MC meeting

Europe/Zurich
Zoom Meeting ID
69051046012
Host
Maja Mackowiak-Pawlowska
Alternative hosts
Yehor Bondar, Przemyslaw Adrich
Useful links
Join via phone
Zoom URL

Uzair: 

The visible shift towards forward rapidity of produced simulated pions, kaons, and protons. We already checked the beam and target setup in EPOS, Uzair's code, eGeneratorFinal selection. Possible suspect: fragments and tracks produced from fragments interactions. 

To be checked for next week.

Bartek:

The number of hits in sim::VertexTrack issue is almost solved — details on Software Zoom.

Sasha:

Xe+La@13,19,30 done. To be done: 

Email to collaboration to be sent soon. Xe+La@75 waits till we switch to Alma and new data production (due to dE/dx recalibration). We need to produce Xe+La@150 with V0 finder (after Alma and dE/dx).  

Yehor:

p+p: 

The position of the S4 counter for p+p in 2011 is established from the data following Daria's procedure. Bartek M. did not propagate any updates on the S4 position based on Daria's findings for p+p in 2010. 

To be done: Yehor will start 2011 p+p MC production and will propagate S4 positions in 2010 and 2011 to Bartek Maksiak [SHINE-493] to update the database. 

MC post LS2:

Comparison of OfflineQA from data before and after LS2

Pb+Pb:

Production is ongoing. ~13M done.

  

AOB:

Bartek Kozlowski: Problem with HepMC production file - ERROR: HepMC file event violates momentum conservation between beam and final particles. Sasha confirmed the same error since the beginning of her work. MMP will cross-check with Justyna Cybowska

There are minutes attached to this event. Show them.