BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//CERN//INDICO//EN
BEGIN:VEVENT
SUMMARY:Safety file
DTSTART;VALUE=DATE-TIME:20120405T141000Z
DTEND;VALUE=DATE-TIME:20120405T142000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-11@cern.ch
DESCRIPTION:Speakers: BOTELHO DIREITO\, Jose Antonio (CERN)\nhttp://indico
 .cern.ch/contributionDisplay.py?contribId=11&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=11&confId=18360
 1
END:VEVENT
BEGIN:VEVENT
SUMMARY:Brine skid construction drawings
DTSTART;VALUE=DATE-TIME:20120405T135000Z
DTEND;VALUE=DATE-TIME:20120405T140000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-10@cern.ch
DESCRIPTION:Speakers: EGOROV\, Kirill (Indiana University (US))\nAdvanceme
 nt status\nKirill to provide a planning.\n\nhttp://indico.cern.ch/contribu
 tionDisplay.py?contribId=10&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=10&confId=18360
 1
END:VEVENT
BEGIN:VEVENT
SUMMARY:Electrical Cabling
DTSTART;VALUE=DATE-TIME:20120405T124000Z
DTEND;VALUE=DATE-TIME:20120405T125000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-13@cern.ch
DESCRIPTION:Speakers: LEFILS\, Daniel (CERN)\nCost of the cabling between 
 SU and SX\nConnection path between SX and SH and SU\nConnection length est
 imation: list of cable dimensions and length for the order\n- Jan and Serg
 ei M. contact for cabling (Juri and Michail)\n\nhttp://indico.cern.ch/cont
 ributionDisplay.py?contribId=13&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=13&confId=18360
 1
END:VEVENT
BEGIN:VEVENT
SUMMARY:Any Other Business
DTSTART;VALUE=DATE-TIME:20120405T142000Z
DTEND;VALUE=DATE-TIME:20120405T143000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-12@cern.ch
DESCRIPTION:Speakers: \nhttp://indico.cern.ch/contributionDisplay.py?contr
 ibId=12&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=12&confId=18360
 1
END:VEVENT
BEGIN:VEVENT
SUMMARY:Diesel Power supply situation
DTSTART;VALUE=DATE-TIME:20120405T122000Z
DTEND;VALUE=DATE-TIME:20120405T123000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-14@cern.ch
DESCRIPTION:Speakers: IWANSKI\, Wieslaw (CERN)\n- results of the discussio
 ns with ATLAD ID\n- schematics of power supply strategy in case of power c
 ut - magnet failure\n\nhttp://indico.cern.ch/contributionDisplay.py?contri
 bId=14&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=14&confId=18360
 1
END:VEVENT
BEGIN:VEVENT
SUMMARY:Control: Functional Analysis of Chiller\, Water and Brine circuits
DTSTART;VALUE=DATE-TIME:20120405T121000Z
DTEND;VALUE=DATE-TIME:20120405T122000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-1@cern.ch
DESCRIPTION:Speakers: ZWALINSKI\, Lukasz (CERN)\nComments from the second 
 version Lukasz has delivered. \nComment to the synoptics Lukasz has finali
 sed with Vinod.\nAny feed-backs from J&E Hall after their remote access?\n
 \nhttp://indico.cern.ch/contributionDisplay.py?contribId=1&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=1&confId=183601
END:VEVENT
BEGIN:VEVENT
SUMMARY:Integration: USA15 - roof
DTSTART;VALUE=DATE-TIME:20120405T131000Z
DTEND;VALUE=DATE-TIME:20120405T132000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-0@cern.ch
DESCRIPTION:Speakers: BONNEAU\, Pierre (CERN)\nUSA15 integration: where to
  pass the pipes\nRoof integration: advancement drawings\nsupport to Sylwia
  Wojnarska\n\nhttp://indico.cern.ch/contributionDisplay.py?contribId=0&con
 fId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=0&confId=183601
END:VEVENT
BEGIN:VEVENT
SUMMARY:TS electrical cupboards construction planning
DTSTART;VALUE=DATE-TIME:20120405T123000Z
DTEND;VALUE=DATE-TIME:20120405T124000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-3@cern.ch
DESCRIPTION:Speakers: CORBAZ\, Florian (CERN)\nElectrical study (Florian)\
 nList of components and detailed cost list (Florian)\nWork planning (Flori
