Present: M. Blaszkiewicz, L. Felsberger, I. Romera, D. Westermann
The meeting centered around the results of the iteration from last time. There were three models presented:
- pessimistic analytical model; assuming yearly checks only and continous demand,
- exact analytical model; assuming yearly checks only and continous demand,
- subset-based model; assuming 12 h inpection interval for some components and 1 year for the rest.
The second part of the meeting switched to the hardware failures and possiblities to gather information about them in the existing BIS infractucture in the LHC and SPS.
Actions:
- We share with Ivan the blind failure modes of CIBM to be checked and confirmed.
- Particularly, if they are indeed critical.
- We send to Ivan list of failures to be checked and ask for the system inventory