There is a Mobile version of Indico. Would you like to try it?
Yes
Not now
Filter
iCal export
Event calendar file
I have read and understood the above.
I have read and understood the above.
Download current event:
Event calendar file
In order to enable an iCal export link, your account needs to have a key created. This key enables other applications to access data from within Indico even when you are neither using nor logged into the Indico system yourself with the link provided. Once created, you can manage your key at any time by going to 'My Profile' and looking under the tab entitled 'HTTP API'. Further information about HTTP API keys can be found in the Indico documentation.
In conjunction with a having a key associated with your account, to have the possibility of exporting private event information necessitates the creation of a persistent key. This new key is also associated with your account and whilst it is active the data which can be obtained through using this key can be obtained by anyone in possession of the link provided. Due to this reason, it is extremely important that you keep links generated with this key private and for your use only. If you think someone else may have acquired access to a link using this key in the future, you must immediately remove it from 'My Profile' under the 'HTTP API' tab and generate a new key before regenerating iCalendar links.
Permanent link for public information only:
Permanent link for all public and protected information:
Please use CTRL + C to copy this URL
Detailed timetable
More
JRA1 All Hands Meeting
chaired by Frederic Hemmer
from
to
(Europe/Zurich)
at PADOVA
at PADOVA
| Description |
More details on the logistics can be found at http://www.pd.infn.it/grid/jra1meeting/ Potential topics:
|
| Material: |
Go to day
-
-
13:30 - 14:30
Opening
Convener: Frederic Hemmer -
13:30
Opening
10'
Speaker: Frederic Hemmer Material: transparencies
-
13:40
Welcome and Logistics
15'
Speaker: local organizers Material: transparencies
-
13:55
Action review from last all-hands meeting
35'
Speaker: Erwin Laure Material: more information
transparencies
-
13:30
Opening
10'
-
14:30 - 18:00
Integration session
Convener: Alberto Di Meglio -
14:30
The Build System and the Release Process
30'
Update on the build infrastructure status and an open discussion about the software release process, missing tools and functionality, packaging requirements (SA1 requiements?) and other open issues
Speaker: Marian Zurek (CERN) Material: more information 
transparencies
-
15:00
gLite Configuration Overview
20'
A general introduction to the proposed gLite configuration guidelines
Speaker: Joachim Flammer (CERN) Material: more information
transparencies
-
15:20
Configuration Schemas and Service Configurators
40'
A presentation of the details of the proposed configuration schemas and the service configurator design for services and clients.
Speaker: Robert Harakaly (CERN) Material: more information 

transparencies
- 16:00 coffee 30'
-
16:30
The Data Management Service Configurator
30'
A demo of an implementation of the service configurator pattern for Linux daemons applied to the gLite I/O Server and Client
Speaker: Paolo Badino (CERN) Material: transparencies
-
17:00
Java Web Services Configuration with JMX
40'
A presentation of a model for Java Web Services configuration and management using JMX. It consists of a presentation of the technology, the possible implementation models and the available tools (SUN, IBM, HP), followed by a demo of dynamic configuration
Speaker: Joachim Flammer (CERN) Material: more information
transparencies

-
17:40
Discussion
20'
Open discussion and questions to the ITeam, requirments and AOB
Speaker: Everybody
-
14:30
The Build System and the Release Process
30'
-
13:30 - 14:30
Opening
-
-
09:00 - 11:00
Information System
Convener: Steve Fisher -
09:00
Services, Services Discovery and Service Status
25'
This will explain the thinking behind the Site, Service and ServiceStatus tables and show to use them. It will also address the issue of a specific API. This will include a brief hands on session
Speaker: Craig, M and Wilson, A J (RAL) Material: transparencies
-
09:25
Multiple VO Support
20'
Support of multiple VOs will be available soon. This session will explore the consequences of this.
Speaker: Byrom, R (RAL) Material: transparencies
-
09:45
GLUE
45'
Speaker: -
GLUE Version 1.2
20'
Speaker: Andreozzi, S (INFN-CNAF) Material: more information
transparencies
-
Comments on GLUE Schema
5'
Speaker: Kunszt, P (CERN) Material: transparencies
-
More comments on GLUE
5'
Speaker: Fisher, SM (RAL) Material: transparencies
-
Discussion
15'
Speaker:
-
GLUE Version 1.2
20'
- 10:30 coffee 30'
-
09:00
Services, Services Discovery and Service Status
25'
-
11:00 - 11:30
Integration of Package Manager
How will the PM interact with the WMS and DM tools and vice versa.
Convener: Predrag Buncic -
11:00
gLite Package Manager
15'
Speaker: Buncic, Predrag (CERN) Material: transparencies
-
11:00
gLite Package Manager
15'
-
11:30 - 14:00
Advance reservation - interaction with JRA4
1. Architecture overview 2. Use cases: network and storage reservation and allocation 3. Information services: schema extensions? 3. Deliverable DJRA4.1 ("Specification of interfaces for bandwidth reservation service"): overview and issues 4. Data management: what support for storage advance reservation? 5. Code development roadmapConvener: Francesco Prelz -
11:30
Overview on Advance Reservation framework.
30'
Speaker: Tiziana Ferrari (INFN CNAF) Material: transparencies
- 12:30 Lunch 1h30'
-
11:30
Overview on Advance Reservation framework.
30'
-
14:00 - 18:00
Security session
Convener: Ake Edlund Material: Minutes
-
14:00
VOMS
30'
Speaker: Joni Hakala, Valerio Venturi Material: more information
transparencies

