Help us make Indico better by taking this survey! Aidez-nous à améliorer Indico en répondant à ce sondage !

3–10 Aug 2016
Chicago IL USA
US/Central timezone
There is a live webcast for this event.

The ESS neutrino facility for CP violation discovery (15' + 5')

5 Aug 2016, 12:52
20m
Chicago 6

Chicago 6

Sheraton Grand Chicago 301 East Water Street Chicago IL 60611 USA
Oral Presentation Neutrino Physics Joint Neutrino Physics & Detector: R&D

Speaker

Marcos Dracos (IPHC/IN2P3-Strasbourg)

Description

The comparatively large value of the neutrino mixing angle θ13 measured in 2012 by neutrino reactor experiments has opened the possibility to observe for the first time CP violation in the leptonic sector. The measured value of θ13 also privileges the 2nd oscillation maximum for the discovery of CP violation instead of the usually used 1st oscillation maximum. The sensitivity at the 2nd oscillation maximum is about three times higher than at the 1st oscillation maximum implying a significantly lower sensitivity to systematic errors. Measuring at the 2nd oscillation maximum necessitates a very intense neutrino beam with the appropriate energy. The world’s most intense pulsed spallation neutron source, the European Spallation Source, has a proton linac with 5 MW power and 2 GeV energy. This linac also has the potential to become the proton driver of the world’s most intense neutrino beam with very high potential for the discovery of neutrino CP violation. The physics performance of that neutrino Super Beam in conjunction with a megaton Water Cherenkov neutrino detector installed ca 1000 m down in a mine at a distance of about 500 km from ESS has been evaluated. In addition, the use of such a detector will make it possible to extent the physics program to proton–decay, atmospheric neutrinos and astrophysics searches. The ESS proton linac upgrade, the accumulator ring needed for proton pulse compression, the target station optimization and the physics potential are described. In addition to the production of neutrinos, this facility will also be a copious source of muons which could be used to feed a low energy nuSTORM facility, a future neutrino factory or a muon collider. The ESS linac, under construction, will reach full operation at 5 MW by 2023 after which the upgrades for the neutrino facility could start. This project is now supported by the COST Action CA15139 "Combining forces for a novel European facility for neutrino-antineutrino symmetry-violation discovery" (EuroNuNet) as well as by EU Regional Structural Funds in the region in Sweden where the neutrino detector will be located.

Primary author

Marcos Dracos (IPHC/IN2P3-Strasbourg)

Co-author

Tord Johan Carl Ekelof (Uppsala University (SE))

Presentation materials