Thermosiphon meeting

chaired by Michele Battistin (CERN)
Thursday, 5 April 2012 from to (Europe/Zurich)
at CERN ( 298-1-003 )
Go to day
  • Thursday, 5 April 2012
    • 14:00 - 14:10 Water circuit 10'
      Check of pipe skid (if needed) integration - Stefano-Daniel
      Integration of the water pipe
      Cost estimation for skid
      Cost estimation for piping
      
      Speaker: Stefano Moccia (CERN)
    • 14:10 - 14:20 Control: Functional Analysis of Chiller, Water and Brine circuits 10'
      Comments from the second version Lukasz has delivered. 
      Comment to the synoptics Lukasz has finalised with Vinod.
      Any feed-backs from J&E Hall after their remote access?
      Speaker: Lukasz Zwalinski (CERN)
    • 14:20 - 14:30 Diesel Power supply situation 10'
      - results of the discussions with ATLAD ID
      - schematics of power supply strategy in case of power cut - magnet failure
      Speaker: Wieslaw Iwanski (CERN)
    • 14:30 - 14:40 TS electrical cupboards construction planning 10'
      Electrical study (Florian)
      List of components and detailed cost list (Florian)
      Work planning (Florian)
      Speaker: Florian Corbaz (CERN)
    • 14:40 - 14:50 Electrical Cabling 10'
      Cost of the cabling between SU and SX
      Connection path between SX and SH and SU
      Connection length estimation: list of cable dimensions and length for the order
      - Jan and Sergei M. contact for cabling (Juri and Michail) 
      Speaker: Daniel Lefils (CERN)
    • 14:50 - 15:00 2 kW Thermosiphon Tests 10'
      - problems on the Julabo: report
      - minimum temperature reached.
      - stability
      - water-hammer effect feed-back
      Speaker: Jose Antonio Botelho Direito (CERN)
      Material: Slides powerpoint file pdf file
    • 15:00 - 15:10 C3F8 pipe installation update 10'
      - compensator installation procedure
      - spring installation
      - wooden support for pipe to be replaced
      - Support lay-out 3D and 2D
      - Support G06
      - Spacer on the supports sometimes are missing
      - Review the supporting in SDX1 area
      Speaker: Daniel Lefils (CERN)
    • 15:10 - 15:20 Integration: USA15 - roof 10'
      USA15 integration: where to pass the pipes
      Roof integration: advancement drawings
      support to Sylwia Wojnarska
      Speaker: Pierre Bonneau (CERN)
      Material: Slides pdf file
    • 15:20 - 15:30 Dummy load HEX problem 10'
      Offers from suppliers for right size
      Safety problem related to 500 kg of glycole - pending
      Speakers: Jose Antonio Botelho Direito (CERN), Dr. Enrico Da Riva (CERN)
    • 15:30 - 15:40 Swap between TS and compressors 10'
      Functional analysis idea
      P&I impact
      Speakers: Pierre Bonneau (CERN), Stephane Berry (CERN)
      Material: Slides pdf filedown arrow
    • 15:40 - 15:50 Condenser contract 10'
      - DN 50 degassing flange installation
      - standard flanges on brine side
      - news from HSE concerning design calculation
      - Welding Specification Procedure - Said
      Speaker: Dr. Enrico Da Riva (CERN)
    • 15:50 - 16:00 Brine skid construction drawings 10'
      Advancement status
      Kirill to provide a planning. 
      Speaker: Kirill Egorov (Indiana University (US))
      Material: Slides pdf file
    • 16:00 - 16:10 Mechanical construction 10'
      Advancement status
      Speakers: Pierre Bonneau (CERN), Konrad Gugula (Polish Academy of Sciences (PL))
    • 16:10 - 16:20 Safety file 10'
      Speaker: Jose Antonio Botelho Direito (CERN)
    • 16:20 - 16:30 Any Other Business 10'