- Congrats to Andreas on LD position
- BI/RF QUEST selected. Supervised by Ole - start date 1st March
- Great presentations at BI-day
- ‘Safety Matters for Supervisors’ training - BI are not taking-up this course as much as other groups. Consider subscribing. This covers all safety, not just electrical
- 1st floor printer to be removed and installed a new one on the 2nd floor
- Issue L4C.BCT0117 since power cut
-
PSB DC-BCT BTrain
- Issue with status reporting
- LHC high intensity tests in 2026
- Power handling in our strip-lines
- DCCT saturation and electronics integrity (what about the PSB? Any news on what OP plans to do this year?)
- Need to check semi-fast amplifiers in PSB (8L1)
- ECRs
- New FBCTs in EA
- New FBCTs in LEIR TLs
- New FBCT + PU in AD ring
- Tune PUs in SPS
- Dump FBCTs in the LHC
- TRIC replacement
- Beam spec doc submitted
- Revise PSB numbers (at the moemnt it's 1.6e11ppb operational and 1.8e11ppb max)
- Intervention on Vertical Schottky PUs in LEIR - not happening
- but we need to be prepared si jamais
- Kind reminder: Tobias, Tech (ORIGIN) in the BP corridor - do not forget that, although he's sitting upstairs, he's supposed to work 50% for BP and 50% for IQ
- IQ New Year lunch (Cafe de Mategnin) - Jan
- AOB
There are minutes attached to this event.
Show them.