Dusan Vudragovic January, 2007 Major work for SEE-GRID; major changes in workplan ---------------------------------------------------------------- * testing SyslogNG tool * installation gLite3 WN on SL4 32-bit * presentation of SEE-GRID BBmSAM tool at SAM metting * creating Availability metrics for SEE sites with David Collados Polidura * update Availability metrics for SEE sites * contribution to D2.2 Major work for GD-OPS; major changes in workplan ---------------------------------------------------------------- * SAM support * introduction with ROC CERN * GOC wiki updates Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- WLCG Collaboration Workshop Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the period ------------------------------------------------------------ 3 days TimeSheet for the month ------------------------------------------------------------ WP1 A1.4 10% WP2 A2.2 20% WP3 A3.1 70% Infrastructure status ------------------------------------------------------------ 29 of sites in project 9 of sites contributing to the EGEE production infrastructure 607 of cpus 15.75TB total SE