target #865 for COLLAPS Ca
- target performed well, users are happy
- yields were stable until at least Saturday evening (Isa came for yields at 20h) - next check on Monday at 7h30 gave slightly lower yields
target #779 LaCx for ISS Sn
- yields and proton scan
- mass marker heated to 50 A without giving much signal - possibly depleted
target #866 UCx VD5 for Miniball SnS
S injection tests ongoing at offline 1
- new oven design max 50 W, aiming for oven temperatures 200˚C - 300˚C and sufficient cooling by contact with base when target is heated to nominal
- target currently undergoing calibration, to be tested at offline with new S injection
- original target change as scheduled on Friday
target #867 UCx VD5 for ISS SnS
- under assembly
- target change scheduled for 26th July
target #856 LaCx prototype for ISOLTRAP Cd
- Mo free block design
- test new heat shield design and coupling, aiming ~50˚C delta T
- target change scheduled next Wednesday
- LaC charges under prepatation by Valentina to be finished for loading next week
target #870 LaCx standard MK1 for CRIS Sb
- target change Aug 1
- back of line heating
- standard temperature profile