Dedicated TREX- New ZDC/RPD inside TANA

Europe/Zurich
Description

Dedicated TREX- New ZDC/RPD inside TANA

- Eventual Need for ARR/ECR/layout modifications  

- Storage of the detectors after the Run (not enough space in the existing ZDC sarcophagi)

- Installation w/ slight shift (4-5cm) of the BRAN on Arm 1-2

- Eventual safety check – clearance of the HV connections on the detector