BE-CO Technical Committee

Status report on OpenCBCM project

by Ignacio Vilches Calvo (Universidad de Oviedo (ES)), Xavier Piroux, Jean-Claude Bau (CERN)

Thursday, 24 May 2012 from to (Europe/Zurich)
at CERN ( 864-1-C02 )
Description Introduction (Jean-Claude Bau) 10'

OpenCBCM integration in LSA (Ignacio Vilches Calvo), 30'.

The sequence Editor and Manager are tools allowing Operators to edit timing sequences and to generate the corresponding hardware settings. The system will be fully integrated in LSA. LSA shall store sequences and settings in its data base and provide a client API for the Timing GUIs to access the data. The sequence editor belongs to the new Open Central Beam and Cycle Manager (OCBCM) and is part of the larger effort of renovating the control system of the LHC injectors.

OpenCBCM - Distributed Timing in front-end computers (Xavier Piroux), 20'
The distributed Timing in front-end computer is a work-package of the OpenCBCM project. Since it was presented in a previous TC, the project has evolved so we would like you to keep tabs on what we have done.We will talk about the compatibility with current timing system and the integration with FESA. Finally, we would like explain were are we now and what is the scheduled of the project (deadlines).
Material:
Slides pdf filedown arrow