Description
The interventions affecting the cryomagnets, the interconnections and/or the superconducting circuits, excluding main splices consolidation and QPS interventions will be presented. All the tasks not covered in other talks of this session will be detailed, especially:
the replacement of cryomagnets,
the consolidation of the connection cryostats,
the repair of interrupted Y-lines,
the installation of safety pressure relief devices (DN200 & 160),
the consolidation of some SAM helium level gauges,
the use and possible addition of radioprotection samples
the investigations of open issues like high resistance splices and superconducting circuits non-conformities
Finally, the present plan, work organization and workload for these activities including DS collimators installation, interventions on the beam lines and leaks localization and repair, will be summarized.