BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//CERN//INDICO//EN
BEGIN:VEVENT
SUMMARY:Requirements from the experiments
DTSTART;VALUE=DATE-TIME:20100120T130000Z
DTEND;VALUE=DATE-TIME:20100120T133000Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-24@cern.ch
DESCRIPTION:Speakers: FERRO-LUZZI\, Massimiliano (CERN)\nExpectations for 
 2010 in terms of integrated luminosity and energy. Physics potential given
  this.  Requirements in terms of beam intensity\, beam size and bunch conf
 iguration. Specific requests for special physics running conditions".\n\nT
 echnical stop and likely maintenance requirements through the year.\n\nhtt
 p://indico.cern.ch/contributionDisplay.py?contribId=24&sessionId=7&confId=
 76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=24&sessionId=7&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:2010 beam parameters\, machine performance to be reached in 2010
DTSTART;VALUE=DATE-TIME:20100120T133000Z
DTEND;VALUE=DATE-TIME:20100120T140000Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-26@cern.ch
DESCRIPTION:Speakers: Dr. GIOVANNOZZI\, Massimo (CERN)\nOutline of key bea
 m parameters for the 3.5 TeV run and possible increase in energy (transver
 se and longitudinal). Potential machine performance.\n\nRecall any optics 
 issues and constraints.\n\nhttp://indico.cern.ch/contributionDisplay.py?co
 ntribId=26&sessionId=7&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=26&sessionId=7&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:2010 commissioning plans
DTSTART;VALUE=DATE-TIME:20100120T140000Z
DTEND;VALUE=DATE-TIME:20100120T143000Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-27@cern.ch
DESCRIPTION:Speakers: LAMONT\, Mike (CERN)\nCunning plan for continued com
 missioning: ramp to 3.5 TeV\, squeeze\, collisions etc. Prerequisites for 
 going beyond the safe beam limit and approach to increasing the intensity.
  Schedule for 2010.\n\nhttp://indico.cern.ch/contributionDisplay.py?contri
 bId=27&sessionId=7&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=27&sessionId=7&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:How to improve operational efficiency ?
DTSTART;VALUE=DATE-TIME:20100120T103500Z
DTEND;VALUE=DATE-TIME:20100120T105500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-20@cern.ch
DESCRIPTION:Speakers: Dr. ALEMANY FERNANDEZ\, Reyes (CERN)\nsome keywords:
  Improving operational efficiency: sequencing\, procedures\, training\, RB
 AC\, testing\n\nhttp://indico.cern.ch/contributionDisplay.py?contribId=20&
 sessionId=6&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=20&sessionId=6&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Controls issues: CMW subscription\, RBAC set-up…
DTSTART;VALUE=DATE-TIME:20100120T105500Z
DTEND;VALUE=DATE-TIME:20100120T111500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-21@cern.ch
DESCRIPTION:Speakers: SLIWINSKI\, Wojtek ()\nhttp://indico.cern.ch/contrib
 utionDisplay.py?contribId=21&sessionId=6&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=21&sessionId=6&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:RF - performance & operational issues.
