RILIS operation from last week : Mg for MIRACLS.
- Laser system ready on Monday night. Optimization performed on Tuesday morning.
- System stable most of the run, except for a few stabilization problems, but corrected from home or by the users.
- A dye change was necessary over the Saturday to Sunday night (call at 1:45am, end of intervention around 3:50am).
- Another call on Sunday but it was not a laser problem in the end.
RILIS setup for the coming week : Ca for COLLAPS.
- 2/3 of the laser system was setup in parallel of the Mg run last week.
- Last laser was setup yesterday. Problem with temperature of the dye circulator was noticed this morning, and a circulator change is ongoing to optimize long term performances.
- Alignment and optimization this afternoon or tomorrow.