MTE workshop 2010
from
Friday 24 September 2010 (09:10)
to
Monday 27 September 2010 (16:00)
Monday 20 September 2010
Tuesday 21 September 2010
Wednesday 22 September 2010
Thursday 23 September 2010
Friday 24 September 2010
09:10
09:10 - 09:15
Room: 874/1-011
09:15
Status of commissioning with beam
-
Simone Gilardoni
(
CERN
)
Status of commissioning with beam
Simone Gilardoni
(
CERN
)
09:15 - 09:45
Room: 874/1-011
• Performance and reasons to stop normal operation with MTE • Issues encountered (controls, instrumentation, kickers) • Next steps • Requirements for completing the commissioning in 2010 (instrumentation, controls, OP support, time required in dedicated mode) • Optics of the extraction line • Impact of MTE-related studies on other operational beams
09:45
09:45 - 09:55
Room: 874/1-011
09:55
Measurements’ analysis
-
Massimo Giovannozzi
(
CERN
)
Measurements’ analysis
Massimo Giovannozzi
(
CERN
)
09:55 - 10:25
Room: 874/1-011
• Stability issues • Required tools and instrumentation
10:25
10:25 - 10:35
Room: 874/1-011
10:35
Coffee Break
Coffee Break
10:35 - 10:50
Room: 874/1-011
10:50
Operations point of view: PS
-
Rende Steerenberg
(
CERN
)
Operations point of view: PS
Rende Steerenberg
(
CERN
)
10:50 - 11:20
Room: 874/1-011
• Status of setting up after the first operational period • Things to be re-done • Status of the transfer line • Requirements for operation of Fixed-Target/CNGS with MTE
11:20
11:20 - 11:30
Room: 874/1-011
11:30
Operations point of view: SPS
-
Karel Cornelis
(
CERN
)
Operations point of view: SPS
Karel Cornelis
(
CERN
)
11:30 - 12:00
Room: 874/1-011
• Status of setting up after the first operational period • Things to be re-done • Status of the transfer line • Requirements for operation of Fixed-Target/CNGS with MTE
12:00
12:00 - 12:10
Room: 874/1-011
12:10
Radioprotection issues
-
Markus Widorski
(
CERN
)
Radioprotection issues
Markus Widorski
(
CERN
)
12:10 - 12:40
Room: 874/1-011
• Status of ring (septum excluded) after MTE operation • Septum activation • TT10 hot spot • Linac 3 area • CT vs. MTE in terms of losses • Requirements for running with MTE • Long term requirements in case of MTE running: shielding on top of SMH16, barracks in the ring center
12:40
12:40 - 12:55
Room: 874/1-011
12:55
Lunch Break
Lunch Break
12:55 - 14:15
Room: 874/1-011
14:15
Power converters stability
-
Pierre Freyermuth
(
CERN
)
Power converters stability
Pierre Freyermuth
(
CERN
)
14:15 - 14:45
Room: 874/1-011
• Check with new observation tools: PFWs, F8L, low-energy quads, sextupoles and octupoles • B-field fluctuations
14:45
14:45 - 14:55
Room: 874/1-011
14:55
General status of instrumentation
-
Jean-Jacques GRAS
(
CERN AB-BDI
)
General status of instrumentation
Jean-Jacques GRAS
(
CERN AB-BDI
)
14:55 - 15:25
Room: 874/1-011
• Status of beam current transformers • TT2 couplers: what is needed to make them operational • Status of new wire scanners • Status of LHC BLMs: actual and expected performance
15:25
15:25 - 15:35
Room: 874/1-011
15:35
Coffee Break
Coffee Break
15:35 - 15:50
Room: 874/1-011
15:50
Considerations on performance of extraction elements
-
Luc Sermeus
(
CERN
)
Considerations on performance of extraction elements
Luc Sermeus
(
CERN
)
15:50 - 16:20
Room: 874/1-011
• Aperture and strength margins for SEH31 • Performance of BFAs – pedestal and staircases - (strength and PPM capabilities) • Aperture margins for SMH16 • Issues with MTE kickers (sparking). Fancy operation: change of polarities • Limitations in case of test for new extraction schemes in combination with CT operation • Performance of DFA in TT2 (ppm) • Spare policy of SMH16 with MTE • Spare policy of SEH31 with MTE hybrid
16:20
16:20 - 16:30
Room: 874/1-011
16:30
New MTE extraction scheme to mitigate irradiation of SMH16
-
Massimo Giovannozzi
(
CERN
)
New MTE extraction scheme to mitigate irradiation of SMH16
Massimo Giovannozzi
(
CERN
)
16:30 - 17:00
Room: 874/1-011
• Principle • Required measurements
17:00
17:00 - 17:30
Room: 874/1-011