E-Beam - #15 Working Group Meeting
Monday 20 June 2022 -
10:15
Monday 20 June 2022
15:00
_Overview of the electron lens for SC compensation in SIS18 @ GSI_ POSTPONED
-
Kathrin Schulte-Urlichs
(
GSI
)
Kathrin Schulte
(
Institute for Applied Physics
)
_Overview of the electron lens for SC compensation in SIS18 @ GSI_ POSTPONED
Kathrin Schulte-Urlichs
(
GSI
)
Kathrin Schulte
(
Institute for Applied Physics
)
15:00 - 15:01
Room: 774/1-079
The existing synchrotron SIS18 will serve as injector to FAIR (Facility for Anti-Proton and Ion Research, under construction at GSI). The large tune footprint of the beam, and machine imperfections make operations at high intensity challenging, requiring delicate control and space charge compensation to limit emittance growth and beam losses. This talk gives us an overview of the electron lens foreseen to be installed at SIS18 for Space Charge Compensation.
15:01
Electron Beam Tests Stand: experimental results and e-beam simulations
-
- Sameed
(
University of Manchester (GB)
)
Electron Beam Tests Stand: experimental results and e-beam simulations
- Sameed
(
University of Manchester (GB)
)
15:01 - 15:36
Room: 774/1-079
Overview of the CERN Electron Beam Test Stand (EBTS) - designed to test different components for the HL-LHC Hollow Electron Lens (HEL) - with current setup, latest experimental results and e-beam simulations.
15:36
AoB
AoB
15:36 - 15:41
Room: 774/1-079