WILL BE UPDATED DURING THE MEETING !!!
----------------------------------
Weekly Planning : https://teamup.com/ksvh7dak8mub8k7xpe
UPSTREAM : Default filter settings : 2.2
DOWNSTREAM : Default filter settings : 1
----------------------------------
ATLAS - MM :
Maxence will be here the whole August. Early September a new ATL-MM-CSC chamber would be installed inside the bunker for one month. It should be installed on the back of the ATL-MM ceiling chamber. Premixed bottles (Ar-CO2 80/20) already ordered.
ATLAS - sTGC :
Currently not present in bunker.
ATLAS - sMDT :
Back to the nominal position since Sunday 15th. Minor adjustments still needed before the test beam. Gas rack ok, after the power cut (AULs test). Source OFF needed today for 1h.
CMS - CSC: Safety meeting (with people from EP safety and HSE) related to the broken trolley scheduled for today afternoon. Also for the other setup that is currently in the bunker an inspection will be needed. Moreover the setup will be moved in the prep.area in order to lift it of additional 10 cm. Gas chromatograph analysis to be performed during next week.
EP-DT2 :
Setup moved out of the bunker and will stay in the preparation area till the September test beam.
EcoGas: running with standard gas mixture. Two chambers where removed and transported to 904 for further tests. Back on the GIF++ bunker before September test beam.
CMS-DT: Source scan scheduled for today. After some test done it seems feasible to run with filter 2.2. More test will follow this week.
CMS-RPC: Consolidation system is ON for the longevity program. There will be the need of a 3 hours slot today to perform a source scan: one with source ON, ABS 6.9 and another one with source off. It will take place between 13h and 15h today.
ATLAS-RPC: Last week the module A0 has been inserted in the bunker. Not yet connected for the moment.
ProTOV: Preparing for September test beam.