DTEND;VALUE=DATE-TIME:20030910T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a035405@cern.ch
DESCRIPTION:Progress on the preparation of the installation of the central
  and upper parts of the main radiadion shield (UX85) will be reported.\n\n
 Meeting Room BDG 2289 R-009 (POINT 8) as usual.\n\nhttp://indico.cern.ch/c
 onferenceDisplay.py?confId=a035405
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a035405
END:VEVENT
BEGIN:VEVENT
SUMMARY:Experimental Area Issues
DTSTART;VALUE=DATE-TIME:20030924T123000Z
DTEND;VALUE=DATE-TIME:20030924T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a035511@cern.ch
DESCRIPTION:Main Topic : General Services - Review & Status\n\nMeeting Roo
 m Bdg 2889 R-009 (Point 8) as usual.\n\nhttp://indico.cern.ch/conferenceDi
 splay.py?confId=a035511
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a035511
END:VEVENT
BEGIN:VEVENT
SUMMARY:Water Cooling Systems - Review & Status
DTSTART;VALUE=DATE-TIME:20031001T123000Z
DTEND;VALUE=DATE-TIME:20031001T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a035588@cern.ch
DESCRIPTION:Main topic : Water Cooling Systems in the UX85 - Review & Stat
 us\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cer
 n.ch/conferenceDisplay.py?confId=a035588
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a035588
END:VEVENT
BEGIN:VEVENT
SUMMARY:Ventilation System in UX85 - Review & Status
DTSTART;VALUE=DATE-TIME:20031008T123000Z
DTEND;VALUE=DATE-TIME:20031008T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a035590@cern.ch
DESCRIPTION:Main topic : Ventilation System in the UX85 cavern - Review & 
 Status\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL>\n\nhttp://indico
 .cern.ch/conferenceDisplay.py?confId=a035590
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a035590
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Current Tasks
DTSTART;VALUE=DATE-TIME:20031015T123000Z
DTEND;VALUE=DATE-TIME:20031015T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a035854@cern.ch
DESCRIPTION:No specific review today - Progress on current tasks will be r
 eviewed.\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) as usual.\n\nhttp://indi
 co.cern.ch/conferenceDisplay.py?confId=a035854
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a035854
END:VEVENT
BEGIN:VEVENT
SUMMARY:Metallic Structures in the UX85 Cavern - Review & Status
DTSTART;VALUE=DATE-TIME:20031022T123000Z
DTEND;VALUE=DATE-TIME:20031022T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a035883@cern.ch
DESCRIPTION:Main topic : Metallic Structures in the UX85 Cavern - Review &
  Status\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indic
 o.cern.ch/conferenceDisplay.py?confId=a035883
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a035883
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Power Distribution -  Status
DTSTART;VALUE=DATE-TIME:20031029T133000Z
DTEND;VALUE=DATE-TIME:20031029T153000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a036023@cern.ch
DESCRIPTION:Main topic : Power distribution (5 MW + 2 MW) in the UX85 cave
 rn - Status.\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://
 indico.cern.ch/conferenceDisplay.py?confId=a036023
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a036023
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Small CE works in the UX85 - Review
DTSTART;VALUE=DATE-TIME:20031105T133000Z
DTEND;VALUE=DATE-TIME:20031105T153000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a036187@cern.ch
DESCRIPTION:Main topic : Small Civil Engineering (CE) works scheduled for 
 2004 such as extension of grooves in the ground of the UX85 cavern for the
  rails dedicated to the muon system and calorimeters - Review .\n\nMEETING
  ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferen
 ceDisplay.py?confId=a036187
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a036187
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Current Tasks in the UX85 cavern
DTSTART;VALUE=DATE-TIME:20031119T133000Z
DTEND;VALUE=DATE-TIME:20031119T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a036337@cern.ch
DESCRIPTION:Main topic : Fire Detection in the UX85 Cavern - Review (topic
  postponed to December 2003). Current Tasks in the UX85 Cavern will be rev
 iewed.\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico
 .cern.ch/conferenceDisplay.py?confId=a036337
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a036337
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Ventilation System & Fire Detection - Status
DTSTART;VALUE=DATE-TIME:20031204T133000Z
DTEND;VALUE=DATE-TIME:20031204T153000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a036490@cern.ch
DESCRIPTION:Main topics : Ventilation System & Fire Detection System in th
 e UX85 cavern - Review \n\nMEETING ROOM 2889 R-009 (POINT 8)\n\n***   PLEA
 SE NOTE UNUSUAL DAY THURSDAY INSTEAD OF WEDNESDAY   ***\n\nhttp://indico.c
 ern.ch/conferenceDisplay.py?confId=a036490
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a036490
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - 2003 Status Report
DTSTART;VALUE=DATE-TIME:20031210T133000Z
DTEND;VALUE=DATE-TIME:20031210T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a036608@cern.ch
DESCRIPTION:Last LHCb Expt Area Meeting for 2003 - Main topic : 2003 Statu
 s Report on the LHCb Expt Area Activities.\n\nMEETING ROOM 2889 R-009 (POI
 NT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a0366
 08
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a036608
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Services for the LHCb Magnet - Status
DTSTART;VALUE=DATE-TIME:20040107T133000Z
DTEND;VALUE=DATE-TIME:20040107T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a0491@cern.ch
DESCRIPTION:Main topic : Services for the LHCb Magnet - Status\n\n\nMEETIN
 G ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/confere
 nceDisplay.py?confId=a0491
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a0491
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Power Distribution (2MW) - Status
DTSTART;VALUE=DATE-TIME:20040114T133000Z
DTEND;VALUE=DATE-TIME:20040114T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a04173@cern.ch
DESCRIPTION:Main topic : The power distribution (2 MW) in the UX85 dedicat
 ed to the LHCb detectors & electronics will be reviewed. The ex-DELPHI equ
 ipment and devices (transformer and EXD cabinets) located in the US85 area
  are foreseen to be re-used. The replacement of the existing transformer (
 1.25 MVA) by a 2.0 MVA transformer\, location of the power station and cab
 ling will be also reviewed (last iteration).\n\nMEETING ROOM BDG 2889 R-00
 9 (POINT 8) AS USUAL\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=
 a04173
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a04173
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Detector Cabling Requirements - Review
DTSTART;VALUE=DATE-TIME:20040121T133000Z
DTEND;VALUE=DATE-TIME:20040121T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a04212@cern.ch
DESCRIPTION:Main topic : the detector cabling requirements will be reviewe
 d in order to prepare the installation of the cable trays from the proximi
 ty of the detectors up to the rooms where electronics will be placed in th
 e protected area.\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nht
 tp://indico.cern.ch/conferenceDisplay.py?confId=a04212
LOCATION:CERN
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a04212
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Installation of Q1 inner triplet RB86 area -  Sta
 tus
DTSTART;VALUE=DATE-TIME:20040129T133000Z
DTEND;VALUE=DATE-TIME:20040129T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a04320@cern.ch
DESCRIPTION:1st Item : the procedure for the installation of the 1st quadr
 upole (Q1) of the inner triplet located in the RB86 area behind the LHCb m
 uon system will be reviewed.\n2nd Item : Current tasks in the UX85 will be
  also reported.\n\nMEETING ROOM BDG 2889 R-009 (POINT 8).\n\n***  PLEASE N
 OTE UNUSUAL DAY THURSDAY INSTEAD OF WEDNESDAY  ***\n\nhttp://indico.cern.c
 h/conferenceDisplay.py?confId=a04320
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a04320
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Gas Distribution - Status
DTSTART;VALUE=DATE-TIME:20040204T133000Z
DTEND;VALUE=DATE-TIME:20040204T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a04525@cern.ch
DESCRIPTION:1st item : Gas Distribution from surface to underground UX85 c
 avern - Status\n2nd item : Metallic structure around the counting rooms (2
 nd floor).\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://in
 dico.cern.ch/conferenceDisplay.py?confId=a04525
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a04525
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Metallic Structures - Status
DTSTART;VALUE=DATE-TIME:20040211T133000Z
DTEND;VALUE=DATE-TIME:20040211T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a04596@cern.ch
DESCRIPTION:Meeting will be focused on the additional metallic structure a
 round the counting rooms and the segment required between LHCb magnet and 
 the cryogenics.\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp
 ://indico.cern.ch/conferenceDisplay.py?confId=a04596
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a04596
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Radiation Shield - Upper part - Status
DTSTART;VALUE=DATE-TIME:20040303T133000Z
DTEND;VALUE=DATE-TIME:20040303T170000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a04662@cern.ch
DESCRIPTION:This meeting will be to focus on the preparation of the constr
 uction and installation of the upper part of the main radiation shield. Th
 e special concrete beams for the central part will be delivered by the end
  of March 2004. The upper part is scheduled for December 2004.\n\nMEETING 
 ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenc
 eDisplay.py?confId=a04662
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a04662
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Grounding Scheme in UX85 Cavern
DTSTART;VALUE=DATE-TIME:20040310T133000Z
DTEND;VALUE=DATE-TIME:20040310T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a041025@cern.ch
DESCRIPTION:Main topic : Grounding scheme in the UX85 cavern.\n\nMEETING R
 OOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conference
 Display.py?confId=a041025
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a041025
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area  - Refurbishment Counting Rooms
DTSTART;VALUE=DATE-TIME:20040317T133000Z
DTEND;VALUE=DATE-TIME:20040317T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a041207@cern.ch
DESCRIPTION:Main topic : refurbishment of the counting rooms - Programme -
  Status\n+ latest news about improvements on the scenario for the installa
 tion of the upper part of the radiation shield.\n\nMEETING ROOM BDG 2889 R
 -009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?con
 fId=a041207
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a041207
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Current Tasks - Review
DTSTART;VALUE=DATE-TIME:20040331T123000Z
DTEND;VALUE=DATE-TIME:20040331T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a041408@cern.ch
DESCRIPTION:Main topic : Current tasks will be reviewed.\n\nMEETING ROOM B
 DG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDispl
 ay.py?confId=a041408
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a041408
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Current tasks - Progress
DTSTART;VALUE=DATE-TIME:20040421T123000Z
DTEND;VALUE=DATE-TIME:20040421T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a041676@cern.ch
DESCRIPTION:Main topic : Progress on the current tasks will be presented.\
 n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.c
 h/conferenceDisplay.py?confId=a041676
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a041676
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Support for Q1 & Compensator in RB86 Area
DTSTART;VALUE=DATE-TIME:20040428T123000Z
DTEND;VALUE=DATE-TIME:20040428T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a041772@cern.ch
DESCRIPTION:Main topics \; \n1 - Support for the Q1 quadrupole & compensat
 or magnet in the RB86 area - Design\n2 - Radiation plugs RB84 & RB86 sides
  - Status\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL\n\nhttp://indi
 co.cern.ch/conferenceDisplay.py?confId=a041772
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a041772
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area  -  Tasks over May 2004 - Review
DTSTART;VALUE=DATE-TIME:20040505T123000Z
DTEND;VALUE=DATE-TIME:20040505T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a041884@cern.ch
DESCRIPTION:A lot of infrasttructure works are scheduled for May 2004 just
  after the end of the assembly of the upper part of the yoke (week no 19) 
 and before starting the assembly of the mu-filters in the UX85 area (week 
 no 23). A detailed review will be presented in order to improve coordinati
 on if necessary.\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhtt
 p://indico.cern.ch/conferenceDisplay.py?confId=a041884
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a041884
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Cooling Systems - Status
DTSTART;VALUE=DATE-TIME:20040512T123000Z
DTEND;VALUE=DATE-TIME:20040512T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a041889@cern.ch
DESCRIPTION:The refurbishment of the air conditioning for the control room
 s & the cooling systems for LHCb sub-detectors & electronics will be revie
 wed by TS/CV.\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp:/
 /indico.cern.ch/conferenceDisplay.py?confId=a041889
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a041889
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Current Tasks - Status
DTSTART;VALUE=DATE-TIME:20040602T123000Z
DTEND;VALUE=DATE-TIME:20040602T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a042215@cern.ch
DESCRIPTION:Main topics : A lot of infrastructure works were scheduled ove
 r May-June just before the installation of the chariots for starting the a
 ssembly of the mu-filters and before the moving of the LHCb dipole magnet 
 in its final position. Progress on items will be reported.\n\nMEETING ROOM
  BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDis
 play.py?confId=a042215
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a042215
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Installation of Radiation Shield - Central Part
DTSTART;VALUE=DATE-TIME:20040609T123000Z
DTEND;VALUE=DATE-TIME:20040609T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a042418@cern.ch
DESCRIPTION:Main topics of the LHCb Expt Area Meeting (no 16/2004)are summ
 arized as follows : \n1) After a long preparation\, the installation of th
 e central part of the main radiation shield (5 concrete beams\; total weig
 ht = 150 t)is now re-scheduled for 9\,10 & 11 June 2004.\n2) Detector Serv
 ices through the radiation shield : a new iteration on the allocation of s
 pace is necessary. \n\nMEETING ROON BDG 2889 R-009 (POINT 8) AS USUAL.\n\n
 http://indico.cern.ch/conferenceDisplay.py?confId=a042418
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a042418
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Gas Distribution System - Status
DTSTART;VALUE=DATE-TIME:20040616T123000Z
DTEND;VALUE=DATE-TIME:20040616T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a042610@cern.ch
DESCRIPTION:Main topic : Gas Distribution System from the SG8 building at 
 surface up to the gas control racks located in the protected area of the U
 X85 cavern will be reviewed. Engineering drawings (EUCLID) performed by P.
