During the PCS analysis, the wrong value of resistance was sent to MTF (R45 instead of RPNO). Cedric will look at the bag. A list with all results can be generated later (Action: Cedric) and input in MTF. MP3-CCC members are reminded that the PNO.a3 test has to be signed using the PCS tools so that the values are sent to MTF. We need to find a way to enforce that the test is signed properly (Action: Markus and Cedric)
Once the data is cleaned, only MQTL11. R2B2 seems to be an outlier. The circuit was measured once in 2008 and once in 2011. Resistance from last campaign was inside tolerance. The test should be repeated at least once, and if the value is confirmed, a NC shoule be open and test should be carried in the tunnel. (Action: Edward and ELQA)
Mike noticed that the resistance is always positive. If it is indeed noise, it should have both signs. The calculation is done by taking absolute value.
The number of splices in a circuit used by he PCS tool seems to be wrong. The tolerance per splice is currently the same for all kinds of circuits.This needs to be reviewed (Action: Edward).