J. Tan will run through his presentation related to status and plans for the LIU-PSB project:
BI/PI:
• Turn by turn meas in the PSB
• Wide band PU
• BR8.TMD
• DCCT
BI/PM:
• H0/H- population meas at injection dump + Half Sector Test
• Matching profile at injection, ring3
• BI.SMV position plates
• BTV at stripping foil + Half Sector Test
BI/ML:
• New tanks for housing BT.BTV10+30
• New tanks for housing BI.BTV10
BI/BL:
• Fast BLMs at injection dump + Half Sector Test
• Standard BLMs for BI line and H- injection + Half Sector Test
• BLMs for L3 straight section
• BLM for extraction lines
• BWS