Detection chamber: we have one from CERN, waiting to obtain the technical drawings (should have them around next week). If it turns out it cannot be used, we will have a CF100 (or larger) 6-way cross, can ask the vacuum group for availability (Jose Ferreira Somoza). 

Streak camera: for one-time temporal alignment experiment. Can borrow from CLEAR or AWAKE. Will also need an IR to green shifter to match the streak camera detection window -> discuss with Edu. 

 

Mover: manual would work. Need to bring MCP in and out of beamline. Richard might have available. 

 

Laser-grade (low-reflectivity) CF63 optical viewport at 1030 nm: Need for IP laser transmission into the interaction chamber. Federico might have a spare. 

 

Feedthrough flange: Need for HV and SMA feedthrough from MCP (2 ports minimum). Will order suitable model CF0600P4M from Kurt J Lesker. 

 

I will keep in contact with Stephane Burger regarding the equipment already installed in the interaction chamber.