22/01/24 : Field cage 4 shipment to CERN

Schedule to update for the 26/01

Detectors to be mounted on the FC end of February and March (weeks 9-10), then tests with T2K gas outside, clean the clean room anyway, and then cosmics test.

No electrical field on some detectors in Japan : suspiscion of connection loss on the small 2 pins connector, or the jumper? To be sure: We could add a wire between the 2 pads for the 16 ERAMs of the top TPC. We could ask CERN to add a pin on the pads to ease the connection of the wire and to avoid any issue.
Or conductiong glue on the jumper.