Minutes of the PS-SPS Users Meeting for Week 30 held on July 27th, 2023

The agenda for this meeting is based upon user schedule v1.7.0, please cf. here. Please note the current injector schedule which contains information about MDs, Technical stops, etc. and can be found here.

Next user meeting:
For week 31 on Thursday, August 3rd, 2023 10:30 CEST
Meeting room 874/1-011

News from the PS & SPS Physics Coordinator (E. B. Holzer)

New user schedule to be made available online version 1.7 (this is the 22st numbered user schedule since February)

See this codimd location from Tuesday morning onwards for the *News from the FOM (E. B. Holzer

Preview of MDs:

Week 30:

Weeks 31 & 32

Intensity split

T2 = 50
T4 = 100 / T10 = 55 (until Monday 31th July) – possibly ask for an increase to be able to install the longer target for electron beam users in H8 (T4 = 120 units?)
T6 = 35

PS Machine Report (Bettina Mikulec)

SPS Machine Report (Michael Schenk)

Safety / Radiation Protection (J. Devine)


n_TOF (Nikolas Patronis)

EAR1: The second part of the 243Am(n,f) reaction study is on going. This part of measurement is focusing on the higher neutron energies. This measurement will stay there for 3 weeks more.

EAR2: The 64Ni(n,g) is running also nicely. 2 weeks of data taking are needed to achieve the needed statistical uncertainty.

NEAR: An in beam test of diamond detector was performed yesterday in the a-NEAR. In the i-NEAR irradiation hardness studies are on-going.

Special beam request for today (27.07.2023): 15h00 – 19h00 beam with low intensity pulses: (2 x 50 + 2 x 100 + 2 x 200 + 2 x 350 + 2x 850 ) E10 ppp. This is for having a complete mapping of the pile up in our detectors.

PoT: 1.18E19 (Many thanks to the PS-teams!)

East Area Beam Status (N. Charitonidis)

T09: WCTE continues in low momentum configuration. No issues. Target changed to 200 mm Al.
T10: Good operation. One DWC used by BL4S replaced by BI, high voltage on beamline scintillator adjusted in response to user feedback.
T11: No user.

East Area Users Tour de Table

T8: IRRAD / CHARM (G. Pezzullo / F. Ravotti / J. Lendaro)

Very good week, no issue with operation. Cumulative intensity delivered to T8 well above specifications, thanks! :) (>2.3e16 p/w, see plot below). Beam alignment and center on both X- and Y-axis, well under control (still around 90% on both axis as the previous weeks).

During the access on Wednesday, we exchanged dosimetry samples and all long-term users continue EP-ESE, TE-MSC [including N2 experiment], CMS Pixel, ITk Pixel [scanning table], RD50, ATLAS HGTD, etc. Installed cablings for experiment planned next week from SY-BI (IRRAD). CMS DT setup removed, BE-CEM components continue testing and a new setup from CAEN was installed (CHARM).

Upcoming access, next week.

T9: WCTE (Mark Hartz)

T9 Incoming: TECHNO CLS - Week 31 (Pietro Monti-Guarnieri)

The experimental setup will be installed as soon as the beamline is available. The setup will include silicon microstrip trackers, plastic scintillators, a goniometer and some electromagnetic calorimeters. We will run mainly with electron/positron beams with an energy of

6 GeV.

We will contact today dr. Dipanwita Banerjee to define any additional detail concerning the setup and/or the beam.

T10 Main: BL4S (Sarah Zoechling)

T10 Incoming: ALICE ToF - Week 31 (Please Add Your Name Here)


AWAKE Incoming (Giovanni Zevi Della Porta)

Proton run starting next week. Currently on the last steps of commissioning for newly installed plasma source. Aligning laser lines (IR, Marker) and optical lines for all beam screens. Little or no electron beam expected in this run.

Detailed plan:

Proton beam: nominal optics (200 um), 1E11 and 3E11 intensities, bunch compression ON.


North Area Beam Status

H2, H4, H6, and H8 Beams (N. Charitonidis)

H2: NA61, issues with the VTX1 cryo, fixed only Sunday. Issue with beam movement in the vertical plane still being investigated with the SY/EPC team. Yesterday night, issues with PM1 & PM2 of the CEDAR, mitigated by the SY/BI team. Still some low intividual efficiency observed at the PMs, followed up with SY/BI.
H4: Operation without issues.
H6: Normal operation last week. Now a switch to higher intensity. PPE146 and PPE156 are linked in the access matrix and the access command in CESAR this week so beam will go off in PPE146 if PPE156 is opened - for safety with the higher rates. Alignment and rate check last night and reached similar but slightly lower levels than last higher intensity week.
H8: PMT of most upstream XCET.042.474 replaced last Friday morning, testing still ongoing. Otherwise, no issues to report for the beam.