 an)\n\nhttp://indico.cern.ch/contributionDisplay.py?contribId=3&confId=183
 601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=3&confId=183601
END:VEVENT
BEGIN:VEVENT
SUMMARY:C3F8 pipe installation update
DTSTART;VALUE=DATE-TIME:20120405T130000Z
DTEND;VALUE=DATE-TIME:20120405T131000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-2@cern.ch
DESCRIPTION:Speakers: LEFILS\, Daniel (CERN)\n- compensator installation p
 rocedure\n- spring installation\n- wooden support for pipe to be replaced\
 n- Support lay-out 3D and 2D\n- Support G06\n- Spacer on the supports some
 times are missing\n- Review the supporting in SDX1 area\n\nhttp://indico.c
 ern.ch/contributionDisplay.py?contribId=2&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=2&confId=183601
END:VEVENT
BEGIN:VEVENT
SUMMARY:2 kW Thermosiphon Tests
DTSTART;VALUE=DATE-TIME:20120405T125000Z
DTEND;VALUE=DATE-TIME:20120405T130000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-5@cern.ch
DESCRIPTION:Speakers: BOTELHO DIREITO\, Jose Antonio (CERN)\n- problems on
  the Julabo: report\n- minimum temperature reached.\n- stability\n- water-
 hammer effect feed-back\n\nhttp://indico.cern.ch/contributionDisplay.py?co
 ntribId=5&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=5&confId=183601
END:VEVENT
BEGIN:VEVENT
SUMMARY:Mechanical construction
DTSTART;VALUE=DATE-TIME:20120405T140000Z
DTEND;VALUE=DATE-TIME:20120405T141000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-4@cern.ch
DESCRIPTION:Speakers: BONNEAU\, Pierre (CERN)\, GUGULA\, Konrad (Polish Ac
 ademy of Sciences (PL))\nAdvancement status\n\nhttp://indico.cern.ch/contr
 ibutionDisplay.py?contribId=4&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=4&confId=183601
END:VEVENT
BEGIN:VEVENT
SUMMARY:Dummy load HEX problem
DTSTART;VALUE=DATE-TIME:20120405T132000Z
DTEND;VALUE=DATE-TIME:20120405T133000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-7@cern.ch
DESCRIPTION:Speakers: BOTELHO DIREITO\, Jose Antonio (CERN)\, Dr. DA RIVA\
 , Enrico (CERN)\nOffers from suppliers for right size\nSafety problem rela
 ted to 500 kg of glycole - pending\n\nhttp://indico.cern.ch/contributionDi
 splay.py?contribId=7&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=7&confId=183601
END:VEVENT
BEGIN:VEVENT
SUMMARY:Swap between TS and compressors
DTSTART;VALUE=DATE-TIME:20120405T133000Z
DTEND;VALUE=DATE-TIME:20120405T134000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-6@cern.ch
DESCRIPTION:Speakers: BONNEAU\, Pierre (CERN)\, BERRY\, Stephane (CERN)\nF
 unctional analysis idea\nP&I impact\n\nhttp://indico.cern.ch/contributionD
 isplay.py?contribId=6&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=6&confId=183601
END:VEVENT
BEGIN:VEVENT
SUMMARY:Condenser contract
DTSTART;VALUE=DATE-TIME:20120405T134000Z
DTEND;VALUE=DATE-TIME:20120405T135000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-9@cern.ch
DESCRIPTION:Speakers: Dr. DA RIVA\, Enrico (CERN)\n- DN 50 degassing flang
 e installation\n- standard flanges on brine side\n- news from HSE concerni
 ng design calculation\n- Welding Specification Procedure - Said\n\nhttp://
 indico.cern.ch/contributionDisplay.py?contribId=9&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=9&confId=183601
END:VEVENT
BEGIN:VEVENT
SUMMARY:Water circuit
DTSTART;VALUE=DATE-TIME:20120405T120000Z
DTEND;VALUE=DATE-TIME:20120405T121000Z
DTSTAMP;VALUE=DATE-TIME:20130524T004342Z
UID:indico-contribution-183601-8@cern.ch
DESCRIPTION:Speakers: MOCCIA\, Stefano (CERN)\nCheck of pipe skid (if need
 ed) integration - Stefano-Daniel\nIntegration of the water pipe\nCost esti
 mation for skid\nCost estimation for piping\n\nhttp://indico.cern.ch/contr
 ibutionDisplay.py?contribId=8&confId=183601
LOCATION:CERN 298-1-003
URL:http://indico.cern.ch/contributionDisplay.py?contribId=8&confId=183601
END:VEVENT
END:VCALENDAR