 A Préau will be presented. Piping work is scheduled for September 2004.\n
 \nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch
 /conferenceDisplay.py?confId=a042610
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a042610
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Infrastructure Issues - Current Tasks
DTSTART;VALUE=DATE-TIME:20040623T123000Z
DTEND;VALUE=DATE-TIME:20040623T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a042787@cern.ch
DESCRIPTION:Infrastructure Issues - Current Tasks will be reviewed.\n\n\nM
 EETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/co
 nferenceDisplay.py?confId=a042787
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a042787
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Safety in the UX85 Cavern - REMINDER
DTSTART;VALUE=DATE-TIME:20040630T123000Z
DTEND;VALUE=DATE-TIME:20040630T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a042943@cern.ch
DESCRIPTION:Main topic : Safety in the UX85 Cavern - REMINDER.\nApplicatio
 ns of safety rules and procedures are mandatory.\nThis meeting will be ded
 icated to the SAFETY. \nDocuments and procedures will be reminded (P.G.C.S
 .P.S\, VIC\, PPSPS\, AOC\, ....). \n \nMEETING ROOM 2889 R-009 (POINT 8) A
 S USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a042943
LOCATION:CERN
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a042943
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA  - Current Tasks - Progress
DTSTART;VALUE=DATE-TIME:20040714T123000Z
DTEND;VALUE=DATE-TIME:20040714T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a043451@cern.ch
DESCRIPTION:The progress on the current tasks will be reported.\n\nMEETING
  ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\n                       C A N C
  E L L E D\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a043451
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a043451
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Radioprotection at Point 8 - Status
DTSTART;VALUE=DATE-TIME:20040721T123000Z
DTEND;VALUE=DATE-TIME:20040721T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a043100@cern.ch
DESCRIPTION:Main topic : In the framework of RAMES project \, the radiopro
 tection issues at Point 8 will be reviewed.\n\nMEETING ROOM BDG 2889 R-009
  (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=
 a043100
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a043100
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Expt Area - Infrastructure Issues - Progress
DTSTART;VALUE=DATE-TIME:20040728T123000Z
DTEND;VALUE=DATE-TIME:20040728T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a043381@cern.ch
DESCRIPTION:Main topic : After the dismantling of the 1/2 \\"quay\\" RB86 
 side (beginning of July 04) the sequence of the tasks in that region has b
 een revisited.\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp:
 //indico.cern.ch/conferenceDisplay.py?confId=a043381
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a043381
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA no 22/2004 - Rails for Calorimeters
DTSTART;VALUE=DATE-TIME:20040804T123000Z
DTEND;VALUE=DATE-TIME:20040804T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a043432@cern.ch
DESCRIPTION:Main topic : preparation of the rails dedicated to the calorim
 eters (recovery\, quality control\, machining\, re-installtion\, survey).\
 n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.c
 h/conferenceDisplay.py?confId=a043432
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a043432
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA no 23/2004 - Current Tasks - Progress
DTSTART;VALUE=DATE-TIME:20040811T123000Z
DTEND;VALUE=DATE-TIME:20040811T123000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a043452@cern.ch
DESCRIPTION:The progress on the current tasks will be reported.\n\nMEETING
  ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferen
 ceDisplay.py?confId=a043452
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a043452
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA no 24/2004 - Assembly of muon filters
DTSTART;VALUE=DATE-TIME:20040818T123000Z
DTEND;VALUE=DATE-TIME:20040818T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a043617@cern.ch
DESCRIPTION:Main topic : The LHCb magnet is now in its final position (fro
 m 12 Aug.) . The grooves for calorimeters (very dusty and noisy works) are
  almost finished (end expected for 20 Aug.). The assembly of the muon is s
 tarting. A review will be presented and co-activities in the UX85 cavern w
 ill be re-examined.\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\n
 http://indico.cern.ch/conferenceDisplay.py?confId=a043617
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a043617
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA no 25/2004 - Fence Cryogenics/LHCb Detector
DTSTART;VALUE=DATE-TIME:20040825T123000Z
DTEND;VALUE=DATE-TIME:20040825T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a043662@cern.ch
DESCRIPTION:Main topic : the engineering design (latest version) of the fe
 nce between the LHC cryogenics and the LHCb detectors in the end of the UX
 85 cavern will be presented. Access\, emergency exits\, doors with interlo
 cks will be reviewed.\n\nMEETING ROOM BDG 2889 R-009 (POINT8) AS USUAL.\n\
 nhttp://indico.cern.ch/conferenceDisplay.py?confId=a043662
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a043662
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 26/2004 - Current Tasks - Review
DTSTART;VALUE=DATE-TIME:20040901T123000Z
DTEND;VALUE=DATE-TIME:20040901T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a043768@cern.ch
DESCRIPTION:Main topic : Progress on the current tasks will be reviewed.\n
 \nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch
 /conferenceDisplay.py?confId=a043768
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a043768
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 27/2004 - Metallic Structure / Magnet - Integration
DTSTART;VALUE=DATE-TIME:20040908T123000Z
DTEND;VALUE=DATE-TIME:20040908T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a043789@cern.ch
DESCRIPTION:Main topic : Scenario (update) for the installation of RICH1 (
 + space constraints at RB84 area) will be presented. Impact on the design 
 of the metallic structure on left side of LHCb dipole will be revisited.\n
 \n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.
 ch/conferenceDisplay.py?confId=a043789
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a043789
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 28/2004 - Rails for Calorimeters - Progress
DTSTART;VALUE=DATE-TIME:20040915T123000Z
DTEND;VALUE=DATE-TIME:20040915T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a043790@cern.ch
DESCRIPTION:Main topics : Rails for calorimeters - Recovery of ex-DELPHI r
 ails + installation procedure will be reviewed - Installation is scheduled
  for Oct.04. \nfollowing topic : Modifications to the metallic structure a
 round the counting rooms  has been postponed to Wed. 29 Sept. 2004.\n\nMEE
 TING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conf
 erenceDisplay.py?confId=a043790
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a043790
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 29/2004 - Manufacturing & Installation of bunker - Status
DTSTART;VALUE=DATE-TIME:20040922T123000Z
DTEND;VALUE=DATE-TIME:20040922T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a044051@cern.ch
DESCRIPTION:Main topic : the manufacturing and the installation of the \\"
  bunker \\" which is the concrete structure below RICH2 and Trackers will 
 be presented. The installtion in the UX85 is scheduled for mid-October 04.
