SUMMARY:ILC Mechanical & Electrical Review and CFS Baseline Technical Revi
 ew
DTSTART;VALUE=DATE-TIME:20120321T080000Z
DTEND;VALUE=DATE-TIME:20120323T170000Z
DTSTAMP;VALUE=DATE-TIME:20130524T180105Z
UID:indico-event-165201@cern.ch
DESCRIPTION:OVERVIEW \n\nThe first day of this meeting\, March 21st 2012\,
  will be dedicated to a Technical Review of ILC Electrical and Mechanical 
 Systems in the Americas and Asia. This review will be conducted by an inde
 pendent panel of engineers from the CERN laboratory.   Representatives fro
 m the Asian Region will present the  Mechanical and Electrical Designs tha
 t have been developed using the Asian Region HLFR system suitable for a mo
 untain site in Japan.  Representatives from the Americas Region will prese
 nt the Mechanical and Electrical Designs that have been developed using th
 e Klystron Cluster RF system suitable for the Americas Sample Site.  Ample
  time will be available in the agenda for open discussion among all partic
 ipants.  The Review Panel will produce a report to the GDE Project Managem
 ent that records panel impression and comments of the designs presented as
  well as conclusions reached during discussion periods.\n\nThe review pane
 l will consist of:\n\nMarc Ross (Fermilab – ILC) Chair\nVic Kuchler (Fer
 milab – ILC)\nJohn Osborne (CERN – ILC) Host\nAtsushi Enomoto (KEK –
  ILC)\nPhilippe Lebrun (CERN)\nMauro Nonis (CERN HVAC Group Leader)\nFranc
 ois Duval (CERN EL Group Leader)\n\n\nDays 2&3\, 22-23 March 2012 is for T
 he fourth Baseline Technical Review (BTR)\,  which will focus on Conventio
 nal Facilities and Siting. All changes made to the CFS 2007 Reference Desi
 gn during the Technical Design Phase are to be presented by the CFS Techni
 cal Group for review by the GDE Project Manager Review team. Each change w
 ill be evaluated on the basis of performance\, cost and impact on related 
 systems. The Review team will produce a report to the GDE covering content
 \, findings and decisions made at the BTR. \n\nIt is expected that the CFS
  BTR will be the last BTR leading up to the Technical Design Report. It re
 presents the culmination of the Accelerator System and Main Linac Technolo
 gy Baseline Technical Reviews held in the last 9 months. Each of the earli
 er BTR's included statements of impact on CFS. It is important to identify
  and summarize these at the final BTR. \n\nAlso\, as the final BTR\, any o
 utstanding system-wide changes that have not already been properly complet
 ed should be presented and reviewed. The list of such changes will be draf
 ted by the Project Managers\, Cost Engineers and Technical Area Groups and
  may include\, for example\, path-length related topics.\n\nhttp://indico.
 cern.ch/conferenceDisplay.py?confId=165201