DTSTART;VALUE=DATE-TIME:20100120T111500Z
DTEND;VALUE=DATE-TIME:20100120T113500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-22@cern.ch
DESCRIPTION:Speakers: BUTTERWORTH\, Andrew (CERN)\nhttp://indico.cern.ch/c
 ontributionDisplay.py?contribId=22&sessionId=6&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=22&sessionId=6&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:General discussion
DTSTART;VALUE=DATE-TIME:20100120T113500Z
DTEND;VALUE=DATE-TIME:20100120T114500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-23@cern.ch
DESCRIPTION:Speakers: \nFeedback from operational experience- What can be 
 improved?\n\nhttp://indico.cern.ch/contributionDisplay.py?contribId=23&ses
 sionId=6&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=23&sessionId=6&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Wrap-up\, list of subjects to follow-up\, critical points… (tbc)
DTSTART;VALUE=DATE-TIME:20100120T143000Z
DTEND;VALUE=DATE-TIME:20100120T145000Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-28@cern.ch
DESCRIPTION:Speakers: COLLIER\, Paul (CERN)\nhttp://indico.cern.ch/contrib
 utionDisplay.py?contribId=28&sessionId=7&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=28&sessionId=7&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Concluding remarks (tbc)
DTSTART;VALUE=DATE-TIME:20100120T145000Z
DTEND;VALUE=DATE-TIME:20100120T150000Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-29@cern.ch
DESCRIPTION:Speakers: MYERS\, Steve (CERN)\nhttp://indico.cern.ch/contribu
 tionDisplay.py?contribId=29&sessionId=7&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=29&sessionId=7&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Ppbar experience including beam-beam and intrabeam scattering
DTSTART;VALUE=DATE-TIME:20100119T101500Z
DTEND;VALUE=DATE-TIME:20100119T103500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-40@cern.ch
DESCRIPTION:Speakers: EVANS\, Lyn (CERN)\nhttp://indico.cern.ch/contributi
 onDisplay.py?contribId=40&sessionId=0&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=40&sessionId=0&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHC optical model and necessary corrections  (aperture model\, tun
 e\, beta beat\, coupling\, chromaticity…)
DTSTART;VALUE=DATE-TIME:20100119T094500Z
DTEND;VALUE=DATE-TIME:20100119T101500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-1@cern.ch
DESCRIPTION:Speakers: TOMAS\, Rogelio (CERN)\nPerformance\, measurements v
 s. expectations\, problems encountered\, is related software sufficient\, 
 necessary improvements\, appropriate for 3.5TeV running?\n\nhttp://indico.
 cern.ch/contributionDisplay.py?contribId=1&sessionId=0&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=1&sessionId=0&c
 onfId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Review of LHC operation : performance vs expectation\, issues\, ne
 cessary improvements?
DTSTART;VALUE=DATE-TIME:20100119T091500Z
DTEND;VALUE=DATE-TIME:20100119T094500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-0@cern.ch
DESCRIPTION:Speakers: LAMONT\, Mike (CERN)\nhttp://indico.cern.ch/contribu
 tionDisplay.py?contribId=0&sessionId=0&confId=76921
LOCATION:CERN
URL:http://indico.cern.ch/contributionDisplay.py?contribId=0&sessionId=0&c
 onfId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHC Injection and Transfer lines
DTSTART;VALUE=DATE-TIME:20100119T110500Z
DTEND;VALUE=DATE-TIME:20100119T112500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-3@cern.ch
DESCRIPTION:Speakers: MEDDAHI\, Malika (CERN)\nPerformance\, measurements 
 vs. expectations\, problems encountered\, is related software sufficient\,
  necessary improvements\, appropriate for 3.5TeV running?\n\nhttp://indico
 .cern.ch/contributionDisplay.py?contribId=3&sessionId=0&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=3&sessionId=0&c
 onfId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:LHC beam behaviour (parameters\, beam-beam\, lifetime\, expectatio
 n and observation)
DTSTART;VALUE=DATE-TIME:20100119T104500Z
DTEND;VALUE=DATE-TIME:20100119T110500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-2@cern.ch
DESCRIPTION:Speakers: HERR\, Werner (CERN)\nPerformance\, measurements vs.