 \n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.
 ch/conferenceDisplay.py?confId=a044051
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a044051
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 30/2004 - Metallic structures around counting rooms - Stat
 us
DTSTART;VALUE=DATE-TIME:20040929T123000Z
DTEND;VALUE=DATE-TIME:20040929T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a044052@cern.ch
DESCRIPTION:Main topic : modifications to the metallic structures around t
 he counting rooms will be revisited. Goals = realisation scheduled for Nov
 . 04.\n\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indic
 o.cern.ch/conferenceDisplay.py?confId=a044052
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a044052
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 31/2004 - Modifications RB86 Area - Status
DTSTART;VALUE=DATE-TIME:20041006T123000Z
DTEND;VALUE=DATE-TIME:20041006T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a044293@cern.ch
DESCRIPTION:Main topics : \n- Dismantling of the mobile platform (ex-DELPH
 I)\n- Cutting of concrete for installation of MF4.\n- Safety documents (AO
 C\,PPSPS\,VIC) - Reminder\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUA
 L.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a044293
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a044293
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 32/2004 - Installation Bunker - Status
DTSTART;VALUE=DATE-TIME:20041013T130000Z
DTEND;VALUE=DATE-TIME:20041013T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a044323@cern.ch
DESCRIPTION:Main topics : \n1 - Installation of the bunker\, concrete stru
 cture for RICH2 & trackers - Status\n2 - Recovery of rails for mu-filters 
 & calorimeters - End\n3 - Metrology of rails\n4 - Re-installation of rails
  - Preparation\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp:
 //indico.cern.ch/conferenceDisplay.py?confId=a044323
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a044323
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 33/2004 - Current tasks - Review
DTSTART;VALUE=DATE-TIME:20041020T123000Z
DTEND;VALUE=DATE-TIME:20041020T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a044564@cern.ch
DESCRIPTION:Main topics : Progress on the current tasks will be reported.\
 n\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern
 .ch/conferenceDisplay.py?confId=a044564
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a044564
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 34/2004 - Integration of Detector Services - Review
DTSTART;VALUE=DATE-TIME:20041027T123000Z
DTEND;VALUE=DATE-TIME:20041027T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a044692@cern.ch
DESCRIPTION:Main topic : integration od the detector services (cooling pip
 es\, cable trays\, modifications to the metallic structure around the coun
 ting rooms) will be revisited.\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS
  USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a044692
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a044692
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 35/2004 - Rails for Muon-Filters & Calorimeters - Status
DTSTART;VALUE=DATE-TIME:20041103T133000Z
DTEND;VALUE=DATE-TIME:20041103T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a044751@cern.ch
DESCRIPTION:Main topic : Modifications to the RB86 area are expected to be
  finished by 12th November. In the frame of the infrastructure issues\, th
 e re-installation of the rails for both muon filters & calorimeters has th
 e highest priority\, in order to have rails in place before the X-mas brea
 kdown.\n\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indi
 co.cern.ch/conferenceDisplay.py?confId=a044751
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a044751
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 36/2004 - Current Tasks + Safety Issues
DTSTART;VALUE=DATE-TIME:20041110T133000Z
DTEND;VALUE=DATE-TIME:20041110T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a044979@cern.ch
DESCRIPTION:Main topics : \n1 - Progress on current tasks in the UX85 cave
 rn will be reported.\n2 - Safety Issues (circulation & emergency exits\, w
 ater hoses\, fire detection) will be revisited.\n\nMEETING ROOM BDG 2889 R
 -009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?con
 fId=a044979
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a044979
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 37/2004 - Current Activities - Status
DTSTART;VALUE=DATE-TIME:20041117T133000Z
DTEND;VALUE=DATE-TIME:20041117T170000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a045172@cern.ch
DESCRIPTION:Main topics : \n1 - LHCb Magnet Commissioning - Impact on cryo
 genic area.\n2 - Metrology of rails for calos (end) & reception chariots\n
 3 - Safety Issues - Scaffodings\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) A
 S USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a045172
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a045172
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 38/2004 - Rails for Calorimeters - Installation
DTSTART;VALUE=DATE-TIME:20041124T133000Z
DTEND;VALUE=DATE-TIME:20041124T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a045315@cern.ch
DESCRIPTION:Main topic : Installation of the rails\nThe main infrastructur
 e work in the UX85 before the X-mas shuntdown\, is the re-installation of 
 the rails for both calorimeters and mu-filters (roughly 132 m). The work o
 n site is scheduled for starting week 48 until week 51.\n\nMEETING ROOM BD
 G 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDispla
 y.py?confId=a045315
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a045315
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 39/2004 - Infrastructure Issues - 2004 Status Report
DTSTART;VALUE=DATE-TIME:20041208T133000Z
DTEND;VALUE=DATE-TIME:20041208T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a045609@cern.ch
DESCRIPTION:Main topics : \n- Progress on the current works such as rails 
 for calorimeters.\n- Summary of the main achievements over 2004\n- Plans f
 or Q1&Q2\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indi
 co.cern.ch/conferenceDisplay.py?confId=a045609
LOCATION:CERN 2889-R-008
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a045609
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 39/2004 - Infrastructure Issues - 2004 Status Report
DTSTART;VALUE=DATE-TIME:20041208T133000Z
DTEND;VALUE=DATE-TIME:20041208T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a045612@cern.ch
DESCRIPTION:Main topics :\n- Progress on current activities\n- Summary of 
 the main achievements over 2004\n- Plans for Q1 & Q2\n\nMEETING ROOM BDG 2
 889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.p
 y?confId=a045612
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a045612
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 01/2005 - Current activities - Follow-Up
DTSTART;VALUE=DATE-TIME:20050112T133000Z
DTEND;VALUE=DATE-TIME:20050112T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a05118@cern.ch
DESCRIPTION:Main topic : In order to re-start all the scheduled activities
 \, the current tasks will be reviewed. Progress and schedule will be revis
 ited.\n\nMEETING ROOM BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.
 cern.ch/conferenceDisplay.py?confId=a05118
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a05118
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 02/2005 - Metallic structures - Status
DTSTART;VALUE=DATE-TIME:20050119T133000Z
DTEND;VALUE=DATE-TIME:20050119T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a05563@cern.ch
DESCRIPTION:Main items :\n1 - Metallic structures in preparation will be r
 eviewed :\n    - New platforms for TDMs (Zone A)\n    - Structure around c
 ounting rooms (Zone A)\n    - Platform for installation VX & RICH1 - Suppo
 rt\n    - Support for cable trays.\n2 - LHC Machine Issues in the UX85 - f
 orthcoming works\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp:
 //indico.cern.ch/conferenceDisplay.py?confId=a05563
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a05563
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 03/2005 - ECAL Worksite - Follow-up
DTSTART;VALUE=DATE-TIME:20050126T133000Z
DTEND;VALUE=DATE-TIME:20050126T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a05733@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=a05733
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a05733
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 04/2005 - Tasks & Work Packages -  Analyses
DTSTART;VALUE=DATE-TIME:20050202T133000Z
DTEND;VALUE=DATE-TIME:20050202T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a05887@cern.ch
DESCRIPTION:Current Tasks & Work Packages will be reviewed.\n\nMEETING ROO
 M BDG 2889 R-009 (POINT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDi
 splay.py?confId=a05887
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a05887
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 05/2005 - Current Activities - Progress & Plans
DTSTART;VALUE=DATE-TIME:20050209T133000Z
DTEND;VALUE=DATE-TIME:20050209T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a051055@cern.ch
DESCRIPTION:Main topic : the current activities will be reviewed. Progress
  and Plans for the forthcoming weeks will be reported.\n\nMEETING ROOM BDG
  2889 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.p
 y?confId=a051055
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a051055
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 06/2005 - Radiation Shielding Plugs - Current Status
DTSTART;VALUE=DATE-TIME:20050216T133000Z
DTEND;VALUE=DATE-TIME:20050216T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a051166@cern.ch
DESCRIPTION:Main topic : Current status of the radiation shielding plugs b
 oth sides (RB84 & RB86 areas) of the LHCb Experiment will be reported. The
  work package (WP) for installation of the plugs with AB/ATB-EA Group will
  be examinated.\n\nMEETING ROOM BDG 2889 R-009 (Pit 8) AS USUAL.\n\nhttp:/
 /indico.cern.ch/conferenceDisplay.py?confId=a051166
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a051166
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 07/2005 - Access Control System - Status
DTSTART;VALUE=DATE-TIME:20050223T133000Z
DTEND;VALUE=DATE-TIME:20050223T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a051236@cern.ch
DESCRIPTION:Main topic : the access control system at Point 8 will be revi
 ewed.\n\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.
 cern.ch/conferenceDisplay.py?confId=a051236
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a051236
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 08/2005 - Power Station (2x1.25 MVA) in PZ Area - Progress
DTSTART;VALUE=DATE-TIME:20050302T133000Z
DTEND;VALUE=DATE-TIME:20050302T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a051376@cern.ch
DESCRIPTION:Main topic : the installation of the elactrical power station 
 (2 x 1.25 MVA) in the PZ area is progressing. Sequence of tasks and schedu
 le will be reported by TS/EL.\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS US
 UAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a051376
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a051376
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 09/2005 - Detector Services - Integration
DTSTART;VALUE=DATE-TIME:20050309T133000Z
DTEND;VALUE=DATE-TIME:20050309T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a051565@cern.ch
DESCRIPTION:Main topic : Detector Services in the UX85 cavern - Status of 
 integration - The CAD mockups (EUCLID) will be presented (visualization on
  screen).\n\nMEETING ROOM BDG 376 1-016 (Meyrin Site) - UNUSAL PLACE\n\nPL
 EASE NOTICE THE UNUSAL PLACE !!!!!\n\nhttp://indico.cern.ch/conferenceDisp
 lay.py?confId=a051565
LOCATION:CERN 376-1-016
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a051565
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 10/2005 - Current Activivies - Status & Plans
DTSTART;VALUE=DATE-TIME:20050316T133000Z
DTEND;VALUE=DATE-TIME:20050316T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a051761@cern.ch
DESCRIPTION:Preliminary agenda : the current activities will be reviewed -
  Status & plans will be reported.\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) A
 S USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a051761
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a051761
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 11/2005 - Metallic Structures Behind Muon System RB86 area
DTSTART;VALUE=DATE-TIME:20050323T133000Z
DTEND;VALUE=DATE-TIME:20050323T170000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a051881@cern.ch
DESCRIPTION:Main topic :\nThe modifications to the metallic structure behi
 nd the muon detection sysrem (RB86 area) will be reviewed.\n\nMEETING ROOM
  BDG 2889 R-009 (pit 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDispl
 ay.py?confId=a051881
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a051881
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 12/2005 - Installation Power Station - Progress
DTSTART;VALUE=DATE-TIME:20050406T123000Z
DTEND;VALUE=DATE-TIME:20050406T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a051882@cern.ch
DESCRIPTION:Main topic : follow-up of the installation of the electrical p
 ower station (2x 1.25 MVA).\n\nMEETING ROOM BDG 2889 R-009 (Pit 8) AS USUA
 L.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a051882
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a051882
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 13/2005 - Current Activities - Follow-up
DTSTART;VALUE=DATE-TIME:20050413T123000Z
DTEND;VALUE=DATE-TIME:20050413T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a052288@cern.ch
DESCRIPTION:Main topic : The displacement of various cables (*) between LH
 Cb magnet and the cavern wall (RB84) has been scheduled for week 16 (over 
 1 week) before the installation of the RICH1 shielding.\n\n(*) electrical 
 distribution & remote monitoring cables for the pumps located at the lowes
 t point of the LHC tunnel towards the point 7.\n\nMEETING ROOM BDG 2889 R-
 009 (PIT 8) AS USUAL\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=
 a052288
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a052288
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 14/2005 - Cooling Systems - Work Packages Analyses
DTSTART;VALUE=DATE-TIME:20050420T123000Z
DTEND;VALUE=DATE-TIME:20050420T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a052425@cern.ch
DESCRIPTION:Main topics :\n- Detector Cooling systems- Work Package Analys
 es(WPA)\n- Survey : Installation of the Gantry\n- Safety : Access Control 
 System - Material sas (?)\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL.
