#1: RF flange and input WG for CLIC-K
Wednesday 3 November 2021 -
14:30
Monday 1 November 2021
Tuesday 2 November 2021
Wednesday 3 November 2021
14:30
RF design and tolerances study of the choke mode RF flange
-
Xiaowei Wu
(
Argonne National Laboratory (US)
)
RF design and tolerances study of the choke mode RF flange
Xiaowei Wu
(
Argonne National Laboratory (US)
)
14:30 - 14:50
14:50
RF design of the input waveguide network for the CLIC-K acc. structure with bended damping waveguides
-
Ping Wang
(
CERN
)
RF design of the input waveguide network for the CLIC-K acc. structure with bended damping waveguides
Ping Wang
(
CERN
)
14:50 - 15:10
15:10
Plans and AOB
Plans and AOB
15:10 - 15:30