Other Beams P42, K12, and M2 (N. Charitonidis)

M2: Beam size and rates tuned for the muon beam on Wednesday. Electron beam to be checked on Thursday afternoon after the morning access in TCC2 and TT83 for vacuum.
P42/K12: Operation in beam dump mode with interleaved Kaon running on Tuesday. Again a problem with the ECN3 access PAD/MAD on Wednesday. The issue was discussed at the last EATM meeting and was elevated to the IEFC.

North Area Users Tour de Table

P42-K12 and M2

K12: NA62 (Jurgen Engelfried)

M2 Main: NA64mu (L. Molina)

-Since Thursday 20th in the afternoon we are the only user.

-Friday 21st we started to measure the hadron contamination in the beam with 3 up to 9 absorbers. Very good beam over the weekend, on Saturday we collected about 5400 spills.

-Sunday we set up the physical trigger and we reproduce the rates measured in 2022. We are running at 2.8x10^6 muons per spill.

-We performed measurements without ECAL on Monday. In the evening we move the ECAL in and started data taking in the same configuration as in 2022, reproducing similar rates.

-Tuesday we switched on both magnets and collected data in this configuration

-Wednesday we tuned the beam with Dipanwita and increase intensity up to 4.7x10^6 muons per spill^

-Today we plan to calibrate ECAL and continue data taking

H2

H2: NA61/SHINE (Piotr Podlaski)

side comment: yesterday morning SPS Page-1 was showing that MD will finish at 10h, I called the operators and they confirmed. However around an hour later I recieved the call that it will be as usual, until 18h

H4

H4: CMS ECAL (Chiara Amendola)

ECAL has been running in H4 since beginning of July, in pedestal mode or collecting laser data before beam.

On schedule with plans:

Having the system up for so long off and on beam revealed some instabilities in the configuration

e.g. loss of time alignment at the bottom left of RU 42, when under 200 GeV (DAQ window drifting away from physics signal)

We used the beam downtime yesterday to adjust some hardware trigger delays, monitor ECAL DAQ errors, reconfigure the system.

Safety clearance extended to the end of August, to keep the ECAL running in place.

Thanks to everyone for the support, things are running smoothly!

H4 Incoming: CMS HGCAL - Week 31 (Arnaud Steen)

H6

H6 Outgoing Main: ATLAS HGTD (Djamel Boumediene, Stefano Manzoni)

H6 Main: EP PIXEL (Justus Braach)

H6 Parallel: ALICE ITS3 (Paolo Martinengo)

Installed, up & running
Excellent beam, took already quite interesting data during night.

H6 Incoming Main: ATLAS ITK PIXEL (Andre Rummler)

Wednesday we will set up as usual: irradiated modules already in the freezer in the buffer zone. Re-install the second cooling circuit; some improvements (better manifold, additional quad holders using the secondary cooling) for which we have ordered just now material which we hope will arrive on time. Beam setting adjusted to the limitations of the telescope as the last time (10^5). Safety visit agreed for 16:30 on Wednesday.

H8

H8 Outgoing Main: MGTD TRD (Yulia Furletova)

-Installation and the safety inspection done on Friday ( 21 July)
-Work on HV, Trigger and the readout for our setup on Sat(22July)
-Running with pions and lepton beams this week
-Switch to Xe/CO2 on Mon ( 25July)
-Radiation surrvay and disassembly on Wed ( 26July).
-Door interlock issue during the “Free” access on Wed morning.

H8 Main: POKER (Luca Marsicano)

H8 Incoming Main: QFib - Week 31 (Suat Ozkorucuklu)

As parasitic user last week, we had set up our test system, align and took some data with 180GeV/c pions.


Parasitic Users

Reporting for parasitic users is optional, please add your name below:

M2: AMBER (Please Add Your Name Here)

M2: MUonE tracker+ECAL (Please Add Your Name Here)

H6: ATLAS MALTA (Please Add Your Name Here)

H6: MONOLITH (Please Add Your Name Here)

H6: CEDAR-N (Please Add Your Name Here)

H8: SND@LHC Hcal calibration (Marco.Dallavalle@cern.ch)

On Monday 31st morning, four planes of SciFi mats will be added. Safety inspection agreed for Monday early afternoon.
Can the main user in W31 let us know which beams are going to be used? thanks.

H8: QFib (Suat Ozkorucuklu)

As parasitic user last week, we had set up our test system, align and took some data with 180GeV/c pions.

H8: STRAW TRACKER RD (Please Add Your Name Here)

H8: CMS RPC (Please Add Your Name Here)

H6 Incoming: RD42 (Please Add Your Name Here)

AOB

Minutes by the respective speakers, edited by E. B. Holzer and M. Schwinzerl