 \n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a052425
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a052425
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 15/2005 - Electrical Distribution 2 x 1.25 MVA - Progress
DTSTART;VALUE=DATE-TIME:20050427T143000Z
DTEND;VALUE=DATE-TIME:20050427T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a052608@cern.ch
DESCRIPTION:Main topics : \n1 - Progress on installation of the electrical
  distribution 2 x 1.25 MVA.\n2 - Installation of RICH1 Shield - Status\n3 
 - Assembly of MF4 - Status\n4 - Survey - ECAL & HCAL measurements\n\nMEETI
 NG ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferen
 ceDisplay.py?confId=a052608
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a052608
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 16/2005 - Gantry - Metallic structures border CRYO/LHCb
DTSTART;VALUE=DATE-TIME:20050504T123000Z
DTEND;VALUE=DATE-TIME:20050504T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a052769@cern.ch
DESCRIPTION:Main topics :\n1 - Installation of the gantry - Review\n2 - Me
 tallic structures at the border CRYO/LHCb - Status\n\nMEETING ROOM BDG 288
 9 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?co
 nfId=a052769
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a052769
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 17/2005 - Current Tasks - Progress
DTSTART;VALUE=DATE-TIME:20050511T123000Z
DTEND;VALUE=DATE-TIME:20050511T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a052928@cern.ch
DESCRIPTION:Main topics :\n1 - Electrical Distribution (2 x 1.25 MVA) - Pr
 ogress\n2 - Installation of RICH1 shielding - Status\n3 - Other current ta
 sks - Status\n\nMEETING ROOM BDG 2889 R-009 (PIT8) AS USUAL.\n\nhttp://ind
 ico.cern.ch/conferenceDisplay.py?confId=a052928
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a052928
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 18/2005 - Structure behind muon system - Status
DTSTART;VALUE=DATE-TIME:20050518T123000Z
DTEND;VALUE=DATE-TIME:20050518T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a053054@cern.ch
DESCRIPTION:Main topics :\n- Metallic structure behind muon system (RB86) 
 - Progress\n- Survey Issues\n- Current tasks\n\nMEETING ROOM BDG 2889 R-00
 9 (PIT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a
 053054
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a053054
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 19/2005 - Infrastructure Issues - Follow-up
DTSTART;VALUE=DATE-TIME:20050525T123000Z
DTEND;VALUE=DATE-TIME:20050525T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a053278@cern.ch
DESCRIPTION:Main topics :\n- Current activities - Progress\n- Radiation Pl
 ug (concrete) - RB84 Side\n- Survey - Follow-up\n- Safety issues\n\nMEETIN
 G ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenc
 eDisplay.py?confId=a053278
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a053278
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 20/2005 - Electrical Distribution (2 x 1.25 MVA) - Follow-
 up
DTSTART;VALUE=DATE-TIME:20050601T123000Z
DTEND;VALUE=DATE-TIME:20050601T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a053411@cern.ch
DESCRIPTION:Main topics :\n- Electrical Distribution 2 x 1.25 MVA - Progre
 ss\n- Other current activities - Status\n\nMEETING ROOM BDG 2889 R-009 (PI
 T 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a05341
 1
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a053411
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 21/2005 - Task & Work Package Analyses
DTSTART;VALUE=DATE-TIME:20050615T123000Z
DTEND;VALUE=DATE-TIME:20050615T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a053835@cern.ch
DESCRIPTION:Main topics :\n1 - Displacement of the mu-filters (MF1\, MF2 &
  MF3)\n2 - Installation of the TDMs \n3 - Cooling systems \n\nMEETING ROOM
  BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDispl
 ay.py?confId=a053835
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a053835
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 22/2005 - Task & Work Package Analyses
DTSTART;VALUE=DATE-TIME:20050622T123000Z
DTEND;VALUE=DATE-TIME:20050622T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a053961@cern.ch
DESCRIPTION:Main topics :\n1 - Cooling Systems\n2 - Crane PR768 (3.2 t) - 
 safety issues\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://i
 ndico.cern.ch/conferenceDisplay.py?confId=a053961
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a053961
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 23/2005 - Forthcoming Tasks - Preparation
DTSTART;VALUE=DATE-TIME:20050629T123000Z
DTEND;VALUE=DATE-TIME:20050629T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a054243@cern.ch
DESCRIPTION:Main topics :\n1 - Preparation of the grooves for cabling from
  the bunker to control rooms.\n2 - Water cooling pipes (RB86 area)\n3 - Tr
 ansport of the RICH2 - Preparation\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) 
 AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a054243
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a054243
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 24/2005 - Metallic structures - Progress
DTSTART;VALUE=DATE-TIME:20050706T123000Z
DTEND;VALUE=DATE-TIME:20050706T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a054348@cern.ch
DESCRIPTION:Main topic :\n1 - Metallic structure behind muon system (right
  & left side)\n2 - Support for cable trays behind control rooms\n3 - Aroun
 d IP8 & magnet.\n\nMEETING ROOM BDG 2889 R-009 (PIT8) AS USUSAL.\n\nhttp:/
 /indico.cern.ch/conferenceDisplay.py?confId=a054348
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a054348
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 25/2005 - Gas system work package analysis
DTSTART;VALUE=DATE-TIME:20050713T123000Z
DTEND;VALUE=DATE-TIME:20050713T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a054349@cern.ch
DESCRIPTION:Main topic :\n- Grooves for cabling from bunker to rooms\n- Ga
 s system work package analysis.\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS 
 USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a054349
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a054349
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 26/2005 - Current Activities - Status
DTSTART;VALUE=DATE-TIME:20050720T123000Z
DTEND;VALUE=DATE-TIME:20050720T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a054351@cern.ch
DESCRIPTION:Main topic \;\n- Current infrastructure activities - Brief sta
 tus report.\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://ind
 ico.cern.ch/conferenceDisplay.py?confId=a054351
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a054351
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 27/2005 - Grooves for cabling - Progress
DTSTART;VALUE=DATE-TIME:20050727T123000Z
DTEND;VALUE=DATE-TIME:20050727T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a054738@cern.ch
DESCRIPTION:Main topic :\n- grooves in the UX85 (below bunker) - Progress\
 n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.cern.ch/
 conferenceDisplay.py?confId=a054738
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a054738
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 28/2005 - Metallic structures - Status  - CANCELLED
DTSTART;VALUE=DATE-TIME:20050810T123000Z
DTEND;VALUE=DATE-TIME:20050810T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a054739@cern.ch
DESCRIPTION:Main topic :\n- metallic structures for muon system - status.\
 n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\n\nCANCELLED - REPLACED
  BY THE WORK PACKAGE ANALYSE MEETING FOR STARTING THE MODIFICATIONS TO THE
  CONTROL ROOMS (D3 GANGWAYS) ASAP (scheduled from 29 Aug.).\n\nhttp://indi
 co.cern.ch/conferenceDisplay.py?confId=a054739
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a054739
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 29/2005 - Infrastructure Issues - Review
DTSTART;VALUE=DATE-TIME:20050824T123000Z
DTEND;VALUE=DATE-TIME:20050824T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a054740@cern.ch
DESCRIPTION:Main topics :\n- Infrastructure Issues - Review\n- Transport o
 f RICH2 (13 Sept. 2005) - Summary\n- Cold down test programme - QRL sector
  7-8\n\nMEETING ROOM BDG 2889 R-009 (PIT8) AS USUAL.\n\nhttp://indico.cern
 .ch/conferenceDisplay.py?confId=a054740
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a054740
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 30/2005 - LHC Cryogenics at pit 8 - Status
DTSTART;VALUE=DATE-TIME:20050831T123000Z
DTEND;VALUE=DATE-TIME:20050831T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a054741@cern.ch
DESCRIPTION:Main topic :\n- Preparation of the cooling-down programme of t
 he QRL sector 8-7 scheduled for 12th Sept. 05 - Evaluation of the impact o
 n the current LHCb activities.\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS U
 SUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a054741
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a054741
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 31/2005 - Current Activities at Pit 8- Summary
DTSTART;VALUE=DATE-TIME:20050907T123000Z
DTEND;VALUE=DATE-TIME:20050907T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a054742@cern.ch
DESCRIPTION:Main topics :\n- QRL Sectot 8-7 A : preparation of the pressur
 e tests no 2 scheduled for Thurs. 8 September 2005.\n- QRL Sector 8-1 Junc
 tion : schedule for dismantling the scaffolding - status.\n- brief status 
 of the other current activities in UX85 cavern.\n- ODH course using a vide
 o performed by G. Lindell SC.\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS US
 UAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a054742
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a054742
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 32/2005 - Current co-activities in UX85
DTSTART;VALUE=DATE-TIME:20050914T123000Z
DTEND;VALUE=DATE-TIME:20050914T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a055878@cern.ch
DESCRIPTION:Main topics :\n- Cooling down of the QRL A (sector 8-7) - Prog
 ress\n- Brief status of the current LHCb activities in UX85\n\nMEETING ROO
 M BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisp
 lay.py?confId=a055878
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a055878
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 33/2005 - Co-activities in UX85 -  Current Status
DTSTART;VALUE=DATE-TIME:20050921T123000Z
DTEND;VALUE=DATE-TIME:20050921T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a055999@cern.ch
DESCRIPTION:Main topics :\n- QRL junction 8-1 - Commissioning & dismantlin
 g of the scaffolding - Status\n- Fence between cryo area and LHCb detector
  area - Status\n- Preparation transportation of RICH2\n- other current act
 ivities\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.
