• HV Scan completed
    • HV scan points 
      • 9400V (1/8) [e-log] during Run 476760 [e-log];
      • 9450V (2/8) [e-log] during Run 476785 [e-log];
      • 9500V (3/8) [e-log] during Run 476875 [e-log];
      • 9300V (4/8) [e-log] during Run 476929 [e-log];
      • 9250V (5/8) [e-log] during Run 476991 [e-log];
      • 9200V (6/8) [e-log] during Run 477002 [e-log];
      • 9000V (7/8) [e-log] during Run 477023 for few LBs [e-log] and during Run 477037 [e-log];
      • 8800V (8/8) [e-log] during Run  477048 [e-log].
    • RPC in not ready because of HV channels used in HV scan (9000V) [e-log and e-log] and (8800V) [e-log].
    • HV channels used for the HV scan are set back to standard: VConfig=9350V, unmasked all connected gas gaps [e-log].

  • HV
    • BOL.B.09.CO.Ly1.HV ramped down to 5000V, ramped back up to 9100V [e-log].
    • BOL.B.09.CO.Ly1.HV ramped down again, ramped back up to 8800V; BML.C.07.CO.Ly1 ramped down, ramped back to 8800V [e-log].
  • LV
    • BMS4C10 Vpd channel was on "overcurrent" [e-log].

  • ADC board with high temperature
    • Change of alarm thresholds for the LV board with high temperature (Y_3605_X8_C5/H1/br03/crate5/slot05) [e-log].
    • Hardware connected to the LV board with high temperature (Vee and Vpd for sectors 3 and 4 Pi Ly0 and Ly1) switched off [e-log].

  • HV issues during TS
    • BML.B.01.CO.Ly1, BMS.C.02.PI.Ly1, BOS.A2.02.CO.Ly0 and BMS.B.04.CO.Ly0 HV channels ramped down [e-log]. 
    • BOS.A2.02.CO.Ly1 HV channel tripped [e-log].  
    • BML.B.01.PI.Ly1 and BML.B.01.PI.Ly0 HV channels ramped down [e-log].