AOBs:

BLM ASIC:

-       Christos informed Francois on the recent decision for the BLM ASIC design and production. In summary, the complete system was reviewed and found to fulfil the agreed specifications and is on par with the current BLM front-end system.

-       This becomes now the future baseline system and a new production is requested by EP-ESE to cover the needs for the complete SPS

-       Together with Thibaut thanked and commented the significant contribution of Jan Kaplon.

-       Francois asked to bring the information directly to his team in charge of the foundry requests and note to them the need to retain the masks and tooling for the final production around 2027.   

FCC and future needs:

-       Christos informed on the recently given objectives to follow FCC needs and propose potential electronic building blocks for beam instrumentation that could  operate in high radiation (atm though to be between 50-600 kGy/y).

-       Thibaut mentioned some new WGs being set up within the FCC project to feed into the definition of the tunnel civil engineering and will let ESE know about the one related to radiation, in particular.

-       Francois asks before making any proposal externally to allow higher level discussions to take place and define the building blocks his group will be able to commit.