Project/slides presented: optical lines from UA43 to RA43 (and UA47 to RA47).

Optical line simulations are ongoing. 

 

Christophe needs to perfom scans to make sure there is no 'pipes' in the depth of interest (~200mm). 

--> try to launch them for next TS

--> William to give the DCUM for both sides: UA43/RA43 & UA47/RA47 (from ECR: final position will be confirmed).