 cern.ch/conferenceDisplay.py?confId=a055999
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a055999
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 34/2005 - Infrastructure Issues - Status
DTSTART;VALUE=DATE-TIME:20050928T123000Z
DTEND;VALUE=DATE-TIME:20050928T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a056183@cern.ch
DESCRIPTION:Main topics :\n1 - Infrastructure issues - status\n2 - Other s
 mall works\n\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL\n\nhttp://ind
 ico.cern.ch/conferenceDisplay.py?confId=a056183
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a056183
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 35/2005 - Metallic Structures - Progress
DTSTART;VALUE=DATE-TIME:20051005T123000Z
DTEND;VALUE=DATE-TIME:20051005T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a056204@cern.ch
DESCRIPTION:Main topics :\n1 - Metallic structures - Progress\n2 - Other c
 urrent activities\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp
 ://indico.cern.ch/conferenceDisplay.py?confId=a056204
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a056204
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 36/2005 - Cooling Systems - Progress
DTSTART;VALUE=DATE-TIME:20051012T123000Z
DTEND;VALUE=DATE-TIME:20051012T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a056497@cern.ch
DESCRIPTION:Main topics \;\n1 - Cooling systems - Progress\n2 - Magnetic f
 ield measurement in Nov. 05 - Preparation\n\nMEETING ROOM BDG 2889 R-009 (
 PIT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a056
 497
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a056497
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 28/2006 - Current Activities - Status
DTSTART;VALUE=DATE-TIME:20051014T060000Z
DTEND;VALUE=DATE-TIME:20051014T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a056655@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=a056655
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a056655
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 37/2005 - Current Activities - Status
DTSTART;VALUE=DATE-TIME:20051019T123000Z
DTEND;VALUE=DATE-TIME:20051019T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a056658@cern.ch
DESCRIPTION:Main topic:\n- progress on current activities.\n\nMEETING ROOM
 M BDG 2889 R-009 (Pit 8) AS USUAL\n\nhttp://indico.cern.ch/conferenceDispl
 ay.py?confId=a056658
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a056658
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 38/2005 - Current activities - Progress
DTSTART;VALUE=DATE-TIME:20051026T123000Z
DTEND;VALUE=DATE-TIME:20051026T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a056887@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=a056887
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a056887
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 39/2005 - Forthcoming Activities - Summary
DTSTART;VALUE=DATE-TIME:20051102T133000Z
DTEND;VALUE=DATE-TIME:20051102T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a057004@cern.ch
DESCRIPTION:Main topics :\n1 - Matters arising - LHCb Magnet - Tests & Fie
 ld mapping - Status\n2 - Installation of the muon tower (cryo side) - Summ
 ary\n3 - Transport of the RICH2 (15 Nov. 05) - Summary (POSTPONED to Wed. 
 09 Nov.)\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://indico
 .cern.ch/conferenceDisplay.py?confId=a057004
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a057004
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 40/2005 - RICH2 & Magnet - Progress
DTSTART;VALUE=DATE-TIME:20051109T133000Z
DTEND;VALUE=DATE-TIME:20051109T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a057242@cern.ch
DESCRIPTION:Main topics :\n1 - Tests & Field mapping programme - Status - 
 Updated schedule\n2 - Transport of RICH2 (15-16 Nov. 05)\n3 - Metallic str
 uctures around detectors - Progress\n\n\nMEETING ROOM BDG 2889 R-009 (PIT 
 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a057242
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a057242
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 41/2005 - Electrical Distribution (2 x 1.25 MVA) - Status
DTSTART;VALUE=DATE-TIME:20051116T133000Z
DTEND;VALUE=DATE-TIME:20051116T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a057478@cern.ch
DESCRIPTION:Main topics :\n1 - Electrical Distribution (2 x 1.25 MVA) - St
 atus \n2 - Transport & Installation of RICH2 (14-17 Nov. 05) - Status\n3 -
  Field mapping from 18/11 - Preparation - Latest news.\n4 - Survey Issues 
 - Report on measurements of motions of the coils. \n\nMEETING ROOM BDG 288
 9 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?co
 nfId=a057478
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a057478
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 42/2005 - Current activities - Progress
DTSTART;VALUE=DATE-TIME:20051123T133000Z
DTEND;VALUE=DATE-TIME:20051123T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a057288@cern.ch
DESCRIPTION:Main topics :\n- QRL Sector 8-1 - Cooling programme started Tu
 esday 22 Nov. 05 morning - brief status will be reported by cryogenics peo
 ple.\n- RICH2 is now in place Sat. 19 Nov. - summary & pictures will be pr
 esented. \n- 2nd  major work in UX85 : Field mapping programme scheduled f
 rom Wed. 23 Nov. 05 untill 12 December 05.\n- Safety recommendations in UX
 85 cavern - Two major activities are ongoing QRL CRYO & LHCb MAGNET - PLEA
 SE RESPECT WORKSITE AREAS & ACCESS RESTRICTION.\n\nMEETING ROOM BDG 2889 R
 -009 (PIT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confI
 d=a057288
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a057288
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 43/2205 - Shielding Plugs - Installation
DTSTART;VALUE=DATE-TIME:20051207T133000Z
DTEND;VALUE=DATE-TIME:20051207T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a058085@cern.ch
DESCRIPTION:Main topics :\n1 - Shielding plugs - preparation of installati
 on scheduled for Jan- Feb. 06.\n2 - Works to be achieved before X-mas - Su
 mmary.\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.c
 ern.ch/conferenceDisplay.py?confId=a058085
LOCATION:CERN 2289-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a058085
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 44/2005 - RADMON Monitors at Pit 8 - Status
DTSTART;VALUE=DATE-TIME:20051214T133000Z
DTEND;VALUE=DATE-TIME:20051214T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a058159@cern.ch
DESCRIPTION:Main topics :\n\n1 - RADMON Monitors at pit 8 - Status\n2 - LH
 Cb Magnet - Filed Mapping - Status\n3 - 2005 Activities in UX85 - Summary\
 n4 - Infrastructure - Workload for Q1/Q2 2006 - Scope\n\nMEETING ROOM BDG 
 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py
 ?confId=a058159
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a058159
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 01/2006 - Metallic Structures - Progress
DTSTART;VALUE=DATE-TIME:20060111T133000Z
DTEND;VALUE=DATE-TIME:20060111T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a06134@cern.ch
DESCRIPTION:Main topics :\n- Metallic structures around detectors - Status
  & Plans\n- Other major infrastructure issues for 2006 - Goals & Milestone
 s\n\nMEETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL.\n\nhttp://indico.cern.c
 h/conferenceDisplay.py?confId=a06134
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a06134
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 02/2006 - Electrical Power Station - Status
DTSTART;VALUE=DATE-TIME:20060118T133000Z
DTEND;VALUE=DATE-TIME:20060118T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-a06547@cern.ch
DESCRIPTION:Main topics :\n1 - Electrical Power Station (2x1.25 MVA) - Sta
 tus\n2 - Activities at the IP8 area\n\nMEETING ROOM BDG 2889 R-009 (PIT 8)
  AS USUAL.\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=a06547
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=a06547
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 03/2006 - Current Activities - Review
DTSTART;VALUE=DATE-TIME:20060125T133000Z
DTEND;VALUE=DATE-TIME:20060125T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-731@cern.ch
DESCRIPTION:Main topics :\n1 - Current Activities in the UX85 cavern - Rev
 iew. \n \n2 - Workshop on the main radiation shielding wall - Info.  \n\nM
 EETING ROOM BDG 2889 R-009 (PIT 8) AS USUAL\n\nhttp://indico.cern.ch/confe
 renceDisplay.py?confId=731
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=731
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 04/2006 - Cooling Systems - Progress
DTSTART;VALUE=DATE-TIME:20060201T133000Z
DTEND;VALUE=DATE-TIME:20060201T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-835@cern.ch
DESCRIPTION:Main Topics :\n1 - Cooling systems - Status.\n2 - Preparation 
 installation chicane.\n\nMEETING ROOM BDG 2889-R-009 (PIT 8) AS USUAL.\n\n
 http://indico.cern.ch/conferenceDisplay.py?confId=835
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=835
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb Radiation Shielding Wall - UX85 Cavern - Review
DTSTART;VALUE=DATE-TIME:20060202T133000Z
DTEND;VALUE=DATE-TIME:20060202T163000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-837@cern.ch
DESCRIPTION:The purpose of this mini-workshop (1/2 day) is the review of a
 ll aspects of the upper & front parts of the shield in order to fix the la
 st details before the construction and installation. The installation is n
 ow re-scheduled as follows :\n1 - Upper part : from Feb. until Aug.06.\n2 
 - Front part : from Sept. until Nov.06.\n\nMEETING ROOM BDG 2889-R-009 (PI
 T 8).\n\nhttp://indico.cern.ch/conferenceDisplay.py?confId=837
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=837
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 05/2006 - Radiation Shielding Plugs - Installation
DTSTART;VALUE=DATE-TIME:20060208T133000Z
DTEND;VALUE=DATE-TIME:20060208T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-928@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=928
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=928
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 06/2006 - Muon Activities - Cryo Side - Summary
DTSTART;VALUE=DATE-TIME:20060215T133000Z
DTEND;VALUE=DATE-TIME:20060215T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-1028@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=1028
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=1028
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 07/2006 - Sniffer System - Progress
DTSTART;VALUE=DATE-TIME:20060222T133000Z
DTEND;VALUE=DATE-TIME:20060222T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-1139@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=1139
LOCATION:CERN
URL:http://indico.cern.ch/conferenceDisplay.py?confId=1139
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 08/2006 - Shielding Plugs & Chicane - Progress
DTSTART;VALUE=DATE-TIME:20060301T133000Z
DTEND;VALUE=DATE-TIME:20060301T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-1203@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=1203
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=1203
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 09/2006 - Cryo Activities at Pit 8 & ODH System in UX85
DTSTART;VALUE=DATE-TIME:20060308T133000Z
DTEND;VALUE=DATE-TIME:20060308T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-1273@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=1273
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=1273
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 10/2006 - Installation of Cable Trays - Progress
DTSTART;VALUE=DATE-TIME:20060315T133000Z
DTEND;VALUE=DATE-TIME:20060315T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-1336@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=1336
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=1336
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 11/2006  - Remaining Metallic structures - Status
DTSTART;VALUE=DATE-TIME:20060322T133000Z
DTEND;VALUE=DATE-TIME:20060322T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-1465@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=1465
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=1465
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 12/2006 - Installation of OT Support - Status
DTSTART;VALUE=DATE-TIME:20060329T123000Z
DTEND;VALUE=DATE-TIME:20060329T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-1501@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=1501
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=1501
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 13/2006 - Interference Outer Trackers/Cryogenics Platforms
DTSTART;VALUE=DATE-TIME:20060405T123000Z
DTEND;VALUE=DATE-TIME:20060405T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-1690@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=1690
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=1690
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 14/2006 - Installation of Cranes above VELO & RICH1
DTSTART;VALUE=DATE-TIME:20060412T123000Z
DTEND;VALUE=DATE-TIME:20060412T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-1747@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=1747
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=1747
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 15/2006 - Support for Cable Trays above TX - Status
DTSTART;VALUE=DATE-TIME:20060419T123000Z
DTEND;VALUE=DATE-TIME:20060419T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-1752@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=1752
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=1752
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 16/2006 - Current Activities - Progress
DTSTART;VALUE=DATE-TIME:20060426T133000Z
DTEND;VALUE=DATE-TIME:20060426T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-1754@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=1754
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=1754
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 17/2006 - Installation of VELO Vacuum Vessel
DTSTART;VALUE=DATE-TIME:20060503T123000Z
DTEND;VALUE=DATE-TIME:20060503T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-2989@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=2989
LOCATION:CERN
URL:http://indico.cern.ch/conferenceDisplay.py?confId=2989
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 18/2006 - Installation of VELO Vacuum Vessel (2)
DTSTART;VALUE=DATE-TIME:20060510T123000Z
DTEND;VALUE=DATE-TIME:20060510T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-3114@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=3114
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=3114
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 19/2006 - Installation of Cable Trays - Progress & Plans
DTSTART;VALUE=DATE-TIME:20060517T123000Z
DTEND;VALUE=DATE-TIME:20060517T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-3268@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=3268
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=3268
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 20/2006 - Cooling Systems - Status
DTSTART;VALUE=DATE-TIME:20060524T123000Z
DTEND;VALUE=DATE-TIME:20060524T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-3343@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=3343
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=3343
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 21/2006 - Installation of PS/SPD Modules
DTSTART;VALUE=DATE-TIME:20060607T123000Z
DTEND;VALUE=DATE-TIME:20060607T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-3553@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=3553
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=3553
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 22/2006 - Installation Bridge & C-Frame Support Trackers
DTSTART;VALUE=DATE-TIME:20060614T123000Z
DTEND;VALUE=DATE-TIME:20060614T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-3723@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=3723
