Adhoc BI/TB for LIU-PSB presentation

Europe/Zurich
864 2-B14 (CERN)

864 2-B14

CERN

Description
J. Tan will run through his presentation related to status and plans for the LIU-PSB project: BI/PI: • Turn by turn meas in the PSB • Wide band PU • BR8.TMD • DCCT BI/PM: • H0/H- population meas at injection dump + Half Sector Test • Matching profile at injection, ring3 • BI.SMV position plates • BTV at stripping foil + Half Sector Test BI/ML: • New tanks for housing BT.BTV10+30 • New tanks for housing BI.BTV10 BI/BL: • Fast BLMs at injection dump + Half Sector Test • Standard BLMs for BI line and H- injection + Half Sector Test • BLMs for L3 straight section • BLM for extraction lines • BWS
    • 09:00 09:30
      LIU-PSB presentation 30m
      Speaker: Jocelyn Tan (CERN)
    • 09:30 10:00
      Discussion 30m