RILIS operation from last week : Ca for COLLAPS
- Laser system ready on Tuesday evening and optimized. 
- System stable most of the run, except for a few stabilization problems, but corrected from home or by the users. 
- 2 main interventions on site : 1  dye change and 1 un-related with laser call. 

RILIS setup for the coming week : Sn for HIE ISOLDE

- 2/3 of the laser system was setup in parallel of the Ca run last week. 
- Last laser was setup yesterday. Problem with achieving the wavelength of the first step with the planned laser. Had to change the distribution for the run which took the whole day yesterday. 
- Alignment and optimization performed this morning. Yield check will be done this afternoon for final optimization. 

Other : 

- Blaze switched on by itself last week. No incident to report. It might be because of the interlock with the valve. We need further inspection to check it. 
- Blaze chiller doesn't work anymore. This will be detrimental for the futur run in 2 weeks. We will work on it now that these is ready. If someone if familiar with chiller maintenance, help is welcome.