Displaying 37
contributions
out of
37
Session:
Session 6: 2010 operation
Outline of key beam parameters for the 3.5 TeV run and possible increase in energy (transverse and longitudinal). Potential machine performance.
Recall any optics issues and constraints.
Presented by Dr. Massimo GIOVANNOZZI
on
20 Jan 2010
at
14:30
Session:
Session 6: 2010 operation
Cunning plan for continued commissioning: ramp to 3.5 TeV, squeeze, collisions etc. Prerequisites for going beyond the safe beam limit and approach to increasing the intensity. Schedule for 2010.
Presented by Mike LAMONT
on
20 Jan 2010
at
15:00
The Beam Interlock System (BIS) and Safe Machine Parameters (SMP) system are central to the protection of the Large Hadron Collider (LHC) machine.
The BIS has been critical for the safe operation of LHC from the first day of operation. It has been installed and commissioned, only minor enhancements are required in order to accommodate all future LHC machine protection requirements.
At reduced in
... More
Presented by Dr. Benjamin TODD
on
20 Jan 2010
at
09:00
The performance of the beam dumping systems and the abort gap cleaning are reviewed in the context of the general machine protection system. Details of the commissioning experience and setting up, encountered equipment problems, the experience with and status of the eXternal Post Operational Checks (XPOC) and the importance of operational procedures are presented for the beam dumping system. The b
... More
Presented by Dr. Jan UYTHOVEN
on
20 Jan 2010
at
09:35
Performance, measurements vs. expectations, problems encountered, is related software sufficient, necessary improvements, appropriate for 3.5TeV running?
Presented by Mariusz SAPINSKI
Session:
Session 2 : Beam diagnostics
Performance, measurements vs. expectations, problems encountered, is related software sufficient, necessary improvements, appropriate for 3.5TeV running?
Presented by Dr. Christos ZAMANTZAS
on
19 Jan 2010
at
14:45
The LHC collimation system has been used for beam cleaning and passive machine protection this year for the first time. The hardware commissioning tests carried out in preparation for operations with beam are presented. Setup procedure towards nominal injection settings is analyzed together with reproducibility and total beam time spent for collimator setup. Locations of beam losses are reviewed a
... More
Presented by Chiara BRACCO
on
20 Jan 2010
at
09:15
Session:
Session 5 : Controls and operational aspects: going from commissioning to operational regime
Presented by Wojtek SLIWINSKI
on
20 Jan 2010
at
11:55
on
19 Jan 2010
at
12:25
Session:
Session 5 : Controls and operational aspects: going from commissioning to operational regime
Feedback from operational experience- What can be improved?
on
20 Jan 2010
at
12:35
More feedback from operational experience- What can be improved?
on
20 Jan 2010
at
10:30
Feedback from operational experience- What can be improved?
on
19 Jan 2010
at
18:15
Session:
Session 5 : Controls and operational aspects: going from commissioning to operational regime
some keywords: Improving operational efficiency: sequencing, procedures, training, RBAC, testing
Presented by Dr. Reyes ALEMANY FERNANDEZ
on
20 Jan 2010
at
11:35
Results will be shown from the low-intensity beam commissioning of first, the moveable injection protection devices in the SPS to LHC transfer lines and downstream of the LHC injection kicker and second, the LHC dump protection elements in IR6.
The implications of these results and a commissioning status report with the further planning will be addressed.
Presented by Wolfgang BARTMANN
on
20 Jan 2010
at
09:50
Performance, measurements vs. expectations, problems encountered, is related software sufficient, necessary improvements, appropriate for 3.5TeV running?
Presented by Malika MEDDAHI
on
19 Jan 2010
at
12:05
Performance, measurements vs. expectations, problems encountered, is related software sufficient, necessary improvements, appropriate for 3.5TeV running?
Presented by Werner HERR
on
19 Jan 2010
at
11:45
Performance, measurements vs. expectations, problems encountered, is related software sufficient, necessary improvements, appropriate for 3.5TeV running?
Presented by Rogelio TOMAS
on
19 Jan 2010
at
10:45
- Experimental conditions
- Integration of experiment magnets
- Ramp strategy for spectrometers
- Experience with the handshake
- Requests, suggestions?
Presented by Massimiliano FERRO-LUZZI
on
19 Jan 2010
at
17:55
Performance, measurements vs. expectations, problems encountered, is related software sufficient, necessary improvements, appropriate for 3.5TeV running?
Presented by Dr. Ezio TODESCO
Performance, measurements vs. expectations, problems encountered, is related software sufficient, necessary improvements, appropriate for 3.5TeV running?
Presented by Dr. Jorg WENNINGER
on
20 Jan 2010
at
10:10
Presented by Lyn EVANS
on
19 Jan 2010
at
11:15
Session:
Session 5 : Controls and operational aspects: going from commissioning to operational regime
Presented by Andrew BUTTERWORTH
on
20 Jan 2010
at
12:15
- Performance, observations, problems encountered
- Losses and transmission: estrapolation for higher intensities?
- Feed-forward vs. feedback: orbit, tune, chroma
- Setting incorporation for various systems: tune, chroma, ... RF, collimators
- Is related software sufficient, necessary improvements, appropriate for 3.5TeV running?
Presented by Walter VENTURINI DELSOLARO
on
19 Jan 2010
at
16:30
Session:
Session 6: 2010 operation
Expectations for 2010 in terms of integrated luminosity and energy. Physics potential given this. Requirements in terms of beam intensity, beam size and bunch configuration. Specific requests for special physics running conditions".
Technical stop and likely maintenance requirements through the year.
Presented by Massimiliano FERRO-LUZZI
on
20 Jan 2010
at
14:00
Presented by Mike LAMONT
on
19 Jan 2010
at
10:15
- Results from first operation, news for 2010.
- Performance, measurements vs. expectations (improvements of online model)
- Strategy to bring up luminosity performance
- Optimized behaviour vs energy and beta* -> How to handle this in LSA
- Problems encountered, is related software sufficient, necessary improvements, appropriate for 3.5TeV running?
Presented by Werner HERR
on
19 Jan 2010
at
17:15
- Performance, observations, problems encountered
- Review optics requirements for 2010 in all points
- Commissioning base-line and possible issues
- Settings of protection devices
- Is related software sufficient, necessary improvements, appropriate for 3.5TeV running?
Presented by Dr. Stefano REDAELLI
on
19 Jan 2010
at
16:55
Session:
Session 2 : Beam diagnostics
Performance of tune, chromaticity and coupling measurement system (BBQ and PLL). Status of feedbacks.
Observations of unexpected features in tune spectra (8 kHz, modulation, "the hump").
Presented by Ralph STEINHAGEN, Marek GASIOR
on
19 Jan 2010
at
14:20
What was observed in the tune spectra at 450 GeV? The hump, excitation of the tune spectra, lifetime issues.
Presented by Marek GASIOR
- Revise estimates and requirements for operation at higher energies
- Model for decay and snap-back
- LSA implementation is adequate?
- Additional measurement program to update the model
Presented by Dr. Ezio TODESCO
on
19 Jan 2010
at
17:35
Session:
Session 5 : Controls and operational aspects: going from commissioning to operational regime
some keywords: Improving rigor: procedures, checks, releases, testing, RBAC..
Presented by Dr. Brennan GODDARD
on
20 Jan 2010
at
11:15
Event calendar file