CLEAR Weekly Operation Meeting

Europe/Zurich
CERN

CERN

Videoconference
CLEAR Weekly Operation Meeting
Zoom Meeting ID
65286787581
Host
Roberto Corsini
Useful links
Join via phone
Zoom URL

MINUTES

Actions from previous week:

  • Check the availability of a beam pipe to allow the installation of only two CLIC cavity BPM      > ongoing
  • Further look to solve the noise in the plasma lens pump.
  • Devise a way of doing laser alignment on the in-air test stand.
  • Understand where's the end of the trigger cables in the klystron gallery.
  • Look at moving one of the unused CTF3 front ends to the barrack to aid data collection.

New actions: 

  • Reconnection of the thermalized water pipes on the X-band ACS
  • Re-installation of safety valve on gas pipe for P.L.
There are minutes attached to this event. Show them.