<span lang="EN-GB">To identify the potential issues for the start-up with beam of the PS-SPS complex and its experimental areas related to:</span>
- <span lang="EN-GB">the long shut-down, </span>
- <span lang="EN-GB">the major HW modifications that have taken place during that period</span>
- <span lang="EN-GB">the new control environment (CCC and control system modifications)</span>
<span lang="EN-GB">To provide the planning for the start-up with beam</span>