  expectations\, problems encountered\, is related software sufficient\, ne
 cessary improvements\, appropriate for 3.5TeV running?\n\nhttp://indico.ce
 rn.ch/contributionDisplay.py?contribId=2&sessionId=0&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=2&sessionId=0&c
 onfId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Discussion
DTSTART;VALUE=DATE-TIME:20100119T112500Z
DTEND;VALUE=DATE-TIME:20100119T113500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-5@cern.ch
DESCRIPTION:Speakers: \nhttp://indico.cern.ch/contributionDisplay.py?contr
 ibId=5&sessionId=0&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=5&sessionId=0&c
 onfId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Collimators and beam cleaning: first results and future plans
DTSTART;VALUE=DATE-TIME:20100120T081500Z
DTEND;VALUE=DATE-TIME:20100120T083500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-7@cern.ch
DESCRIPTION:Speakers: BRACCO\, Chiara (Ecole Polytechnique Federale Lausan
 ne (EPFL))\nThe LHC collimation system has been used for beam cleaning and
  passive machine protection this year for the first time. The hardware com
 missioning tests carried out in preparation for operations with beam are p
 resented. Setup procedure towards nominal injection settings is analyzed t
 ogether with reproducibility and total beam time spent for collimator setu
 p. Locations of beam losses are reviewed and reasons for the highest losse
 s investigated. The achieved cleaning efficiency is also discussed. Operat
 ional performance and stability of the system\, interlock thresholds and i
 nterlock statistics (number of false interlocks generated) are treated. So
 ftware procedures\, settings and threshold limits are analyzed\, also in v
 iew of machine protection. Finally\, plans for higher intensity operation 
 and improvements (both on a short and long term) are presented.\n\nhttp://
 indico.cern.ch/contributionDisplay.py?contribId=7&sessionId=3&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=7&sessionId=3&c
 onfId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:BIS - BIC - SMP
DTSTART;VALUE=DATE-TIME:20100120T080000Z
DTEND;VALUE=DATE-TIME:20100120T081500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-6@cern.ch
DESCRIPTION:Speakers: Dr. TODD\, Benjamin (CERN)\nThe Beam Interlock Syste
 m (BIS) and Safe Machine Parameters (SMP) system are central to the protec
 tion of the Large Hadron Collider (LHC) machine.\nThe BIS has been critica
 l for the safe operation of LHC from the first day of operation. It has be
 en installed and commissioned\, only minor enhancements are required in or
 der to accommodate all future LHC machine protection requirements.\nAt red
 uced intensity\, the SMP system is less critical for LHC operation. As suc
 h\, the current system satisfies the 2010 operational requirements. Furthe
 r developments are required\, both at the SMP Controller level\, and at th
 e system level\, in order to accommodate the requirements of the LHC beyon
 d 2010\n\nhttp://indico.cern.ch/contributionDisplay.py?contribId=6&session
 Id=3&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=6&sessionId=3&c
 onfId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Beam Dump Systems and Abort Gap Cleaning
DTSTART;VALUE=DATE-TIME:20100120T083500Z
DTEND;VALUE=DATE-TIME:20100120T085000Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-9@cern.ch
DESCRIPTION:Speakers: Dr. UYTHOVEN\, Jan (CERN)\nThe performance of the be
 am dumping systems and the abort gap cleaning are reviewed in the context 
 of the general machine protection system. Details of the commissioning exp
 erience and setting up\, encountered equipment problems\, the experience w
 ith and status of the eXternal Post Operational Checks (XPOC) and the impo
 rtance of operational procedures are presented for the beam dumping system
 . The brief experience with the abort gap cleaning is also presented. \n\n
 Plans for 2010 commissioning\, allowing for higher beam intensity and ener
 gy\, are given for both systems including some thoughts on the operational
  procedures required.\n\nhttp://indico.cern.ch/contributionDisplay.py?cont
 ribId=9&sessionId=3&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=9&sessionId=3&c
 onfId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:General discussion: Feedback from operational experience- What can
  be improved?
