Minutes of the PS-SPS Users Meeting held on April 27th, 2023

News from the PS & SPS Physics Coordinator (E. B. Holzer)

The supercycle aims to deliver:

–> The supercycle needs to be a bit longer than in run2 to accomplish this sharing
–> for example 3 SPS cycles work very well with that sharing.
This sharing is not always possible, e.g. when the LHC is being filled.

Instructions to PS users:

PS Machine Report (Matthew Fraser)

PS is now in full operation, availability at ~88% last week

TOF

EAST

SFTPRO

AD

SPS Machine Report (Carlo Zannini)

SFTPRO

HiRadMat

AWAKE

Safety / Radiation Protection (Please Add Your Name Here)


n_TOF (Nikolas Patronis)

The experiments are in data taking mode:
-Neutron inelastic test measurement in EAR1 using HPGe (6Li(n,n’) & 56Fe(n,n’))
-Capture auxiliary characterization measurements in EAR2
-NEAR: 94Zr(n,γ) with 10 mm B4C filter

Low intensity pulses are requested for optimal signal processing conditions (needed in EAR1)

On Wednesday morning (03.05.2023) a ~5h intervention will be needed to modify sample/filter configuration @ NEAR

Many thanks to the PS teams for being patient with our frequent interventions

PoT: 1.7E18

East Area Beam Status (L. Nevay)

T09: Smooth Operation. Beam will be tuned with LHCb today.
T10/T11: Smooth Operation.

East Area Users Tour de Table

T8: IRRAD / CHARM (F. Ravotti)

Thu. 20th: beam optimization in the morning in order to reduce the beam transversal dimensions along IRRAD in the new parallel optics (many thanks to Marc and Eliott!). Fri. 21st: short access to CHARM to retrive the user rack suffering of an unexpected early failure. Irradiations continue in IRRAD until Tue. 25th when the weekly access was anticipated this week. During the access: installation of diamond detector in R13 and exchange of samples in IRRAD. The IRRAD-BPM2 was also re-aligned following the beam optimzation of the previous week. This week we integrated about 1.5E16 p/w. Next access will be on Wednesday next week.

T9 Outgoing: MEDIPIX (Benedikt Bergmann, IEAP CTU)

Thank you for the support. Everything worked very well! Due to the continuous availability of the the beam, we have been able to finish the data taking 1 day earlier.

The following measurements were done:

T9 Outgoing: PAN (Daniil Sukhonos, UNIGE)

Thank you for the support and beam availability during almost 3 weeks. We did all planned measuerements for position resolution studies and momentum resolution studies of our MiniPAN spectrometer. During the parasitic beam time we dedicated our efforts to understand the behaviour of StripY detectors, which had issues with asic configuration. The problems were fixed and the possibility to check immediately their performance with real particles was extremely useful.

T9: LHCb ECAL (Matteo Salomoni [apologize but cannot attend, conflict with another meeting])

Setup finalized without DWCs, software update to run the SciFi tracker started. Beam tuning will start soon with Dipanwita. Beam in the afternoon for some preliminary checks, second safety check foreseen (informally) tomorrow after DWCs installation, will coordinate with the Safety group.

T9 Incoming: ALICE TIMING - Week 18 (Please Add Your Name Here)

T10: ALICE TOF

Last week we spent some time to find the coincidence of scintillators. Last week we took data for a small MRPC using standard gas successfully. Preliminary data analysis shows that we have an efficiency more than 98% at ±6kV and a timeresolution of 52 ps.
The rest of the periiod we will continue taking data usin Eco gas.


T10 Incoming: ALICE ITS3 - Week 18 (Paolo Martinengo)

Preparing telescopes (two) in the lab, installation will start on Wednesday as scheduled. ISIEC form submitted.

T11: CLOUD (Please Add Your Name Here)


Incoming: AWAKE (Giovanni Zevi Della Porta)

Last week:

This week:

Next week:

North Area Beam Status

H2, H4, H6, and H8 Beams (L. Nevay)

H2: Muon beams for calibration OK, electron and hadron beams being prepared today.

H4: Beam stable with the new XCIO operational and working well.

H6: Some instabilities were observed in the beam in terms of position and transmission. Quad1 has been isolated as the likely cause. Last night it was switched off and the beam tuned without it which has worked well. Today during the stop at 14h first line will take a look at the power converter.

H8: Beam prepared and waiting for feedback if everything is ok. Small problem on the access configuration of CESAR, it moves the wrong TAX. It should be solved now, but please check ‘TAX Status’ when going next time to an access or coming back from one.

Other Beams P42, K12, and M2 (L. Nevay)

M2: Beam commissioning complete successfully. Currently some work is ongoing on the CEDARs and FISCs following which the CEDAR performance can be tested for low momentum hadrons. We give the last days of our beam commissioning to AMBER to start earlier with their ECAL calibration.

P42/K12 beam commissioning completed, now doing some last checks on the beam instrumentation and the transmission efficiency from T4 to T10. Important reduction in needed protons on T4 (70 -> 57 units) due to removal of a vacuum chamber between T4 and P42 TAX that was accidentally hit by the beam and due to using 40 mm target in T4 instead of 100 mm one.

North Area Users Tour de Table

P42-K12 and M2

K12 Incoming: NA62 (Roberto Piandani)

We are finalizing the commissioning of the detectors and data acquisition system. We are working to fulfill all the requirements to be ready for the start of the data taking next week.

M2 Incoming: AMBER (Please Add Your Name Here)

H2

H2: CALICE ScW-ECAL + AHCAL (Yong Liu)

H4

H4: GIF++ (Please Add Your Name Here)

H4: RD51 (Yorgos Tsipolitis, Eraldo Oliveri)

H4: STRAW Tracker RD (Temur Enik, Katerina Kuznetsova)

H6

H6: ATLAS ITK PIXEL (Andre Rummler)

Infrastruture re-commissioning finished (replacement telescope chiller installed on Tuesday) completing the work of the last weeks. All is nominal and operational in H6A.

Safety check passed Monday afternoon without issues and beam permit received.

Five modules (four irradiated ones) were installed and tuned. Tuning took much longer than expected due to learning curve for operation of irradiated modules with this version of the chip; particularly inhomogenously irradiated ones. Start of data taking this morning at 3am after a couple of hours of debugging due to two chips having the same ID (needs to be followed up today).

Issues with beam stability in H6; beam liaison physcists debugging and magnet first line intervening. Running without one quadrupol since yesterday; planned to have another intervention in the shadow of the 14-15 beam stop. Despite that - even without the quadrupol - beam prepared by contact physicists perfect for our needs; Dipanwita tuned it very late at night.

H6 Incoming: CMS PIXEL - Week 18 (Please Add Your Name Here)

H6 Incoming: RD42 - Week 18 (Please Add Your Name Here)

H8

H8: LHCb (Andrea Lampis, Giovanni Passaleva)


AOB

Minutes by the respective speakers, edited by E. B. Holzer and M. Schwinzerl