WLCG-OSG-EGEE Operations meeting

→ Europe/Zurich
28-R-15 (CERN conferencing service (joining details below))

28-R-15

CERN conferencing service (joining details below)

Maite Barroso Lopez (CERN)
Description
grid-operations-meeting@cern.ch
Weekly OSG, EGEE, WLCG infrastructure coordination meeting.
We discuss the weekly running of the production grid infrastructure based on weekly reports from the attendees. The reported issues are discussed, assigned to the relevant teams, followed up and escalated when needed. The meeting is also the forum for the sites to get a summary of the weekly WLCG activities and plans
Attendees:
  • OSG operations team
  • EGEE operations team
  • EGEE ROC managers
  • WLCG coordination representatives
  • WLCG Tier-1 representatives
  • other site representatives (optional)
  • GGUS representatives
  • VO representatives
  • To dial in to the conference:
    a. Dial +41227676000
    b. Enter access code 0157610

    OR click HERE

    list of actions
    Minutes
  • <big> Survey: Migration plan to SLC4 5m
    SA3 would like to know the sites migration plan/timeline to SLC4 OS so they can plan the SLC3 support and associated backporting (e.g. gLite 3.1). Could the ROCs collect this information and report through teh coming ROC reports?
    The official timeline to phase out SLC4 (from the SLC4 team) is 6 months from now)
  • <big> EGEE issues coming from ROC reports </big>
    Reports were not received from these ROCs:

    1. gLite update 16
      (CE ROC): Do we have any news why gLite update 16 caused automatic reconfiguration of services while such a reconfiguration should be done with site admin assistance?

      (UKI ROC): Yet another upgrade full of bugs and problems (with DPM, LFC). This is not acceptable, not only sites should strive to deliver a production quality of service but developpers should too! Some of bugs such as the dpmmgr problem is not only a bug but a sign of very low software development skills - I understand developpers are overworked :) but then this raises the question whether the projects are given enough resources to achieve their goals.

      (DECH ROC): Distinction between major and minor updates: Production update 16 hasn''t been deployed smoothly. In our last regional meeting, many sites expressed their disfavour about the circumstance, that small and major updates all being broadcasted with the same schedule. Major updates should be announced differently and e.g. should be part of a major update (here e.g. "3.1"). The ROCs would then have to take care, that major updates are sufficiently deployed in their region. In this case, we as ROC were not aware enough (though there was a corresponding action about the torque update itself), that this major update was deployed and sites where not warned about it, which caused many problems. It''s a general issue to distinguish between major and minor updates.


    2. (SEE ROC, Aegis site): We see a large number of superficial SAM test JS failures for our gCE (eight) that can only be accredited to SAM WMS problems (rb108.cern.ch). lcg-CE does not have such problems, nor we see such problems for our gCE in the regional SAM SEE-GRID instance. Any chance that SAM WMS performance is improved? Still there are problems with scheduled downtimes in CIC reports, since SAM failures are sometimes reported even during the downtimes. We reopened the relevant GGUS ticket


    3. (UKI ROC): Concerns over possible shift to a policy on no support of auto-updates


  • 16:00 → 16:05
    Feedback on last meeting's minutes 5m
    Minutes
  • 16:25 → 16:55
    WLCG Items 30m
    Reports were not received from these tier-1 sites: BNL, INFN, NDGF, NIKHEF
    Reports were not received from these VOs:
    Atlas

  • 16:55 → 17:00
    OSG Items 5m
    Item 1
  • 17:00 → 17:05
    Review of action items 5m
    list of actions
  • 17:10 → 17:15
    AOB 5m