Minutes of the PS-SPS Users Meeting held on April 20th, 2023

News from the acting PS & SPS Physics Coordinator (D. Lazic)


PS Machine Report (Alex Lasheen)

SPS Machine Report (Arthur Spierer)

Safety / Radiation Protection (Please Add Your Name Here)


n_TOF (M. Bacak)

Taking physics data in all experimental areas (EARs):

Beam:

East Area Beam Status (N. Charitonidis)

T09 operation ongoing without issues. T10 running with beam since Friday, no issues. T11 ready for CLOUD.

East Area Users Tour de Table

T8: IRRAD / CHARM (F. Ravotti)

From Thu. 13th to Mon. 17th: dosimetric measurements in CHARM to characterise the facility for 2023 runs (access to move the rack with RADMONs installed), several shielding configurations plus a run with no target. Tue. 18th: continue irradiations in IRRAD access for further measurements in CHARM (close to BLM with RADMON + BATMON) and beam alignment and dosimetry checks on all IRRAD tables. Yesterday (Wed. 19th): first active user installation in CHARM (current transducers from SY-EPC), installation of additional passive samples in IRRAD (TE-MSC) and start of “regular” user run. Before starting, change XSECs gain from LOW to MID. Time for further beam steering, ongoing now (reduce the beamsize along IRRAD). Next access, Tomorrow (being organized, issue with the SY-EPC setup), Tuesday next week (probably not needed on Wednesday). IRRAD and CHARM specific user safety trainings also enforced as access requirement starting from next week.

T9: PAN (Daniil Sukhonos, UNIGE)

We have performed all mandatory measurements:

We are trying to set up the low momentum positive hadrons beam (1 GeV/c, 0.5 GeV/c) using threshold cherenkov detector signal for filtering out electrons, but for the moment we are struggling with our NIM crate…

We plan to continue testing new detectors and operation modes with Medipix in parasitic mode until next Wednesday.

T9 Incoming: MEDIPIX - Week 16 (Please Add Your Name Here)

T9 Incoming: LHCb ECAL - Week 17 (Matteo Salomoni)

Test of the new telescopic tracking system from EPFL (SciFi based).
Tasks:

T10 Outgoing: ALICE ITS3 (Please Add Your Name Here)

T10: ALICE TOF (Please Add Your Name Here)

T11: CLOUD (Eva Sommer)

CLOUD is currently setting up. There are still some problems with the gas system. We hope to be able to start on the weekend or early next week.


AWAKE Status (Giovanni Zevi Della Porta)

Last week:
Prepared and executed first proton beam test with Discharge Plasma Source:

Thanks to SPS, vacuum, EPC, firefighters , access system for making this possible!

This week: Continue DPS commissioning, install additional diagnostics and BTV filters

North Area Beam Status

H2, H4, H6, and H8 Beams (N. Charitonidis)

Comissioning ongoing, configurations of the year being tested with positive results. New XCIO.X022450 in H2 operational. The electron beam quality in H6/H8 also looks much better compared with last years, but still working on it.

Other Beams P42, K12, and M2 (N. Charitonidis)

Good progress on the beam commissioning for P42 and K12. After extensive works and finding an issue with a vacuum chamber, the beam spot on T10 is now again ok with nominal optics. Commissioning will continue this and during next week with both P42 and K12 beams.

Beam commissioning in M2 progressing well. Steering of hadron and muon beams checked. Different hadron beam energies to be tested once the beam is back and CEDAR performance tests are planned for next week with the beam.

North Area Users Tour de Table

H2

H2 Incoming: CALICE ScW + AHCAL - Week 16 (Please Add Your Name Here)

H4

H4 Incoming: GIF++ - Week 16 (M.Jaekel, G.Pezzullo)

8 groups/setup running in parallel

Most of the setups are ready for the muon beam. Still finalising the ATL-MPI, CMS-iRPC and ATL-RPC installation.
Tomorrow Friday April 21st, after the beam pipe is removed, we foreseen the safety inspections for all the setups in the bunker.

H4 Incoming: RD51 - Week 16 (Yorgos Tsipolitis, Eraldo Oliveri)

PPE134 USERS: Five groups/setups running in parallel

BEAM: muons high rate most of the time. Some pions shifts planned. No electrons. No Magnet.

BEAM TUNING: interested on getting the highest rate with muons as soon as possile. To be agreed with Nikos when. More relaxed for the pions tuning.

INSTALLATION: started this week. To be completed this friday, aligment survey planned for Friday 3pm and safety at 4pm. ISIEC updated to add the information of setup added at later stage.

FLAMMABLE GASES: Visit with flammable gas safety officer wednesday 19 morning to verify the system. Leak test done and setting up ongoing with the help of the Jaillet’s team. Use of gas in the system after the general safety visit on Friday.

H4 Incoming: STRAW Tracker RD - Week 16 (K.Kuznetsova, T.Enik)

see `RD51

H6

H6 Incoming: ATLAS ITK PIXEL - Week 16 (Andre Rummler)

General telescope setup: chiller is back after one years of repairs; cleaned and swapped over Easter; recommissioning (communication issues); telescope chiller broken; replacement in work.

ITk Pixel: irradiated modules in freezer of buffer zone; getting ready for beam; will need to continue setting up on Monday; safety visit 1630 Monday.

H8

H8 Outgoing: MADMAX (Pascal Pralavorio)

Long run of MADMAX ended Friday 14-April as foreseen. All the set-up was dismounted and the zone was free the same friday. Thanks again for all the support and see you next year !

H8 Incoming: LHCb - Week 16 (Please Add Your Name Here)


AOB

Minutes by the respective speakers, edited by D. Lazic, E. B. Holzer and M. Schwinzerl