1. MD for beam bumps

    2. Plan a bias voltage scan this week with a TT20 BSI

    3. Determine bias foil hole size and whether it is present on each BSI (Correlation with Johannes measurements?)

    4. Ask Ryan (??) to make simulations to quantify bias foil hole’s impact on signal.

    5. Ensure gain settings are logged

    6. By the end of summer:

      • compilation of the tests/analysis

      • decide for a technical solution or if nothing conclusive delay activity to after LS3