MC meeting
Uzair:
The visible shift towards forward rapidity of produced simulated pions, kaons, and protons. We already checked the beam and target setup in EPOS, Uzair's code, eGeneratorFinal selection. Possible suspect: fragments and tracks produced from fragments interactions.
To be checked for next week.
Bartek:
The number of hits in sim::VertexTrack issue is almost solved — details on Software Zoom.
Sasha:
Xe+La@13,19,30 done. To be done:
Email to collaboration to be sent soon. Xe+La@75 waits till we switch to Alma and new data production (due to dE/dx recalibration). We need to produce Xe+La@150 with V0 finder (after Alma and dE/dx).
Yehor:
p+p:
The position of the S4 counter for p+p in 2011 is established from the data following Daria's procedure. Bartek M. did not propagate any updates on the S4 position based on Daria's findings for p+p in 2010.
To be done: Yehor will start 2011 p+p MC production and will propagate S4 positions in 2010 and 2011 to Bartek Maksiak [SHINE-493] to update the database.
MC post LS2:
Comparison of OfflineQA from data before and after LS2
Pb+Pb:
Production is ongoing. ~13M done.
AOB:
Bartek Kozlowski: Problem with HepMC production file - ERROR: HepMC file event violates momentum conservation between beam and final particles. Sasha confirmed the same error since the beginning of her work. MMP will cross-check with Justyna Cybowska