MEDICIS
Target #848M has been irradiated indirectly on HRS irradiation point until this morning (retrieval happened at 11 am).
Issue with the FC70 (total beam FC) repeller Aqn. Thanks to Miguel who came very quickly to intervene.
Currently being operated. No water leak, too early to say if the vacuum will be an issue again. The aim is to start collecting Ra-224 and Ra-225 from this evening if we can.
Ra-224 will be shipped to Dresden Hospital in Germany and Ra-225 to NPL in London.
179
X. Decrand called C.Duchemin this morning to inform us that the air conditionning is ON for MEDICIS since 10 am. We can already feel the difference. Thanks for that!