- Calibration code for the DCP DPs processing almost completed.
- To tested with the simulated DPs. This will be done as soon the new aliases will be ready.
- The DCS DPs procecessing has to be done at the end of run, this needs a dedicated implementaiton in the code --> in progress.
- During the night HMPID stably run with 6 links enabled. After calibration also the other links will be included and the stability will be tested again.
- Today it will start the switching from argon to CH4.
- Cherenkov angle reconstruction implementation is in progress. MatchInfoHMP class and RecoContainer class modifications have been implemented and committed.
- Trigger logic discussed and validated.