EUDET/LCTPC electronics meeting

Thursday, 21 August 2008 from to (Europe/Zurich)
at CERN ( 4-1-021 )
Description
For the telephone conference: Please phone +41 22 767 7000 and request the phone conference for LCTPC organised by L. Linssen.
Material:
Go to day
  • Thursday, 21 August 2008
    • 16:00 - 16:05 Status of the remaining 800 PCA16 preamp chips (pupose: produce a time schedule) 5'
    • 16:05 - 16:15 Status of mounting the 40 MHz ALTRO's onto the FEC 10'
    • 16:15 - 16:25 Test results of the first 200 PCA16 preamp chips (purpose: decide on performance limits for acceptance) 10'
    • 16:25 - 16:35 Results of the FEC system tests (version 2) (purpose: decide whether reference voltages of ALTRO fixed/variable) 10'
      Material: Slides pdf filedown arrow more information pdf file
    • 16:35 - 16:45 Status of readout units (RCU, SIU, DCS and DRORC) and of firmware needed for >10MHz readout 10'
    • 16:45 - 16:55 Status of the distributor box, integration with beam trigger, and distribution of 40 MHz clock to RCU's 10'
      Material: Slides pdf file
    • 16:55 - 17:05 Mechanics and first impressions from cooling tests 10'
      Material: Slides pdf file