Participants: Y. Dutheil, P. Trubacova, F. Valchkova-Georgieva, S. Yue
- Files exchange between ABT and Fani
- files OK
- minor issue with boster extraction >1km, for next exchanges need to cut line in 2 with 1 point overlap
- Integration model in PB
- list of points received by Fani and added in the PB integration model
- Fani presently adding all the space reservation for
- control of the position of the dumps confirmed their correct placements
- Question of alcove placement
- minimum distance between entrance of alcove and beamline is 15m
- Pavlina will present shortly the ABT requirement on 15/05 at the integration meeting.
There are minutes attached to this event.
Show them.