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=3723
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 23/2006 - Installation RICH1 Gas Enclosure
DTSTART;VALUE=DATE-TIME:20060621T123000Z
DTEND;VALUE=DATE-TIME:20060621T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-3854@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=3854
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=3854
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 24/2006 - Installation of Beampipe - Preparation
DTSTART;VALUE=DATE-TIME:20060628T123000Z
DTEND;VALUE=DATE-TIME:20060628T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-3835@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=3835
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=3835
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 27/2006 - Installation of TT Support  - Progress
DTSTART;VALUE=DATE-TIME:20060705T123000Z
DTEND;VALUE=DATE-TIME:20060705T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-4229@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=4229
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=4229
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 28/2006 - Cabling of sub-detectors - Start-up
DTSTART;VALUE=DATE-TIME:20060712T123000Z
DTEND;VALUE=DATE-TIME:20060712T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-4307@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=4307
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=4307
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 29/2006 - Cooling shutdown plans
DTSTART;VALUE=DATE-TIME:20060719T123000Z
DTEND;VALUE=DATE-TIME:20060719T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-4308@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=4308
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=4308
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 30/2006 - Gas Distribution System from surface  -  Status
DTSTART;VALUE=DATE-TIME:20060726T123000Z
DTEND;VALUE=DATE-TIME:20060726T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-4866@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=4866
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=4866
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 31/2006 - Current Activities in UX85 -  Status
DTSTART;VALUE=DATE-TIME:20060809T123000Z
DTEND;VALUE=DATE-TIME:20060809T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-5123@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=5123
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=5123
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 32/2006 - Installation of RAMSES in UX85 -  Status
DTSTART;VALUE=DATE-TIME:20060816T123000Z
DTEND;VALUE=DATE-TIME:20060816T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-5124@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=5124
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=5124
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 33/2006 - Installation of 1st part of vacuum beampipe - St
 atus
DTSTART;VALUE=DATE-TIME:20060823T123000Z
DTEND;VALUE=DATE-TIME:20060823T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-5272@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=5272
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=5272
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 34/2006 - Installation of 1st part of vacuum beampipe (2) 
 -  Status
DTSTART;VALUE=DATE-TIME:20060830T123000Z
DTEND;VALUE=DATE-TIME:20060830T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-5273@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=5273
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=5273
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 35/2006 - Installation of Access Tower for HCAL
DTSTART;VALUE=DATE-TIME:20060906T123000Z
DTEND;VALUE=DATE-TIME:20060906T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-5811@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=5811
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=5811
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 36/2006 - Metallic platforms for TT & RICH1 gas rack
DTSTART;VALUE=DATE-TIME:20060913T123000Z
DTEND;VALUE=DATE-TIME:20060913T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-5813@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=5813
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=5813
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 37/2006 - Gas Distribution System - Status
DTSTART;VALUE=DATE-TIME:20060920T123000Z
DTEND;VALUE=DATE-TIME:20060920T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-5814@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=5814
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=5814
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 38/2006 - Platform above RICH2- Status
DTSTART;VALUE=DATE-TIME:20060927T123000Z
DTEND;VALUE=DATE-TIME:20060927T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-5815@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=5815
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=5815
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 39/2006 - Water cooling piping work - Status
DTSTART;VALUE=DATE-TIME:20061004T123000Z
DTEND;VALUE=DATE-TIME:20061004T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-6820@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=6820
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=6820
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 40/2006 - Cabling & Services for Muon System - Brief Overv
 iew
DTSTART;VALUE=DATE-TIME:20061011T123000Z
DTEND;VALUE=DATE-TIME:20061011T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-7049@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=7049
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=7049
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 41/2006 - Radiation Shield - Upper Part - Status
DTSTART;VALUE=DATE-TIME:20061018T123000Z
DTEND;VALUE=DATE-TIME:20061018T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-7386@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=7386
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=7386
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 42/2006 - Installation of Beampipe (phase 2) - Status & Pl
 ans
DTSTART;VALUE=DATE-TIME:20061025T123000Z
DTEND;VALUE=DATE-TIME:20061025T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-7387@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=7387
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=7387
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 43/2006 - Vacuum  Beam-pipe (phase 2) - Status & Plans
DTSTART;VALUE=DATE-TIME:20061101T133000Z
DTEND;VALUE=DATE-TIME:20061101T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-7388@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=7388
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=7388
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 44/2006 - Gas piping on the gantry - Review
DTSTART;VALUE=DATE-TIME:20061108T133000Z
DTEND;VALUE=DATE-TIME:20061108T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-8623@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=8623
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=8623
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 45/2006 - Installation supports & Cable chains for CALOs
DTSTART;VALUE=DATE-TIME:20061115T133000Z
DTEND;VALUE=DATE-TIME:20061115T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-8815@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=8815
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=8815
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 46/2006 - OT - Status & Displacement Assembly Area
DTSTART;VALUE=DATE-TIME:20061122T133000Z
DTEND;VALUE=DATE-TIME:20061122T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-8872@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=8872
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=8872
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 47/2006 - Installation of TT - Review
DTSTART;VALUE=DATE-TIME:20061206T133000Z
DTEND;VALUE=DATE-TIME:20061206T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-9540@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=9540
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=9540
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 48/2006 - Trays & Cabling - Status & Plans for 07
DTSTART;VALUE=DATE-TIME:20061213T133000Z
DTEND;VALUE=DATE-TIME:20061213T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-9541@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=9541
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=9541
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 49/2006 - X-mas Shutdown - Recommendations
DTSTART;VALUE=DATE-TIME:20061220T133000Z
DTEND;VALUE=DATE-TIME:20061220T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-9542@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=9542
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=9542
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 01/2007 - Current Activities - Review
DTSTART;VALUE=DATE-TIME:20070110T133000Z
DTEND;VALUE=DATE-TIME:20070110T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-10468@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=10468
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=10468
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 02/2007 - Detector Services - Status & Plans
DTSTART;VALUE=DATE-TIME:20070117T133000Z
DTEND;VALUE=DATE-TIME:20070117T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-11099@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=11099
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=11099
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 03/2007 - Current activities on CALOS & PS/SPD
DTSTART;VALUE=DATE-TIME:20070124T133000Z
DTEND;VALUE=DATE-TIME:20070124T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-11535@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=11535
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=11535
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 04/2007 - Radiation Shield - Upper Part - Progress
DTSTART;VALUE=DATE-TIME:20070131T133000Z
DTEND;VALUE=DATE-TIME:20070131T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-11898@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=11898
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=11898
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 05/2007 - Gas piping on the gantry - Status
DTSTART;VALUE=DATE-TIME:20070207T133000Z
DTEND;VALUE=DATE-TIME:20070207T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-12245@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=12245
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=12245
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 06/2007 - Installation of LHCb Beampipe  - Progress
DTSTART;VALUE=DATE-TIME:20070221T133000Z
DTEND;VALUE=DATE-TIME:20070221T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-12920@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=12920
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=12920
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 07/2007 - Electrical installation in UX85 - Status
DTSTART;VALUE=DATE-TIME:20070228T133000Z
DTEND;VALUE=DATE-TIME:20070228T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-13034@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=13034
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=13034
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 08/2007 - Installation of RAMSES in UX85 - Progress
DTSTART;VALUE=DATE-TIME:20070307T133000Z
DTEND;VALUE=DATE-TIME:20070307T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-13404@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=13404
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=13404
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 09/2007 - Gas piping - Progress
DTSTART;VALUE=DATE-TIME:20070314T133000Z
DTEND;VALUE=DATE-TIME:20070314T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-13830@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=13830
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=13830
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 10/2007 - Fire Detection at pit 8 (UX85) - Review
DTSTART;VALUE=DATE-TIME:20070321T133000Z
DTEND;VALUE=DATE-TIME:20070321T160000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-13995@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=13995
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=13995
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 11/2007 - Radiation Shield  - Status
DTSTART;VALUE=DATE-TIME:20070328T123000Z
DTEND;VALUE=DATE-TIME:20070328T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-13998@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=13998
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=13998
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 12/2007 - Access Control System at Pit8 - Status
DTSTART;VALUE=DATE-TIME:20070418T123000Z
DTEND;VALUE=DATE-TIME:20070418T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-15111@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=15111
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=15111
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 13/2007 - Gas piping on the gantry - Updated Plans
DTSTART;VALUE=DATE-TIME:20070425T123000Z
DTEND;VALUE=DATE-TIME:20070425T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-15447@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=15447
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=15447
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 14/2007 - Smoke & Leak Detection Devices - Results of test
 s (27/04/07)
DTSTART;VALUE=DATE-TIME:20070502T123000Z
DTEND;VALUE=DATE-TIME:20070502T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-15616@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=15616
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=15616
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 15/2007 - Grounding in UX85 - Requirements & Status
DTSTART;VALUE=DATE-TIME:20070509T123000Z
DTEND;VALUE=DATE-TIME:20070509T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-15869@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=15869
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=15869
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 16/2007 - Safety Systems at pit8 - Status
DTSTART;VALUE=DATE-TIME:20070516T123000Z
DTEND;VALUE=DATE-TIME:20070516T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-16281@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=16281
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=16281
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 17/2007 - Radiation Shield in UX85 - Progress
DTSTART;VALUE=DATE-TIME:20070523T123000Z
DTEND;VALUE=DATE-TIME:20070523T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-16282@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=16282
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=16282
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 18/2007 -  Current Activities - Overview
DTSTART;VALUE=DATE-TIME:20070530T123000Z
DTEND;VALUE=DATE-TIME:20070530T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-16842@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=16842
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=16842
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 19/2007 -  Ventilation in UX85 - Status
DTSTART;VALUE=DATE-TIME:20070613T123000Z
DTEND;VALUE=DATE-TIME:20070613T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-17320@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=17320
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=17320
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 20/2007 -  Commissioning of LHCb Vacuum Beampipe - Results
DTSTART;VALUE=DATE-TIME:20070627T120000Z