-
14:45
Discussion
15'
Speaker: -
15:00
Site access control issues (a sneak preview of DJRA3.2)
30'
Speaker: Martijn Steenbakkers Material: transparencies
-
15:30
The software formerly known as the Site Proxy
30'
Speaker: Oscar Koeroo Material: transparencies
- 16:00 coffee 30'
-
16:15
Security in DM
45'
Speaker: Akos Frohner Material: transparencies
-
17:00
Discussion
15'
Speaker: -
17:15
List of issues
30'
So far the list looks like this: - grid usernames, EGEE short term approach (Joni) - security for streaming (Steve Hicks,non-blocking java, RMGA requirement?) - c/c++ communication security not solved by Grid site. (Daniel Kouril, goal to understand their solution, what other solutions there are and to minimize the number of different solutions). - GPBOX - more?
Speaker: All Material: transparencies
-
17:45
Discussion
15'
Speaker:
-
14:00
VOMS
30'
-
09:00 - 11:00
Information System
-
-
09:00 - 10:30
DM & WMS interaction
Convener: Peter Kunszt -
09:00
Current JDL parameters for Data Management
10'
Speaker: Fabrizio Pacini (Datamat) Material: more information
transparencies
-
09:10
StorageIndex
15'
The StorageIndex interface is being used by the WMS to locate the files given in the JDL.
Speaker: Krzysztof Nienartowicz (CERN) Material: transparencies
-
09:25
Information System: Relationships of WM and DM services
25'
In this talk all the information system parameters that are necessary to actually perform the interaction between the DM and WM systems are revisited and exposed - to be eyed very cautiously by the audience.
Speaker: Ricardo Brito da Rocha (CERN) Material: transparencies
-
09:50
BrokerInfo usage in gLite and evolution
40'
Here we will discuss how the functionality currently filled by the brokerinfo is being taken over by other services in gLite. (or not.)
Speaker: discussion
-
09:00
Current JDL parameters for Data Management
10'
-
10:30 - 12:30
Testing Session
Convener: Leanne Guy - 10:30 coffee 15'
-
10:45
Overview of testing and the testbed infrastructure
15'
The current state of the distributed testbed will be presented for all testing sites. The procedure to install and update glite components on the tested wil be described
Speaker: Leanne Guy (CERN) Material: more information
transparencies
-
11:00
Testing framework
15'
A demonstration of the QMTest framework in use on the testbed with existing test suites
Speaker: David Collados (CERN) Material: more information
-
11:15
Workload management system testing
20'
A presentation of what exists and further testing planned.
Speaker: Mario Reale (CERN) Material: transparencies
-
11:35
Data management testing
20'
A presentation of what exists already and what further testing is planned
Speaker: David Collados (CERN) Material: more information
-
12:00
Security testing
15'
Presentation of plans for security testing.
Speaker: Leanne Guy (CERN) Material: more information
transparencies
-
12:15
R-GMA testing
15'
Current plans for R-GMA testing
Speaker: Leanne Guy (CERN) Material: transparencies
-
12:30 - 13:00
Wrap-up
Convener: Erwin Laure Material: transparencies
-
09:00 - 10:30
DM & WMS interaction

Share this page
Social networks
Calendaring