202nd EATM Meeting
-
-
14:00
→
14:05
News 5m
- Approval of the 200' EATM Minutes
Speakers: Dipanwita Banerjee (CERN), Laurie Nevay (CERN), Silvia Schuh (CERN) -
14:05
→
14:10
Action items 5mSpeaker: Dipanwita Banerjee (CERN)
-
14:10
→
14:25
Key information from different meetings 15m
Pre-distributed information + SBA highlights Lazzaroni)
ECRs
Planning & Important DatesSpeakers: Bastien Rae (CERN), Dipanwita Banerjee (CERN), Giulia Romagnoli (CERN), Michael Lazzaroni (CERN), Natalya Kahn-
Pre-distributed Information 2mSpeakers: Aboubakr Ebn Rahmoun (CERN), Dipanwita Banerjee (CERN), Michael Lazzaroni (CERN), Sylvain Girod (CERN)
-
ECR 5mSpeakers: Giulia Romagnoli (CERN), Natalya Kahn
-
-
14:25
→
14:35
Facilities requests for running during LS3: EN-EL solution 10mSpeakers: Adrien Noel Grinand (CERN), Eva Cano Gonzalez (CERN)
-
14:35
→
14:45
Facilities requests for running during LS3: EN-CV solution --> Postponed to 25th Aug 10mSpeakers: Jani Lehtinen (CERN), Kacper Kajetan Kuczynski (CERN)
-
14:45
→
14:55
UPS Problem BA80 10mSpeaker: Adrien Noel Grinand (CERN)
-
14:55
→
15:05
North Area Ion Preparation 10mSpeaker: Sylvain Girod (CERN)
-
15:05
→
15:10
Safety Message 5mSpeaker: James Devine (CERN)
-
15:10
→
15:30
News from Experiments 20m
-
IRRAD/CHARM 5mSpeakers: Federico Ravotti (CERN), Giuseppe Pezzullo (CERN), Salvatore Danzeca (CERN), Salvatore Fiore (CERN)
-
AMBER 5mSpeaker: Benjamin Moritz Veit (Johannes Gutenberg Universitaet Mainz (DE))
-
NA64 5mSpeakers: Laura Molina Bueno (Univ. of Valencia and CSIC (ES)), Vladimir Poliakov (Millennium Institute for Subatomic Physics at High Energy Frontier (CL))
-
NA61 5mSpeaker: Bartosz Maksiak (National Centre for Nuclear Research (PL))
We finished the run yesterday morning. We are switching to lead beam to perform few tests without magnets. We got beam slot until Aug 11.
There was a power cut on July 23. There was an alarm in our area connected with a leak from our MRPC system. Fire Brigade was called, they came, asked for an evacuation. After their intervention many of our machines were off. It is not clear that the power went off as a manual switch of the circuit. We are trying to clarify this.
Cryo experts started working on the magnets. They have a long list of tests and checks to perform while the system still operates in cold mode.
We have two or three big wooden crates containing our recently used targets (that we plan to use again after LS3). We would like to store them somewhere.
There is a (water?) pipe traced just above the floor nearby entrance to PPE152. That pipe appeared to be a big obstacle during two failures of our magnet power converters. Are there any possibilities to trace it in a different way?

-
CLOUD 5mSpeaker: Antti Onnela (CERN)
-
GIF++ 5mSpeaker: Paolo Martinengo (CERN)
-
HiRadMat 5mSpeakers: Alice Marie Goillot, Nikolaos Charitonidis (CERN)
-
-
15:30
→
16:00
A.O.B 30m
- Short update from start of LS3 for HI-ECN3
Speaker: Claudia Ahdida1. ESP discussions:
- C2E nominated for Experimental Area, not officially appointed. Not expected to be operational before 1 September 2026 (TBC with Sebastien).
- HSE proposal for “temporary” procedures for areas without C2E presented at LS3C on 29 July 2026; optimistically a “temporary” procedure might be approved 12 August 2026
- We go ahead as usual for lockout and access following discussion with HSE until advised otherwise
- Aim for 1 September 2026 to start working with the EA C2E; we will agree handover/start of C2E together with BE-EA
- Mise hors tension partielle being prepared for week of 6 October, following safe removal of LKr to its new storage facility outside EHN1.
- All activities are risk assessed for electrical safety risks (see below) with lockout and verification of absence of voltage made in each case.
- EP ESO supporting electrical safety for EP activities (including external users) on-site2. Start of ECN3 shutdown works this week:
- Works start 3rd August in ECN3 under coordination of HI-ECN3 PID team:
- IMPACT approval modified accordingly
- Normal NA62 experiment shutdown activities and limited NA62 dismantling activities
- Lockouts have been requested as usual for shutdown, e.g. beam line magnets
- Additional lockouts are being carried out systematically for each approved and risk assessed activity to guarantee LKr system is not tripped
- All activities have WPA and PPSPS
- VIC performed by HI-ECN3 project Safety Coordinator before works start
- EDMS 3502579: memo for IMPACT access request changes shared with NA62 spokesperson (attached, please feel free to circulate)
- We switch to Category 1 worksite next week once NA62 shutdown activities are completed:
- Looking for urgent solution this week to allow piquet interventions once a Cat 1 worksite
- First status update from HI-ECN3 PID Coordination Team at next EACM/EATM.
-
14:00
→
14:05