● Moteur et embrayage

 

Morad informs, that some gearbox types are available in radiospares. Option to buy what they have and check conformity.

 

Federico: We should ask more money on NACONS for 2025 (either add to running project, or ask as a new contribution)

For the motors + gearbox we wait until Morad gets full price offer

 

 

TODO David: clarify with Federico whether money requested (already)

TODO David: clarify with Federico whether a BIFT presentation should be made by operators for installations not needing movable parts

TODO Morad: get completed offer for motors + gearboxes

 


● Design Flex

Aurelie: we might be able to use short radiation tolerant cables, SHV radhard connectors are needed on patchbox.

Michel: High voltage bias goes through one of the pins in 2x SUBD 26 high density connectors. Signals are connected by crimping. This is standard done in ISOLDE and we'll re-copy to the new installations.

Chiara: Control 1+2 will be done in ML. First done by Ben or William, second by  Morad or Christophe). The third control will be in PM section, either David or Michel.

 

TODO Lucas: present on the next meeting already available 3D models 


● BSI Et BSP à remplacer au prochain YETS

Christophe confirms, that all foils are the titanium version. Confirms as well that all the tanks are available.


● Integration

 

TODO Aurelie: contact F. Galieazzi and/or Sylvain Girod to start discussion of the integration. Christophe provides necessary info to Aurelie for follow up on integration.

 


● ECRs

Aurelie proposes the document 'Secondary Emission Monitors (SEM) activities for the SPS NA CONS Part 1 project', currently circulating in overleaf, to be released. 

 

TODO David: Add MIchel, Lucas, Morad as co-authors

TODO Aurelie: release the document

 

 


● Grilles à produire

Foreseen to be produced for LS3:


◦ BSG.210350 (proto)
◦ 3 BSG P42
◦ 3 BSG TT20, TT21, TT23
◦ 3 BSG TBIU
◦ 4 BSP to BSG -> TT24

 

(everybody agrees)

 

TODO Morad: contact P. Frichot to produce grids of 0.5mm (P42), if success we go with this solution, if not there are old grid in stock, which can be used.

TODO All, next meeting: discuss if option using wires is possible for grid 0.5mm as a last resort