Choose timezone
Your profile timezone:
Proposed change of priorities
1. 825 part 4.1 (b.188 to b.35)
2. 836 (corner and pump room in b.112)
3. 826
4. 830 (including some small parts of galleries 180 or 183 as no separate planning is prepared for them yet)
5. 825 Part 4.2 (b.35-b.110)
6. 827
7. 830 (836 – b.180 as built model)
Finalisation de la partie entre le bâtiment 188 et les bâtiments 35 et 182 (jonctions inclues)
Etat des lieux du reverse engineering à l'extrémité ouest (jonction 112/S-403)
Galerie 818