DTSTART;VALUE=DATE-TIME:20100119T145000Z
DTEND;VALUE=DATE-TIME:20100119T150500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-39@cern.ch
DESCRIPTION:Speakers: \nhttp://indico.cern.ch/contributionDisplay.py?contr
 ibId=39&sessionId=5&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=39&sessionId=5&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Ramp: experience and issues\, incl. MP
DTSTART;VALUE=DATE-TIME:20100119T153000Z
DTEND;VALUE=DATE-TIME:20100119T155500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-12@cern.ch
DESCRIPTION:Speakers: VENTURINI DELSOLARO\, Walter (CERN)\n- Performance\,
  observations\, problems encountered\n- Losses and transmission: estrapola
 tion for higher intensities?\n- Feed-forward vs. feedback: orbit\, tune\, 
 chroma\n- Setting incorporation for various systems: tune\, chroma\, ... R
 F\, collimators\n- Is related software sufficient\, necessary improvements
 \, appropriate for 3.5TeV running?\n\nhttp://indico.cern.ch/contributionDi
 splay.py?contribId=12&sessionId=4&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=12&sessionId=4&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:General discussion
DTSTART;VALUE=DATE-TIME:20100120T093000Z
DTEND;VALUE=DATE-TIME:20100120T094500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-11@cern.ch
DESCRIPTION:Speakers: \nMore feedback from operational experience- What ca
 n be improved?\n\nhttp://indico.cern.ch/contributionDisplay.py?contribId=1
 1&sessionId=3&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=11&sessionId=3&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Injection and dump protection
DTSTART;VALUE=DATE-TIME:20100120T085000Z
DTEND;VALUE=DATE-TIME:20100120T091000Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-10@cern.ch
DESCRIPTION:Speakers: BARTMANN\, Wolfgang ()\nResults will be shown from t
 he low-intensity beam commissioning of first\, the moveable injection prot
 ection devices in the SPS to LHC transfer lines and downstream of the LHC 
 injection kicker and second\, the LHC dump protection elements in IR6.\n\n
 The implications of these results and a commissioning status report with t
 he further planning will be addressed.\n\nhttp://indico.cern.ch/contributi
 onDisplay.py?contribId=10&sessionId=3&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=10&sessionId=3&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Squeeze: strategy and issues\, incl. MP
DTSTART;VALUE=DATE-TIME:20100119T155500Z
DTEND;VALUE=DATE-TIME:20100119T161500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-13@cern.ch
DESCRIPTION:Speakers: Dr. REDAELLI\, Stefano (CERN)\n- Performance\, obser
 vations\, problems encountered\n- Review optics requirements for 2010 in a
 ll points\n- Commissioning base-line and possible issues\n- Settings of pr
 otection devices\n- Is related software sufficient\, necessary improvement
 s\, appropriate for 3.5TeV running?\n\nhttp://indico.cern.ch/contributionD
 isplay.py?contribId=13&sessionId=4&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=13&sessionId=4&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Luminosity optimisation
DTSTART;VALUE=DATE-TIME:20100119T143500Z
DTEND;VALUE=DATE-TIME:20100119T145000Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-38@cern.ch
DESCRIPTION:Speakers: WHITE\, Simon Mathieu (Universite de Paris-Sud (Pari
 s XI)-Unknown-Unknown)\nhttp://indico.cern.ch/contributionDisplay.py?contr
 ibId=38&sessionId=5&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=38&sessionId=5&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Updated magnetic model for ramp and squeeze
DTSTART;VALUE=DATE-TIME:20100119T163500Z
DTEND;VALUE=DATE-TIME:20100119T165500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-15@cern.ch
DESCRIPTION:Speakers: Dr. TODESCO\, Ezio (CERN)\n- Revise estimates and re
 quirements for operation at higher energies\n- Model for decay and snap-ba
 ck\n- LSA implementation is adequate?\n- Additional measurement program to
  update the model\n\nhttp://indico.cern.ch/contributionDisplay.py?contribI
 d=15&sessionId=4&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=15&sessionId=4&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Separation and crossing scheme\, minimum beta star
DTSTART;VALUE=DATE-TIME:20100119T161500Z
DTEND;VALUE=DATE-TIME:20100119T163500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-14@cern.ch
DESCRIPTION:Speakers: HERR\, Werner (CERN)\n- Results from first operation
 \, news for 2010.\n- Performance\, measurements vs. expectations (improvem
 ents of online model)\n- Strategy to bring up luminosity performance\n- Op
 timized behaviour vs energy and beta* -> How to handle this in LSA\n- Prob
 lems encountered\, is related software sufficient\, necessary improvements
 \, appropriate for 3.5TeV running?\n\nhttp://indico.cern.ch/contributionDi
 splay.py?contribId=14&sessionId=4&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=14&sessionId=4&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:General discussion
DTSTART;VALUE=DATE-TIME:20100119T171500Z
DTEND;VALUE=DATE-TIME:20100119T173000Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-17@cern.ch
DESCRIPTION:Speakers: \nFeedback from operational experience- What can be 
 improved?\n\nhttp://indico.cern.ch/contributionDisplay.py?contribId=17&ses
 sionId=4&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=17&sessionId=4&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Lessons from Physics Runs
DTSTART;VALUE=DATE-TIME:20100119T165500Z
DTEND;VALUE=DATE-TIME:20100119T171500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-16@cern.ch
DESCRIPTION:Speakers: FERRO-LUZZI\, Massimiliano (CERN)\n- Experimental co
 nditions\n- Integration of experiment magnets\n- Ramp strategy for spectro
 meters\n- Experience with the handshake\n- Requests\, suggestions?\n\nhttp
 ://indico.cern.ch/contributionDisplay.py?contribId=16&sessionId=4&confId=7
 6921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=16&sessionId=4&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:What are the weak points of operation?
