First session of “deverminage” of the LHC procedures dedicated to the diode installation and control process
→
Europe/Zurich
ZOOM (ZOOM)
ZOOM
ZOOM
Description
Provisional agenda:
- Introduction (5 mins);
- Diode installation procedure EDMS 1514936 (45 mins + discussion);
- Diode control procedure EDMS 2604668 (35 mins + discussion)