DTEND;VALUE=DATE-TIME:20070627T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-18076@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=18076
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=18076
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 21/2007 -  INB Rules & LHCb - Current thinking
DTSTART;VALUE=DATE-TIME:20070704T123000Z
DTEND;VALUE=DATE-TIME:20070704T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-18322@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=18322
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=18322
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 22/2007 -   CANCELLED
DTSTART;VALUE=DATE-TIME:20070711T120000Z
DTEND;VALUE=DATE-TIME:20070711T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-18323@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=18323
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=18323
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 23/2007 -   Radiation Shielding Wall - Status
DTSTART;VALUE=DATE-TIME:20070718T120000Z
DTEND;VALUE=DATE-TIME:20070718T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-18324@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=18324
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=18324
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 24/2007 -  Freon Cooling Systems - Status
DTSTART;VALUE=DATE-TIME:20070725T120000Z
DTEND;VALUE=DATE-TIME:20070725T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-18325@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=18325
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=18325
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 25/2007 -  Gas Piping on the Gantry - Status
DTSTART;VALUE=DATE-TIME:20070808T120000Z
DTEND;VALUE=DATE-TIME:20070808T140500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-19498@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=19498
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=19498
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 26/2007 -  Shielding Wall - Front Part - Progress
DTSTART;VALUE=DATE-TIME:20070815T120000Z
DTEND;VALUE=DATE-TIME:20070815T140500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-19994@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=19994
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=19994
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 27/2007 -  Current Activities - Overview
DTSTART;VALUE=DATE-TIME:20070829T120000Z
DTEND;VALUE=DATE-TIME:20070829T140500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-20467@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=20467
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=20467
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 28/2007 -  LHC Cryogenics at Pit 8 - Status & Plans
DTSTART;VALUE=DATE-TIME:20070905T120000Z
DTEND;VALUE=DATE-TIME:20070905T140500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-20589@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=20589
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=20589
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 29/2007 -  Mobile Shielding Plug (RB84)- Status
DTSTART;VALUE=DATE-TIME:20070919T120000Z
DTEND;VALUE=DATE-TIME:20070919T140500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-21391@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=21391
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=21391
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 30/2007 -  LHCb dipole Magnet Run (Oct. 07) - Programme
DTSTART;VALUE=DATE-TIME:20070926T120000Z
DTEND;VALUE=DATE-TIME:20070926T140500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-21682@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=21682
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=21682
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 31/2007 -  Installation of VELO-detectors -  Status & Plan
 s
DTSTART;VALUE=DATE-TIME:20071003T120000Z
DTEND;VALUE=DATE-TIME:20071003T144500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-22021@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=22021
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=22021
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 32/2007 -  Magnet Test Programme - Progress
DTSTART;VALUE=DATE-TIME:20071010T120000Z
DTEND;VALUE=DATE-TIME:20071010T144500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-22402@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=22402
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=22402
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 33/2007 -  Survey of structures during magnet tests - Resu
 lts
DTSTART;VALUE=DATE-TIME:20071017T123000Z
DTEND;VALUE=DATE-TIME:20071017T144500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-22491@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=22491
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=22491
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 34/2007 -  Displacements of coils during magnet tests - Re
 sults
DTSTART;VALUE=DATE-TIME:20071024T123000Z
DTEND;VALUE=DATE-TIME:20071024T144500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-22744@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=22744
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=22744
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 35/2007 -  Gas piping network - Status
DTSTART;VALUE=DATE-TIME:20071031T133000Z
DTEND;VALUE=DATE-TIME:20071031T154500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-22493@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=22493
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=22493
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 36/2007 -  Radiation Shielding Wall - Progress
DTSTART;VALUE=DATE-TIME:20071107T133000Z
DTEND;VALUE=DATE-TIME:20071107T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-23459@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=23459
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=23459
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 37/2007 -  Installation of Inner Trackers - Status & Plans
DTSTART;VALUE=DATE-TIME:20071114T133000Z
DTEND;VALUE=DATE-TIME:20071114T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-23561@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=23561
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=23561
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 38/2007 -  Water Cooling Pipelines - Non-conformities
DTSTART;VALUE=DATE-TIME:20071121T133000Z
DTEND;VALUE=DATE-TIME:20071121T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-24149@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=24149
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=24149
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 39/2007 -  Current Activities - Overview
DTSTART;VALUE=DATE-TIME:20071128T133000Z
DTEND;VALUE=DATE-TIME:20071128T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-24269@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=24269
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=24269
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 40/2007 -  Water Cooling Pipelines - Repair Scenario
DTSTART;VALUE=DATE-TIME:20071205T133000Z
DTEND;VALUE=DATE-TIME:20071205T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-24270@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=24270
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=24270
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 41/2007 -  Actions before X-mas & Preparation shutdown  - 
 Overview
DTSTART;VALUE=DATE-TIME:20071212T133000Z
DTEND;VALUE=DATE-TIME:20071212T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-24271@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=24271
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=24271
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 42/2007 -  2007 Progress Report - Mtg CANCELLED
DTSTART;VALUE=DATE-TIME:20071219T133000Z
DTEND;VALUE=DATE-TIME:20071219T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-24272@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=24272
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=24272
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 01/2008 -  Cooling Pipelines - Repair Work - Progress
DTSTART;VALUE=DATE-TIME:20080109T133000Z
DTEND;VALUE=DATE-TIME:20080109T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-25264@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=25264
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=25264
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 02/2008 -  Current Activities - Overview
DTSTART;VALUE=DATE-TIME:20080116T133000Z
DTEND;VALUE=DATE-TIME:20080116T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-25316@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=25316
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=25316
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 03/2008 -  Cooling Pipelines - End of Repair Work - Meetin
 g CANCELLED
DTSTART;VALUE=DATE-TIME:20080123T133000Z
DTEND;VALUE=DATE-TIME:20080123T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-25317@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=25317
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=25317
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 04/2008 -  Water Cooling - End of Repair Work & Commission
 ing - Review
DTSTART;VALUE=DATE-TIME:20080130T133000Z
DTEND;VALUE=DATE-TIME:20080130T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-25318@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=25318
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=25318
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 05/2008 -   Radiation Shielding Wall - Status & Plans
DTSTART;VALUE=DATE-TIME:20080206T133000Z
DTEND;VALUE=DATE-TIME:20080206T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-28517@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=28517
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=28517
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 06/2008 -   Open Days at Pit 8 - Preparation
DTSTART;VALUE=DATE-TIME:20080220T133000Z
DTEND;VALUE=DATE-TIME:20080220T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-28889@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=28889
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=28889
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 07/2008 -   Commissioning of Gas Systems - Progress
DTSTART;VALUE=DATE-TIME:20080227T133000Z
DTEND;VALUE=DATE-TIME:20080227T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-28890@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=28890
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=28890
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 08/2008 -   Current Activities - Review
DTSTART;VALUE=DATE-TIME:20080305T133000Z
DTEND;VALUE=DATE-TIME:20080305T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-29692@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=29692
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=29692
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 09/2008 -   Commissioning of Cooling Systems- Progress
DTSTART;VALUE=DATE-TIME:20080312T133000Z
DTEND;VALUE=DATE-TIME:20080312T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-29693@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=29693
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=29693
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 10/2008 -   Vacuum beampipe - Tests Week 13 - CANCELLED
DTSTART;VALUE=DATE-TIME:20080326T133000Z
DTEND;VALUE=DATE-TIME:20080326T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-30799@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=30799
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=30799
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 11/2008 -  Preparation Open Days at Pit 8 - Status
DTSTART;VALUE=DATE-TIME:20080402T123000Z
DTEND;VALUE=DATE-TIME:20080402T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-31551@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=31551
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=31551
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 12/2008 -  Radiation Shielding Wall -  Last Step
DTSTART;VALUE=DATE-TIME:20080409T123000Z
DTEND;VALUE=DATE-TIME:20080409T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-31939@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=31939
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=31939
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 13/2008 -  Radiation Shield - A dedicated lifting beam - C
 onsolidation project
DTSTART;VALUE=DATE-TIME:20080416T123000Z
DTEND;VALUE=DATE-TIME:20080416T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-32297@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=32297
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=32297
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 14/2008 -  Remaining Works before closing Expt Area - Revi
 ew
DTSTART;VALUE=DATE-TIME:20080430T123000Z
DTEND;VALUE=DATE-TIME:20080430T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-33127@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=33127
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=33127
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 15/2008 -  UX85 Access Change - Final Configuration
DTSTART;VALUE=DATE-TIME:20080507T123000Z
DTEND;VALUE=DATE-TIME:20080507T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-33431@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=33431
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=33431
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 16/2008 -  Handling & Transport Service - Status & Plans
DTSTART;VALUE=DATE-TIME:20080514T123000Z
DTEND;VALUE=DATE-TIME:20080514T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-33432@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=33432
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=33432
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 17/2008 -  LHCb Magnet Test in June 08 - Preparation
DTSTART;VALUE=DATE-TIME:20080521T123000Z
DTEND;VALUE=DATE-TIME:20080521T144500Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-33433@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=33433
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=33433
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 18/2008 -  Remaining Activities - Overview     -   CANCELL
 ED
DTSTART;VALUE=DATE-TIME:20080528T123000Z
DTEND;VALUE=DATE-TIME:20080528T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-34880@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=34880
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=34880
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 19/2008 -  Consolidation Projects- Review
DTSTART;VALUE=DATE-TIME:20080604T123000Z
DTEND;VALUE=DATE-TIME:20080604T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-34881@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=34881
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=34881
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 20/2008 -  Buffer zones for slightly radioactive items
DTSTART;VALUE=DATE-TIME:20080611T123000Z
DTEND;VALUE=DATE-TIME:20080611T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-33434@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=33434
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=33434
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 21/2008 -  LHCb Magnet Test Programme (4-11 June 08) - Res
 ults
DTSTART;VALUE=DATE-TIME:20080618T123000Z
DTEND;VALUE=DATE-TIME:20080618T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-34885@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=34885
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=34885
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 22/2008 -  LHCb Vacuum - Status
DTSTART;VALUE=DATE-TIME:20080625T123000Z
DTEND;VALUE=DATE-TIME:20080625T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-34891@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=34891
