3-5 May 2012
INFN Pisa
Europe/Paris timezone
Interconnect issues for the CMS 3-D track trigger
Presented by Prof. Mani TRIPATHI
on
3 May 2012
from
20:00
to
21:00
Session:
Posters
Content
The 3-D track trigger concept being developed for the CMS upgrade involves interconnections for signals to be transmitted between various layers of sensors and readout electronics. In this design, the two sensitive layers are separated by an interposer, which provides the lever arm for measuring transverse momenta. Such an assembly would require new challenges for bump-bonding of large arrays. Progress in various techniques being investigated for this purpose will be presented. Sequential bump-bonding steps using solders with different melting points will be described. Plans for achieving high yields in assembly will be discussed.
Place
Location: INFN Pisa
Address: Largo Bruno Pontecorvo 3
56127 Pisa
Italy
Room:
Event calendar file