|
FIRST SPL COLLABORATION MEETING
11-12 December 2008
Working Group 3 on
CRYO-MODULES DESIGN AND INTEGRATION
(design, construction, assembly…)
GOALS:
- Understand limits of scope of CEA and CNRS contributions
- Identification of integration needs: components type, interfaces, functional needs (ex.cooling power HOM)
- Identify uncovered items and possible distribution to institutes interested
- Define list of topics towards a functional specification: alignment requirements, thermal budgets (static+dynamic), mechanical requirements
- Define input for mechanical layouts, cryogenics specs (pressures & temperatures)
- Define the key ingredients for defining a layout for tunnel interfaces: longitudinal layout, interconnect space, coupler layout (vertical, lateral?)
- Elaborate a work organization structure
|