HI-ECN3 - Structural Safety #1
→
Europe/Zurich
ECN3 - Structural Safety
- Bureau de control -> check of SCE consultant’s design to be done by bureau de control after IRP Design Study on timeline after end 2025
- TCC8/ECN3 steel roof beams identified as a fire risk during LSD:
- To be carried out a part as FIRIA
- First to check if the beams are actually loaded and supporting structures, can we measure if they are loaded?
- Consultant to do work, budget on SCE pre-studies
- Painting of beams could happen after dismantling timeline of 2027
- Seismic/sonic study needed for decay volume, surface building, target complex:
- Possibility to do sonic tests to do characteristic of speed velocity of seismic waves and understand soil category (standard in CE in southern Europe)
- Can use bore holes for hydro-geoleoical study, if still open
- Consultant to do work, budget on SCE pre-studies
There are minutes attached to this event.
Show them.
The agenda of this meeting is empty