TSU CONS Reliability Meeting - 4

Present: M. Blaszkiewicz, L. Felsberger, N. Voumard 

Minutes

This meeting was focused on discussion of the reliability simulations of top-level component representation of the system. They were completed to establish a reliability target for the TSU board based in the context of other systems.  

SPS

Largely overlooked so far, as we tend to focus on LHC. There are significant differences between the system deployment there.

TSU Interconnection

The interconnection is already present - it checks if both TSU BRF singals are synchronized. Whenever one is experiencing problems, it issues only an asynchronous dump, while the other one triggers both synchronous and asynchronous dumps. 

Other connections in the system

The new TSU will get a watchdog, e.g., for when the clock stops or there is a power supply problem. 

Connections between TSU and BIS, BETS, BLM and all others except for the External Trigger (used for a procedure of injecting and dumping directly - in the SPS, it's done via "Early Dump") as well. 

Connection between TSU and TDB is fail-safe (6V, dump - goes to 12V, remove the plug - TDB/TDU trigger itself). Connections to TFO are pulse with active high (IPOC check if both are always sent, same for TFO -> generators). On the LBDS (not SBDS), there is a feedback from TFO to TSU which ensures that each TFO received a trigger from both TSUs (after every pulse, there is a check in XPOC). 

Actions

  1. Next meetings will be online, via Zoom - the recurring invitation needs to be updated.
  2. Whenever the schematics of the design are ready, we can start the bottom-up FMECA analysis.