Minutes of the meeting between TE-MPE and SY-ABT on BISv2 new developments 

 

Present: Antoine Colinet, Christophe Martin, Tomasz Podzorny, Raffaello Secondo, Ivan Romera, Pieter Van Trappen, Nicolas Voumard

Excused: Nicolas Magnin, Jan Uythoven

 

BIS v2 new developments and impact of new actuator board (CIBAB) on SY-ABT systems 

 

TE-MPE proposes to standardize the interface between the BIS and its actuators (LBDS, SBDS, MKI, MKP, PC, LINAC4 CHOPPER, etc) in the entire CERN complex. The baseline of the BIS v2 project includes the development of such an interface board, the so-called CIBAB, that will be ready for LS3. The CIBAB will provide the following:

SY-ABT notes that the interface between the CIBAB and the TSU/FIB is not compatible with the present hardware, therefore a new design of the TSU/FIB boards would be required. At present, SY-ABT does not foresee to develop new TSU/FIB boards for LS3. Nevertheless, the proposal from TE-MPE will be taken into consideration and studied. Three options were discussed at the meeting for possible interface in LS3:

 

ACTION for SY-ABT: evaluate the three proposed options and come back to TE-MPE with the preferred solution to be implemented in LS3