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=34891
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 23/2008 -  Last Remaining Tasks before closure
DTSTART;VALUE=DATE-TIME:20080702T123000Z
DTEND;VALUE=DATE-TIME:20080702T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-34895@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=34895
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=34895
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 24/2008 -  Closing UXB Area (detector) - Status - CANCELLE
 D
DTSTART;VALUE=DATE-TIME:20080709T123000Z
DTEND;VALUE=DATE-TIME:20080709T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-34902@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=34902
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=34902
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 25/2008 -  LHC Start-up - Remaining work at pit 8- Status
DTSTART;VALUE=DATE-TIME:20080716T123000Z
DTEND;VALUE=DATE-TIME:20080716T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-34908@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=34908
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=34908
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 26/2008 -  Closure of Expt. Area - Preparation
DTSTART;VALUE=DATE-TIME:20080723T123000Z
DTEND;VALUE=DATE-TIME:20080723T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-34910@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=34910
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=34910
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 27/2008 -  Ventilation tests at pit 8- Summary
DTSTART;VALUE=DATE-TIME:20080730T122000Z
DTEND;VALUE=DATE-TIME:20080730T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-34912@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=34912
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=34912
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 28/2008 -  Radioactive sources in UX85 cavern- Overview
DTSTART;VALUE=DATE-TIME:20080806T123000Z
DTEND;VALUE=DATE-TIME:20080806T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-34898@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=34898
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=34898
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 29/2008 -  Closure of Detector Area (UXB) - Status & Plans
DTSTART;VALUE=DATE-TIME:20080813T123000Z
DTEND;VALUE=DATE-TIME:20080813T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-38794@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=38794
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=38794
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 30/2008 -  TI8 Test (22-25 Aug.)  across LHCb - Last works
  before closure
DTSTART;VALUE=DATE-TIME:20080820T123000Z
DTEND;VALUE=DATE-TIME:20080820T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-38795@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=38795
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=38795
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 31/2008 -  Buffer Areas for slightly radioactive component
 s - Status
DTSTART;VALUE=DATE-TIME:20080827T123000Z
DTEND;VALUE=DATE-TIME:20080827T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-38796@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=38796
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=38796
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 32/2008 -  Closure of Detector Area (UXB) - LHC Start-up -
  Status & Plans -   CANCELLED
DTSTART;VALUE=DATE-TIME:20080903T123000Z
DTEND;VALUE=DATE-TIME:20080903T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-38797@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=38797
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=38797
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 33/2008 -  Consolidation Projects - Overview - CANCELLED
DTSTART;VALUE=DATE-TIME:20080910T123000Z
DTEND;VALUE=DATE-TIME:20080910T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-38798@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=38798
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=38798
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 34/2008 -  Gangway UXB Side - Status & Plans
DTSTART;VALUE=DATE-TIME:20080917T123000Z
DTEND;VALUE=DATE-TIME:20080917T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-38801@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=38801
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=38801
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 35/2008 -  LHC Technical Problems - Impact on LHCb Activit
 ies
DTSTART;VALUE=DATE-TIME:20080924T123000Z
DTEND;VALUE=DATE-TIME:20080924T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-38799@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=38799
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=38799
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 36/2008 -  Re-opening of the UX85 cavern (A&B areas)
DTSTART;VALUE=DATE-TIME:20081001T123000Z
DTEND;VALUE=DATE-TIME:20081001T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-38800@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=38800
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=38800
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 37/2008 -  CANCELLED
DTSTART;VALUE=DATE-TIME:20081008T123000Z
DTEND;VALUE=DATE-TIME:20081008T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-39643@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=39643
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=39643
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 38/2008 -  LHC inauguration
DTSTART;VALUE=DATE-TIME:20081015T123000Z
DTEND;VALUE=DATE-TIME:20081015T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-39644@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=39644
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=39644
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 39/2008 -  CANCELLED
DTSTART;VALUE=DATE-TIME:20081022T123000Z
DTEND;VALUE=DATE-TIME:20081022T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-39645@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=39645
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=39645
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 40/2008 -  Consolidation Projects - Update
DTSTART;VALUE=DATE-TIME:20081029T133000Z
DTEND;VALUE=DATE-TIME:20081029T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-39646@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=39646
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=39646
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 41/2008 -  Current Activities at Pit8 - Overview
DTSTART;VALUE=DATE-TIME:20081105T133000Z
DTEND;VALUE=DATE-TIME:20081105T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-39647@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=39647
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=39647
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 42/2008 -  Agenda in preparation - CANCELLED
DTSTART;VALUE=DATE-TIME:20081112T133000Z
DTEND;VALUE=DATE-TIME:20081112T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-39648@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=39648
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=39648
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 43/2008 -  AUG & Evacuation switches in UX85 - Situation
DTSTART;VALUE=DATE-TIME:20081119T133000Z
DTEND;VALUE=DATE-TIME:20081119T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-39649@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=39649
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=39649
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 44/2008 -  Current Activities at Pit8 - CANCELLED
DTSTART;VALUE=DATE-TIME:20081126T133000Z
DTEND;VALUE=DATE-TIME:20081126T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-39650@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=39650
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=39650
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 45/2008 -  Shuntdown Activities at Pit8
DTSTART;VALUE=DATE-TIME:20081203T133000Z
DTEND;VALUE=DATE-TIME:20081203T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-39652@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=39652
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=39652
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 46/2008 -  Consolidation Projects - Progress
DTSTART;VALUE=DATE-TIME:20081210T132000Z
DTEND;VALUE=DATE-TIME:20081210T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-39653@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=39653
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=39653
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 47/2008 -  LHCb Activities at pit 8 - 2008 Highlights & Br
 ief Retrospective View
DTSTART;VALUE=DATE-TIME:20081217T133000Z
DTEND;VALUE=DATE-TIME:20081217T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-39654@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=39654
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=39654
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 48/2008 -  Agenda in preparation - CANCELLED
DTSTART;VALUE=DATE-TIME:20081224T133000Z
DTEND;VALUE=DATE-TIME:20081224T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-39651@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=39651
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=39651
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 01/2009 -  Current Activities - Review
DTSTART;VALUE=DATE-TIME:20090114T133000Z
DTEND;VALUE=DATE-TIME:20090114T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-48961@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=48961
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=48961
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 02/2009 -  Additional AUGs - Progress
DTSTART;VALUE=DATE-TIME:20090128T133000Z
DTEND;VALUE=DATE-TIME:20090128T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-50397@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=50397
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=50397
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 03/2009 -  Restructuring of LHCb Labs in SX8 - Project
DTSTART;VALUE=DATE-TIME:20090204T133000Z
DTEND;VALUE=DATE-TIME:20090204T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-50400@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=50400
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=50400
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 04/2009 -  Shuntdown Activities- Progress
DTSTART;VALUE=DATE-TIME:20090218T133000Z
DTEND;VALUE=DATE-TIME:20090218T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-50401@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=50401
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=50401
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 05/2009 -  Gas Distribution & Monitoring - Overview
DTSTART;VALUE=DATE-TIME:20090304T133000Z
DTEND;VALUE=DATE-TIME:20090304T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-53503@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=53503
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=53503
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 06/2009 -  LHCb Infrastructure Issues - Consolidation
DTSTART;VALUE=DATE-TIME:20090325T133000Z
DTEND;VALUE=DATE-TIME:20090325T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-53504@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=53504
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=53504
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 07/2009 -  CANCELLED
DTSTART;VALUE=DATE-TIME:20090408T123000Z
DTEND;VALUE=DATE-TIME:20090408T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-53505@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=53505
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=53505
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 08/2009 -  Tightness of shielding Plug (RB84)
DTSTART;VALUE=DATE-TIME:20090429T123000Z
DTEND;VALUE=DATE-TIME:20090429T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-53506@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=53506
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=53506
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 09/2009 -  Safety of Personnel in LHC underground areas - 
 Recommendations
DTSTART;VALUE=DATE-TIME:20090513T123000Z
DTEND;VALUE=DATE-TIME:20090513T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-53507@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=53507
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=53507
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 10/2009 -  CANCELLED
DTSTART;VALUE=DATE-TIME:20090527T123000Z
DTEND;VALUE=DATE-TIME:20090527T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-53508@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=53508
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=53508
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 11/2009 -  Current Activities at Pit8 - Progress
DTSTART;VALUE=DATE-TIME:20090603T123000Z
DTEND;VALUE=DATE-TIME:20090603T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-60154@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=60154
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=60154
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 12/2009 -  Protection of UX85 Area -  Status
DTSTART;VALUE=DATE-TIME:20090624T123000Z
DTEND;VALUE=DATE-TIME:20090624T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-62689@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=62689
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=62689
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 13/2009 -  Current Activities at Pit8 - Overview
DTSTART;VALUE=DATE-TIME:20090722T123000Z
DTEND;VALUE=DATE-TIME:20090722T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-64901@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=64901
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=64901
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 14/2009 -  Modifications to AUG chains in UX85 cavern - St
 atus
DTSTART;VALUE=DATE-TIME:20090812T123000Z
DTEND;VALUE=DATE-TIME:20090812T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-66082@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=66082
LOCATION:CERN 2889-R-009
URL:http://indico.cern.ch/conferenceDisplay.py?confId=66082
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 15/2009 -  Consolidation - Status
DTSTART;VALUE=DATE-TIME:20090902T123000Z
DTEND;VALUE=DATE-TIME:20090902T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-67359@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=67359
LOCATION:CERN 3894-R-008
URL:http://indico.cern.ch/conferenceDisplay.py?confId=67359
END:VEVENT
BEGIN:VEVENT
SUMMARY:
DTSTART;VALUE=DATE-TIME:20091007T123000Z
DTEND;VALUE=DATE-TIME:20091007T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-70230@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=70230
LOCATION:CERN 3894-R-008
URL:http://indico.cern.ch/conferenceDisplay.py?confId=70230
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 16/2009 -  Consolidation - Status Report
DTSTART;VALUE=DATE-TIME:20091007T123000Z
DTEND;VALUE=DATE-TIME:20091007T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-70232@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=70232
LOCATION:CERN 3894-R-008
URL:http://indico.cern.ch/conferenceDisplay.py?confId=70232
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHCb EA 17/2009 -  Consolidation activities at Surface & UX85A - S
 tatus
DTSTART;VALUE=DATE-TIME:20091125T133000Z
DTEND;VALUE=DATE-TIME:20091125T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T021606Z
UID:indico-event-74992@cern.ch
DESCRIPTION:http://indico.cern.ch/conferenceDisplay.py?confId=74992
LOCATION:CERN 3894-R-008
URL:http://indico.cern.ch/conferenceDisplay.py?confId=74992
END:VEVENT
END:VCALENDAR