DTSTART;VALUE=DATE-TIME:20100120T101500Z
DTEND;VALUE=DATE-TIME:20100120T103500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-19@cern.ch
DESCRIPTION:Speakers: Dr. GODDARD\, Brennan (CERN)\nsome  keywords:  Impro
 ving rigor: procedures\, checks\, releases\, testing\, RBAC..\n\nhttp://in
 dico.cern.ch/contributionDisplay.py?contribId=19&sessionId=6&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=19&sessionId=6&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Overall MP and operation and scaling to 2010
DTSTART;VALUE=DATE-TIME:20100120T091000Z
DTEND;VALUE=DATE-TIME:20100120T093000Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-18@cern.ch
DESCRIPTION:Speakers: Dr. WENNINGER\, Jorg (CERN)\nPerformance\, measureme
 nts vs. expectations\, problems encountered\, is related software sufficie
 nt\, necessary improvements\, appropriate for 3.5TeV running?\n\nhttp://in
 dico.cern.ch/contributionDisplay.py?contribId=18&sessionId=3&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=18&sessionId=3&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Profile monitors\, BSRA\, BSRT\, Injection matching monitor
DTSTART;VALUE=DATE-TIME:20100119T141500Z
DTEND;VALUE=DATE-TIME:20100119T143500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-37@cern.ch
DESCRIPTION:Speakers: LEFEVRE\, Thibaut (CERN)\nhttp://indico.cern.ch/cont
 ributionDisplay.py?contribId=37&sessionId=5&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=37&sessionId=5&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Beam loss monitor system
DTSTART;VALUE=DATE-TIME:20100119T134500Z
DTEND;VALUE=DATE-TIME:20100119T140500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-36@cern.ch
DESCRIPTION:Speakers: Dr. ZAMANTZAS\, Christos (CERN)\nPerformance\, measu
 rements vs. expectations\, problems encountered\, is related software suff
 icient\, necessary improvements\, appropriate for 3.5TeV running?\n\nhttp:
 //indico.cern.ch/contributionDisplay.py?contribId=36&sessionId=5&confId=76
 921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=36&sessionId=5&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Tune\, chromaticity\, feed forward / Feed back
DTSTART;VALUE=DATE-TIME:20100119T132000Z
DTEND;VALUE=DATE-TIME:20100119T134500Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-35@cern.ch
DESCRIPTION:Speakers: STEINHAGEN\, Ralph (AB/OP)\, GASIOR\, Marek (CERN)\n
 Performance of tune\, chromaticity and coupling measurement system (BBQ an
 d PLL). Status of feedbacks.\n\nObservations of unexpected features in tun
 e spectra (8 kHz\, modulation\, "the hump").\n\nhttp://indico.cern.ch/cont
 ributionDisplay.py?contribId=35&sessionId=5&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=35&sessionId=5&
 confId=76921
END:VEVENT
BEGIN:VEVENT
SUMMARY:Orbit system\, incl. feedback\, stability
DTSTART;VALUE=DATE-TIME:20100119T130000Z
DTEND;VALUE=DATE-TIME:20100119T132000Z
DTSTAMP;VALUE=DATE-TIME:20130520T090025Z
UID:indico-contribution-76921-34@cern.ch
DESCRIPTION:Speakers: FUCHSBERGER\, Kajetan ()\nhttp://indico.cern.ch/cont
 ributionDisplay.py?contribId=34&sessionId=5&confId=76921
LOCATION:Hilton and Palais Lumière (EVIAN)
URL:http://indico.cern.ch/contributionDisplay.py?contribId=34&sessionId=5&
 confId=76921
END:VEVENT
END:VCALENDAR
