BiLD – 04/04/2024
At CERN: Federico, André, Alexandre, Christophe
On Zoom: Janusz, Daniela (late as still mentally on holiday), Simon, Andrei, Igor, Hideki, Janusz, Vladimir, Alexey
Apologies:
Follow-up from previous meetings
- Last BiLD on March 7th
- Last DIRAC certification hackathon was supposed to happen March 21st, but was cancelled because of issues discovered before deploying the release
- Federico I promised to create a new release and install it, but I did not get a review of the needed PRs…
- and, we did not “test” the board from GitHub
- Last BiLDx on March 14th
- For now on, we are not planning regular BildX meetings anymore, but getting updates in this same meeting
DIRAC communities roundtable
LHCb:
Federico+Alexandre+Christophe+Christopher
- Moving to EL9 boxes: started converting existing boxes.
- Moved (before Easter) the default Singularity container to EL9
- we discovered a few sites that provided 15+ years old hardware:
Red Hat Enterprise Linux 9 is distributed with the kernel version 5.14, which provides support for the following architectures at the minimum required version:
- AMD and Intel 64-bit architectures (x86-64-v2)
- and jobs were rescheduled because only x86-64 was there
- we decided to do nothing and accept that we can not run there.
- ARM farm at Glasgow:
- set it up, not yet ran production jobs
Belle2
Hideki
- Still on v7.3, migration will be completed soon, also extension almost ready
ILC/Calice/FCC
André
EGI
Andrei
- WMS system : still investigating, but from time to time there’s a spike of open files.
JINR
Igor
- CTA usage: discussion on GitHub to be done. Main question is how to read the data
- Tested OpenNebula cloud – working smoothly
- Pilots are taking releases from CVMFS
- loads on WNs drastically reduced
GridPP:
Simon, Janusz, Daniela
Topics from GitHub/Discussions
only un-answered topics with discussion updates:
- Old ARC CE interface?
- the configuration would need to move from “ARC” to “AREX” and in theory it would still work everywhere
DIRAC releases
DIRAC projects
DIRAC:
Issues by milestone:
- v8.0:
- 10+ open issues, usual reminder for closing/moving old ones
- No updates on existing ones recently
- v9.0:
- 15+ open issues, as usual some movements
Other issues:
PRs discussed:
DiracX:
- Progress on the Security policy (including the JobPolicy)
- Started preparing some tasks for the hackathon next week
- diracx-web:
- new developer
- 2 new PRs, already merged
- JobMonitor: do operations on jobs
- Integration tests (e.g. login and logout)
- cypress framework (specific to React world)
WebApp:
Pilot:
- Merge of
devel to master: done 12th March: https://github.com/DIRACGrid/DIRAC/discussions/7512
- Federico Did not receive any updates nor complains, so I am assuming everything went smoothly – or not?
- VOs picking releases from CVMFS?
- LHCb (from lhcb CVMFS repo)
- ?
- New PR for
devel completely and finally removing py2
- from previous meeting Janusz some doc to write
DIRACOS:
- from previous meeting Made a new release with
libxml2 downgraded. Issue opened to gfal2 for proper fix
- FTS/gfal developers are going to look at this now
- ==> a new release is there, pending in conda-forge
- Requests for Apple-M2 compatibility
Documentation:
- Building sometimes failing in PRs (not consistently)
OAuth2:
management
diraccfg
DB12
Alexandre
- from previous meeting
- Ewoud opened PR for py3.11 (in progress)
- Federico Can we have DB12 run on ARM
Rucio
Tests
Added PRs for workflow and “submitAndMatch” tests, the main question would be “who can run these tests (they require cert and key secrets)”:
Release planning, tests and certification
AOB
Next BiLD: in 3 weeks
Next hackathon: in 2 weeks?
LHCbDIRAC
- v11.0: deploy board in https://trello.com/b/Ep0PAkbv/deploy-110
- Added the same workflow tests also added for DIRAC
- VOMS backend will be shutdown in June 24
- from previous meeting we need to make sure that all links will be updated
- Christophe will do adiabatically over the coming weeks
- OpenSearch migration?
- BKK MRs: should be ~ready